WELLTEST

PROCESS DIAGRAM

PVS Vent Line


Rig Floor Oil Line
Gas Line
Water Line
Air Line for burners
Flowhead 10K Air Line for Emergency Shut Down
Kill line Hydraulic Line for ESD valves
(Rig)
Hydraulic
ESD Buttons
Flow Wing Valve
X-ov er 3"1502 W x 2"1502 T,

2" low troque valve for rig k ill


Master Valve ESD
PANEL

Coflexip Hose
3" 10K Psi x 45'

Burner Boom Burner Boom

Air line Air line

Oil Guns Oil Guns


Oil lines to booms -3" 602 each side
Gas Flare Gas Flare
Gas lines to booms - 3" 602 each side
3" 602 Gas SSV Skid 3" 1502
Manifold 10K Psi
Air hoses to port side
boom - 3" 602

Texstem Pump
Vertical Dual Surge
Air hoses to starboard

Tank -100Bbl Capacity


boom - 2" 602

Header
3"Data
ESD &

Transfer Pump Skid 2000 BPD


Lo Pilot
500 psi

Choke Manifold DWT


3" 10K Psi PSV's
(2" Choke)
Propane
Propane
ESD & Hi Pilot
850 psi
3" 602 Oil
Manifold

Flame
Surge Tank Gas Vent
arrestor / Relief Line to
skid overboard
Rig Air

Water Line to overboard

ESD & Hi Pilot


1150psi
Relief Line to overboard

PSV's
M

M
M
M

LAB CABIN S W T Container

STEAM EXCHANGER

Horizontal Separator - 1440 Psi


/ 42" x 10ft

ESD Button at Port side near lab cabin. STEAM GENERATOR 4.5MMBTU
`
`