Saudi Aramco Test Report: SATR-A-2006 25-May-05 Mechanical Calibration Test Report-Test Relief Valve

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SATR NUMBER DATE APPROVED DISCIPLINE

SAUDI ARAMCO TEST REPORT


Calibration Test Report-Test Relief Valve SATR-A-2006 25-May-05 Mechanical
PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

EQUIPMENT ID NUMBER EQUIPMENT DESCRIPTION EQPT CODE SYSTEM P.O. NUMBER

LAYOUT DRAWING NUMBER REV. NO. S/U SYSTEM FACILITY

TASK COMPLETED DATE RFI No. REQUESTED INSPECTION

Calibration of "TEST" Relief Valve


Certificate No. Date of Calibration:

Valve Manufacture: Valve Size:

Valve Serial Number: Valve Type:

Test Medium: RV No. / Tag No.:

Bonnet Leak Test:

Bellow Leak Test: Seat Leak Test Pressure:

Details of Pressure Gauge Used For Calibration


1 Serial No: 4 Cerificate No:

2 Make: 5 Re-Calibration Due Date:

3 Date Calibrated:

REMARKS:

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: Name, Initials T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:
and Date:
QC Inspector PID Representative
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials
Name, Initials and Date:
and Date:

QC Supervisor Proponent and Others


Quality Record Approved: Name, T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date: Organization,
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED