PBR 01 Tech
PBR 01 Tech
PBR 01 Tech
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES), EPCC-16 AT RAJASTHAN REFINERY COMPLEX AT
PACHPADRA FOR RAJASTHAN REFINERY PROJECT (RRP), BARMER, RAJASTHAN, INDIA.
BIDDING DOCUMENT : DC/B224-501-PA-T-8700/3001
NAME OF BIDDER :
Sl. Reference of Enquiry Document Bidder’s Query EIL’s Reply
No. Part / Vol. Page No. Clause No. Subject
Page 1 of 1
FORMAT FOR BIDDER'S QUERIES - 2ND SET
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES), EPCC-16 AT RAJASTHAN REFINERY COMPLEX AT PACHPADRAFOR RAJASTHAN REFINERY PROJECT (RRP) OF M/s HRRL
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700
914 of 5882 B224-501-17-44-DS-1017 , Rev 0 Clarified water transfer pumps - 425 m3/hr @ 6.5 kg/cm2
Both the clauses are contradictory. Please confirm shall be provided in
7 Tendernotice_3
which capacity to be followed. amendment
847 of 5882 B224-501-17-44-DS-1017 Clarified water transfer pumps - 200 m3/hr @ 40 mwc
The line size of suction line of Clarified water Transfer Please follow tender
14 Tendernotice_4 1322 of 5882 B224-17-44-502-1115 , Rev 0 Suction line of Clarified water Transfer Pump - 16"
Pump is mentioned as 16". Please re-confirm the size. specifications
In the cartridge filter inlet and outlet manual
butterfly valve shall be provided. The same shall be
Automatic valves are not
15 Tendernotice_4 1331 of 5882 B224-17-44-502-1124 , Rev 0 Cartridge filters used for vessel isolation. Hence, we are not providing
required
automatic valves in the inlet and outlet. Please
confirm.
At the outlet of each cartridge filter we don’t
Please follow tender
16 Tendernotice_4 1331 of 5882 B224-17-44-502-1124 , Rev 0 Cartridge filters anticipate any flow meter. Flow meter shall be
specifications
provided in the common outlet. Please confirm.
The auto dump valve at the outlet of the cartridge
Please follow tender
17 Tendernotice_4 1332 of 5882 B224-17-44-502-1125 , Rev 0 Line From Cartridge Filter filter shall be automatic butterfly valve. Please
specifications
confirm.
Please re-confirm the painting/coating/lining Acid/Alkali Resistant Tiling shall
18 Tendernotice_3 1033 of 5882 B224-502-17-44-DS-1064 , Rev 0 Solar Pond Feed Sump
requirement of Solar Pond feed sump be considered
Please provide the datasheet for Y-strainer and T -
19 General Strainer & static mixers
Strainer
datasheet shall be developed
by contractor during detail
20 General Please provide the datasheet for Static mixer
engineering
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
We understand that incase of normal feed stream to RO-DM plant are not
4.4 - TREATED available (means CTBD+ treated effluent from ETP + Boiler blow down) to
In case the normal feed stream to RO-DM
RAW WATER (as RO-DM plant. In that case we can use treated raw water as feed flow to RO-
3 36 of 1135 plant are not available ……..Feed flow to RO- Bidder understanding is corrrect.
B224-501-17-44-PA-T-8700 Back-up Feed to the DM plant, and Feed flow to RO-DM plant shall be maximum 1422 m3/hr
DM : 1422 m3/hr (max)
RO-DM Plant) (max)
KIndly confirm whether our understanding is correct
Table – 4: Treated Raw Water Quality
Oil & Grease is given as BDL and
4.4 TREATED
Note 2: BDL: Below Detectable
Tendernotice_3 (B224-501-17-44-PA-T- 36 & 37 of RAW WATER (as Please note O&G shall be NIL at inlet of RO, Kindly confirm the O&G values O&G value of treated raw water shall
4 Limit/Instrument Detection Limit, BDL for Oil
8700) 5882 Back-up Feed to the ater RWTP be BDL
& grease and
RO-DM Plant)
Mineral oil are 4 mg/l & 1 mg/l respectively.
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
Point no. 31, 32, 35, 41, 49, 50, 51, 55 & 60:
MOC CS with Glass Flake Vinyl Ester Lining
for Degasser Tower, MB Feed tank, Mixed
Tendernotice_3 (B224-501-17-44-PA-T- We propose CS with natrual rubberlining for lined pressure vessels/tanks
11 861 of 5882 Equipment list bed exchanger, RO-III Feed Tank, Dual Please follow tender specifications
8700) which is suitable for application
Media Filters-II, Activated Carbon Filters-II,
Auto Backwash Filters-II, RO-IV Feed Tank
& RO-IV Cartridge Filters
Tendernotice_3 (B224-501-17-44-PA-T- Point no. 31: Degasser Tower: Dia 3.2 m X We propose lower diameter of DGT by maintaining the velocity up 55
12 861 of 5882 Equipment list Please follow tender
8700) Ht. 4.0 m3/hr/m2
Tendernotice_3 (B224-501-17-44-PA-T- Point no. 44 & 45: Flash mixing tank - II and Separate Flash mixing tank and flash mixer is not require for HRSCC.-II
13 862 of 5882 Equipment list Please follow tender
8700) Flash mixer - II Kindly confirm
Schematic Flow SFD for CPU package is not available in tender document. Kindly provide P&ID's of CPU already provided in
14 Tender Notice 4 General Schematic flow diagram for CPU package
diagram the same. tender. Please follow that
PIPING
The Order of Precedence of documents
shall be as follows with document at level 1
4. Job specifications(specific to Particular
Tender Notice - 1 - General Terms & 2 (PDF page
16 1.7 Job only)
Condition of Work Contract no. 195)
5. Drawings
In case of any conflicts between various documents/Drawings, we presume
6.Special Condition of contract
that the Line MOC & Line size specified in the Tender P&ID Stands valid. Line size & MOC specified in tender
7.Technical Specification
P&ID's are minimum requirements.
In case, different material & line size is Please confirm.
specified in the tender drawings
Tender Notice-3 - Scope of
(Schematic Flow Diagram, PFDs, P&IDs,
17 works/supply(Plot plan & water) B224- 234 of 5882 5
etc.), the material & line size
501-17-44-SS-1001, Rev. 0
specified in the drawings shall be provided
as a minimum
P&ID (Plot plan & water) B224-501-17- 01 of 05 to 05
- P&ID with PMS and Line size
44-DWI-1001, Rev. 0 of 05
Line Size Criteria to be based on following
pipe/line velocities:
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
RWTP B224-17-44-501- 1122, Rev. 0 RO Permeate from RO DMP 18" - A1K with
P&ID - RO Based DM Plant - RO-1 Pneumatic Operated Gate Valve
Catridge Filters - RWTP B224-17-44- Catridge Filter Inlet and Outlet 10" - A1K with Based on good Engg. Practice and earlier experience with EIL, we suggest
23 502- 1124, Rev. 0; - - Pneumatic Operated Gate Valve to use Pneumatic Operatd Butterfly Valve for A1K Class for ON-OFF Please follow tender specifications
P&ID - RO Based DM Plant RO III RO-III to Permeate Tank & RO-II Feed Tank Service. Please confirm.
Skids B224-17-44-502- 1132, Rev. 0; 10" - A1K with Pneumatic Operated Gate
Valve
RO Permeate tank line 14" - A1K Isolation
P&ID - RO Based DM Plant - Reverse
Gate Valve
Osmosis Skid-1 - RWTP B224-17-44- Based on good Engg. Practice and earlier experience with EIL, we suggest
24 - - Please follow tender specifications
502- 1126, Rev. 0 to use Butterfly Valve for A1K Class. Please confirm.
RO-II Feed pumps suction line - 24" A1K
RWTP B224-17-44-502- 1125, Rev. 0
Gate Vavle
Tender Notice - 5 - Standard
specification for Electromagamnetic 1601 OF 5882 - Electromagamnetic Flow meter We presume that, Isolation and By-pass valve is not required for Magnetic
Flow meter 6-52-0002, Rev. 4 flowmeter. isolation valves for magnetic flow meter is
25
Please confirm. not required
P&ID (Plot plan & water) B224-501-17-
01 of 05 - P&ID
44-DWI-1001, Rev. 0
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
P&ID (Plot plan & water) B224-501-17- B/L FIRE WATER TAPPING LINE
30 01 of 05 - P&ID- Battery limits Please provide the B/L Fire water tapping line size .
44-DWI-1001, Rev. 0 SIZE IS IN BIDDERS'S SCOPE
P&ID (Plot plan & water) B224-501-17- Shall be provided during detail
31 01 of 05 - P&ID- Battery limits Please provide the B/L Plant air tapping line size .
44-DWI-1001, Rev. 0 engineering
P&ID (Plot plan & water) B224-501-17- Shall be provided during detail
32 01 of 05 - P&ID- Battery limits Please provide the B/L LP Steam tapping line size .
44-DWI-1001, Rev. 0 engineering
P&ID (Plot plan & water) B224-501-17- Shall be provided during detail
33 01 of 05 - P&ID- Battery limits Please provide the B/L CW supply tapping line size .
44-DWI-1001, Rev. 0 engineering
P&ID (Plot plan & water) B224-501-17- 4" Drinking Water Tapping shall be
34 01 of 05 - P&ID- Battery limits Please provide the B/L Drinking water tapping line size .
44-DWI-1001, Rev. 0 provided at B/L.
Supply of Instrument Air & Plant Air till Supply of Instrument Air & Plant Air till
commissioning & during operation of 3 commissioning of RWTP & RO-DM
Tender Notice - 3 - Process Design
months after commissioning of RWTP Plant & during operation of 3 months
Basis B224-501-17-44-DB-1001, Rev. 28 of 5882 9) Note - 1
shall be in scope of RWTP Contractor after commissioning of RWTP & RO-
1
since RWTP shall be commissioned Bidder assumes that, Bidder should provide for Instrument Air & Plant Air DM Plant shall be in scope of
before commissioning.. piping for RWTP and RO DM Plant with provision of connection with Contractor since RWTP & RO-DMP
35
Compressors supplied by Bidder and Plant Compressed Air System. Please shall be commissioned before
confirm. commissioning of compressed air
system (Plant Air & Instrument Air).
Cooling water supply for the
compressed air system shall be in
scope of RWTP contractor.
PRE-BID QUERIES Supply of Instrument Air & Plant Air till
commissioning of RWTP & RO-DM
Plant & during operation of 3 months
after commissioning of RWTP & RO-
Bidder assumes that, Bidder should provide for Instrument Air & Plant Air DM Plant shall be in scope of
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
piping for RWTP and RO DM Plant with provision of connection with Contractor since RWTP & RO-DMP
35
Compressors supplied by Bidder and Plant Compressed Air System. Please shall be commissioned before
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 confirm. commissioning of compressed air
Reference of Enquiry document system (Plant Air & Instrument Air).
Sl.No Query EIL Reply
Cooling water supply for the
Part / Vol.No . Page No Clause No. Subject compressed air system shall be in
Supply of Instrument Air & Plant Air till scope of RWTP contractor.
commissioning & during operation of 3
Tender Notice - 3 - Scope of
months after commissioning of RWTP
works/supply(Plot plan & water) B224- 231 of 5882 4
shall be in scope of RWTP Contractor
501-17-44-SS-1001, Rev. 0
since RWTP shall be commissioned
before commissioning..
Tender Notice - 3 -Process Design Cooling Water supply for the compressed
Bidder assumes that, Bidder to provide Cooling water supply system for the
36 Basis B224-501-17-44-DB-1001, Rev. 28 of 5882 9) Note - 1 Air system shall be in scope of RWTP bidder understanding is correct
Compressors supplied by Bidder and not Others. Please confirm.
1 Contractor.
Contractor shall design, engineer, supply
Tender Notice - 3 - Scope of and install the fire protection system
works/supply(Plot plan & water) B224- 304 of 5882 1.1.1 inside Package (Water Block) facilities viz. Bidder presumes that scope of work shall be as per the layout drawing ( fire
37 501-17-44-SOW-5000, Rev. A (RWTP, RO-DM, CPU & Associated water P&ID DWG) given along with the Tender for RWTP, RO-DM and CPU BIDDER TO FOLLOW BID
Facilities) DOCUMENT
only. Please clarify about the associated faclties scope.
Fire water P&ID B224-501-17-44- Fire water P&ID for RWTP, RO DM , CPU &
- -
10101, Rev. A Associated Facilities
Tender Notice - 3 - Scope of
Contracor shall supply the piping in Based on site conditions, Bidder shall select Prefabricated spool pieces Bidder can select based on site
38 Supply/Works(Piping) B224-501-16-43- 333 of 5882 3
Prefabricated Spool Pieces requirement and site assembly and welding for Piping. Please confirm. condition.
SOW-8700, Rev. A
ELECTRICAL
1.Bidder's understanding is correct.
1. As per document no : B224-501-16-50-sow-8700(Rev A) Scope of Supply
& Work (Page 339 of 5882) only Power Transformers 66/6.9KV and
Distribution Transformers 6.6/0.433KV are in the scope. Tie Transformer
5. Canopy shall be provided for all
and Generator Transformer or its related STG Panels/parralel operation with
outdoor equipments except transformers
grid / CPP Equipments mentioned in the tender document are not applicable
3.GENERAL / & Capacitor Banks. However, Roof slab
in this project. please confirm
39 Tender 3 (B224-501-17-44-PA-T-8700) 180 of 5882 DESIGN for all transformers, Capacitor banks and
CONSIDERATIONS removable type shed for Generator 2. Bidder's understanding is NOT correct.
2.As Per Tender Document 4 - Page 116/248 - B224-000-16-50-DS-1003 -
transformers & Tie transformers shall be Bidder to follow tender requirement for
for Power Transformer and Page 111/248 - B224-000-16-50-DS-1004 - for
provided. the provision of roof slab for the
Distribution Transformer , in the datasheet both are outdoor installation. We
transformer bay.
understand that both Power transformer and distribution transformer shall be
installed outdoor without roof slab/shed. Please confirm
Note:
1. The rating and number of emergency 1. Bidder understands that Emergency Power at 6.6KV Level will be
1.Bidder's understanding is correct.
DG set shall be finalized during detailed provided by client ( Refer : B224-501-16-50-sow-8700(Rev A) Scope of
5.2 Power Source engineering. The emergency DG set for the Supply & Work - Exclusions point no:4.3 - page356 OF 5882).
40 Tender 3 (B224-501-17-44-PA-T-8700) 183 of 5882
details plant shall cater to emergency loads of Hence, Emergency DG(either in 6.6KV or 415V) is not in bidder scope.
various units, utility and offsite areas… Please confirm.
2.Bidder's understanding is correct.
2. 1 no. Dedicated DG for the black start 2. Black start is not in bidder's scope. Please confirm
shall be considered.
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
Bidder understands that, for both Fire alarm and Telephone system, DC
45 Tender 3 (B224-501-17-44-PA-T-8700) 205 of 5882 5.6.14 DC SYSTEM 1.5 Fire Alaram and 1.6Telephone System source can taken from Plant Main DC system itself. Separate DC Panel is Bidder's understanding is correct
not required for Fire alaram and Telephone system. Please confirm
5.7.2 CABLE As per Tender document 6, sheet 72/1000 S.No:345 the cable tray is
4 - Type of cable trays : Galvanized Bidder to refer Engineering Design Basis
46 Tender 3 (B224-501-17-44-PA-T-8700) 208 of 5882 LAYING mentioned as FRP. Please confirm the type of cable trays to be considered
prefabricated for material of cable tray.
PHILOSOPHY by bidder
2.0 PROJECT
CONTRACTOR shall refer the Key Single Key Single Line Diagram is not found in the Tender Documents . Please Being issued through technical
48 Tender 3 (B224-501-17-44-PA-T-8700) 491 of 5882 DESCRIPTION/
Line Diagram (attached with tender) furnish the same amendment.
DATA
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
51 Tender 6 2527 of 5882 Item Code :14CC General Please provide vendor list for 66kV Isolating breaker panel Bidder to follow Bid requiremnent
SPECIFICATION
FOR 5.3.2 Bus bars shall be of high conductivity Bidder understands that Bidder can decide high conductivity Electroytic Being issued through technical
53 Tender 8 4349 of 5882
High Voltage electrolytic aluminium or copper Aluminium or Copper conductor material for the busbars. Please confirm amendment.
Switchboards
SPECIFICATION
FOR 5.27.1 Bus bars shall be of high conductivity
54 Tender 8 4413 of 5882
Medium Voltage electrolytic aluminium or copper
Switchboards
O&M
Labor required for carrying out other sundry
activities shall be hired by the
Bidder understanding is correct in
contractor on as required & as agreed with
general. For detail scope, Refer Scope
HRRL. However, contractor shall Bidder understands that contractor shall include cost for other required
Tendernotice_3 (B224-501-17-44-PA-T- of Works/Supply
55 410 of 5882 2.0- General augment the above list of manpower as per manpowers like helpers, store keeper , and sweeper in his quoted lump sum
8700) Operation Contract
the instructions of HRRL for price for operation period. Please confirm.
Specifications ( Doc No:B224-
carrying out trouble free and successful
501/502/509-17-44-OM-1001)
operation of RO-DMP, CPU and
RWTP.
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
Not Acceptable.
Piles shall be terminated with minimum embedment of 300mm into hard clay
Tendernotice_3- Geotechnical data Termination criteria of piles has been
layer / soft rock subject to SPT N-value more than 50. If this condition is
67 Doc No B224-501-81-41-GTD-8700 815 of 5882 6.1.1 Termination of piles clearly specified in tender document
achieved within or less than 15.0m below cut-off-level, pile termination can
Rev. 0 and the same shall be religiously
be permitted at this level. Please confirm if this is acceptable.
followed.
PROCESS
We asked carbon media vendor to confirm for the fluoride removal from
activated carbon media but vendor does not given guarantee for fluoride
removal from 1.6 ppm to 1.0 ppm for drinking water application.
As per vendor "carbon is used for Drinking water application for taste &
4.0 Design Inlet Raw
Tendernotice_3 (B224-501-17-44-PA-T- 24, 25 & 948 Notes: point no. 6: Fluoride level in drinking odour application but not for fluoride. Carbon may remove Fluoride but can
68 water and treated Please follow tender
8700) of 5882 water shall be < 1 ppm after treatment not guarantee that inlet value of 1.6 ppm will be reduced to 1 ppm. "
raw water quality
Please note that as per IS10500 drinking water standards permissible limit
for fluoride is 1.5 ppm (max).
Kindly confirm
Process Datasheet Activated carbon filter - I & II: As per tender
Tendernotice_3 (B224-501-17-44-PA-T- 965 & 1013 of ACF backwash velocity shall be maintained same as service water velocity.
69 no: B224-502-17-44- backwash rate (velocity) for ACF is given as Please follow tender
8700) 5882 Hence Service water and Backwash water flow will remain same.
DS-1009 & 1047 18 m3/hr/m2
Please note that RO III high pressurized reject water is directly feeding to
HRSCC II and other source of water from backwash/centrate waste holding
sump - II is feeding to HRSCC II.
Schematic flow diagram: RO-DMP: It is
Drawing No.: B224- being observed that as per flow diagram RO In this case there will not be proper blending of two different water source in
73 Tendernotice_4 1281 of 5882 Please follow tender
17--44-502-0101 III reject water is directly feed HRSCC II HRSCC II,
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
We observed that only one vendor is approved for GRE pipes. We request you to Please folloe tender
77 Tender Notice 2887 of 5882 Vendor List GRE Pipes Vendor propose additional vendors which helps in getting competitive prices.
We presume that graded site shall be handed over to the successful bidder for the Refer Clause No. 1.0 of Part-C (UG
proposed water block package area and the same is not in the scope of this Civil) of Doc No. B224-501-81-41-
78 Tender Notice 109 of 5882 A.4.1.1 Site grading package. Please confirm. SOW-8700.
In the referred clause, we understand that compound wall is in bidders No compound wall in Bidder's scope.
79 Tender Notice 48 of 5882 3.1 Compound wall scope, Please furnish the length of the compound wall
As per the referred clause, settlement are mentioned as 25 mm / 40 mm for Bidder to follow Bid requirement.
B 4.1.1 Isolated footing & rafts. However, actual settlement could be adopted based
80 Tender Notice 130 of 5882 Sr. No. 5.1 to 5.3 Foundation Design Minimum requirements. on the IS 1904 (Table-1). Please confirm.
UF system shall be designed based
on outlet HRSCC TSS < 30 ppm.
As per specified clause document, UF has to be designed with raw water
qualities as mentioned in Table 1 of doc: B224-501-17-44-DB—1001, but
inlet TSS as per table 1 i.e. 350 max raw water quality, which is not treated
outlet of HRSCC to design UF module . Hence, kindly confirm that bidder can
81 B224-501-17-44-DS--1008 904 of 5882 - Feed water qualities for UF design design UF system as per TSS value at the outlet of HRSCC.
The UF recovery of 90 % with inlet TSS of 30 mg of l (outlet of HRSCC) Please follow tender
Document No : B224-501-17-44-DB-- seems to be on higher side. Therefore kindly allow bidder to design UF
82 1001 26 of 5882 5.1 Recovery of UF min 90 % recovery as per UF system supplier design .
Kindly allow bidder to Design of UF system including recovery, operating Please follow tender
Document No : B224-501-17-44-DS-- flux, backwash system shall be as per UF manufacturer recommendation with
83 1010 906 of 5882 - UF backwash system respect to feed water qualities. Kindly confirm.
We have understood from bid document that, one part of clarified water from Bidder understanding is correct
HRSCC (backwash will be routed to UF feed tank by gravity & other part will
Document No : B224-501-17-44-DB-- Routing of clarified water from HRSCC routed to HRSCC (process ) by pump with provision of routing to horticulture
84 1001 27 of 5882 6 backwash water tank. Kindly confirm.
As per mentioned clause maximum flow is higher than design flow, & as per Please follow cascade aerator
schematic diagram of RWTP, feed flow to cascade aerator is 6507 m3 of hr. datasheet
Document No : B224-501-17-44-DS-- we presume that cascade aerator should be designed for 6507 m3 of hr .kindly
85 1001 895 of 5882 - Design flow of cascade aerator confirm
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
Document No: B224-501-17-44- Combination of treated raw water used as In order to design RO DM plant with correct TDS value, Kindly confirm the
89 DB—1001 36 of 5882 4.4 feed water for RO-DM plant combination of treated raw water can be used as feed water for RO-DM plant.
We presumed that there is no OSID is applicable for both RWTP & RO DM OISD norms shall be followed by
Document No: B224-501-17-44- OSID for overall plot plan of RWTP & RO plant layout preparation & the complete RWTP & RO DM plant is classified contractor
90 DB—1001 47 of 5882 3.1 DM plant under Non-hazardous area. Kindly confirm.
In order to avoid space occupied by Hypo dosing system & in the view hypo Please follow tender
storage, safety handlingfacilities, we request you to allow bidder to dose clo2
Schematic flow in drinking water’s disinfection instead of Hypo since we are already dosing
91 Drg No: B224-501-17-44-1001 1278 of 5882 diagram Hypo dosing for Drinking water disinfection ClO2 in RWTP pretreatment. Kindly confirm
Document No : B224-502-17-44-SS- Recovery of RO-IV skids shall be 55%
1001 250 of 5882 2.13 There is a discrepancy between two clauses on recovery of RO skid. We (minimum)
Document No : B224-502-17-44-DS- presumed that recovery of RO-IV skid can be designed with min 50 %
92 1060 1028 of 5882 PDS Recovery of RO-IV skid recovery.
Document No : B224-501-17-44-SS- HCl & NaoH shall be free supply to
1001 223 of 5882 bidder by HRRL
& & 247 of 5882
B224-502-17-44-SS-1001 2.1
95 B224-17-44-501-1135 1314 of 5882
& &
B224-17-44-502-1149 1356 of 5882 There is a discrepancy between two clauses on supply of HCl required for both
RWTP & RO DM plant. We presumed that HCl will be supplied by HRRP to
96 P&ID Supply of HCl contractor on free supply. Kindly confirm.
Indicative layout of We understood from indicative RWTP layout, width of road way within Please follow tender specifications
97 B224-501-17-44-1002 1276 of 5882 RWTP Width of roadway inside Treatment plant treatment plant battery limit is 6 m. kindly confirm
There is a discrepancy between two clauses on capacity of clarified water shall be provided in amendment
B224-501-17-44-EL-1001 847 of 5882 S.No: 16 storage tank. But We presumed that capacity of tank will be 300 m3 . Kindly
98 B224-501-17-44-DS-1016 913 of 5882 - Capacity of clarified water storage tank confirm.
There is a discrepancy between two clauses on capacity of centrifuge to be shall be provided in amendment
B224-501-17-44-EL-1001 847 of 5882 S.No: 21 designed. But we presumed that capacity of centrifuge will be 25 m3 of hr .
99 B224-501-17-44-DS-1021 918 of 5882 - Capacity of Centrifuge Kindly confirm.
B224-501-17-44-EL-1001 847 of 5882 S.No 17 There is a discrepancy between two clauses on capacity of pump. But we shall be provided in amendment
100 Capacity of clarified water transfer pumps presumed that capacity of pump will be 425 m3 of hr. Kindly confirm.
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
As per process datasheet , air scouring rate of 750 m3 of hr for both DMF & Please follow tender specifications
ACF seems very high, we request you to finalize air scouring rate as per
122 B224-502-17-44-DS-1009 966 of 5882 Process datasheet Air scouring rate for DMF & ACF CPHEEO manual .
Bidder understanding is correct
As per referred clause Drinking water quality shall confirm to IS: 10500, We
Document No : B224-501-17-44-DB- presume outlet quality as per IS: 10500 is applicable only for the parameters
123 1001 (Rev.1) 24 of 5882 4 Design Raw water & Treated water quality given as inlet raw water quality in the table. Kindly clarify.
Sludge thickener is not envisaged in
As per referred datasheet the fluid handled is mentioned as thickened sludge, tender scope.
124 B224-501-17-44-DS-1021 918 of 5882 Process datasheet Fluid Handled We presume Sludge thickener is not envisaged in the scope. Kindly clarify.
As per the referred datasheet note no. 4, It is mentioned that “the pump Please follow tender
discharge shall be provided with a recirculation line with RO for pressure and
flow
125 B224-501-17-44-DS-1024 922 of 5882 Process datasheet Note No. 4 control as per the dosing requirements”. Kindly clarify the requirement.
Bidder understanding is correct.
As per referred clause the maximum pumping capacity by raw water pumps
will be 8100 m3 of hr, but the RWTP is designed with 7335 m3 of hr in-line
with net treated water production of 6500 m3 of hr . so balance 765 m3 of hr
126 B224-501-17-44-DB-1001 23 of 5882 3 Pumping flow of raw water pumps will not be treated in RWTP. Kindly check our understanding & confirm.
Kindly furnish ionic break-up for TDS of 50 mg of l for designing RO system ionic breakup in boilerblowdown may
and to meet the required DM water quality as per tender. This will help us to be considered in same ratio as
127 B224-502-17-44-DB-1001, Rev.0 35 of 5882 4.2, Table-2 TDS Value arrive blended feed characteristics to RO system. applicable for CTBD
The Incoming 52" Raw Water line
As per referred clause, incoming raw water line to cascade aerator is from Butterfly valve to RWTP shall be
provided via pipe rack at B of L (Battery limit), whereas same is shown as laid underground and shall be as
shown in Scope Dwg. No. B224-501-
PART – III tapping point TP-5 in Scope Dwg. No. B224-501-81-41-04551.
81-41-04551 (TP-5). Supply and
TECHNICAL SECTION Kindly confirm battery limit location.
installation of this line including supply
of matching flange is in scope of
128 1370 of 5882 - Clarification in B of L location package contractor.
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package The Incoming 52" Raw Water line
from Butterfly valve to RWTP shall be
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 laid underground and shall be as
shown in Scope Dwg. No. B224-501-
Reference of Enquiry document 81-41-04551 (TP-5). Supply and
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. installation of this line including supply
Subject
of matching flange is in scope of
128 Dwg. No. B224-501-16-43-8700 1370 of 5882 - Clarification in B of L location package contractor.
As per referred clause, two incoming utility lines are shown in pipe rack at B Refer revised Above Ground B/L dwg.
PART – III of L.
TECHNICAL SECTION Kindly provide the details of utility lines such as service, MOC, pipe size, etc.
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
TP2:-4" OWS line with manhole at
BIDDING DOCUMENT : B224-501-17-44-PA-T-8700 battery limit shall be provided. All
OWS piping within battery limit upto
Reference of Enquiry document manhole at battery limit is in scope of
Sl.No Query EIL Reply
Part / Vol.No . Page No Clause No. Subject Package Contractor.
TP3:-4" Drinking water line shall be
provided at battery limit of Package.
Further distribution of Drinking water
within battery limit is in scope of
Package contractor.
TP6:-Drinking water line from RWTP
to Drinking water sump is in scope of
Package Contractor (Size shall be as
per respective P& ID).
TP7:-Treated water line from RWTP to
Treated water sump is in scope of
Package Contractor (Size shall be as
per respective P& ID). Updated P&ID
No: B224-17-44-501-1111 shall be
134 Dwg. No. B224-501-81-41-04551. 1368 of 5882 - Clarification in scope provided in amendment
PART – III Refer revised Above Ground B/L dwg.
TECHNICAL SECTION
As per referred clause, Kindly provide size & MOC details for all incoming
135 Dwg. No. B224-502-16-43-8700 1371 of 5882 - Requirement of details lines shown in the scope of Battery limit – 1, 2 & 3 for RO-DMP & CPU.
PART – III Refer revised Above Ground B/L dwg.
TECHNICAL SECTION
As per referred clause, Kindly provide size & MOC details for all incoming
136 Dwg. No. B224-501-16-43-8700 1370 of 5882 - Requirement of details lines shown in the scope of Battery limit for RWTP.
As per referred clause, 5 nos of CT blowdown lines are shown, whereas in Refer revised Above Ground B/L dwg.
Dwg. No. B224-502-16-43-8700 only one nos of CTBD treated water line is
PART – III shown in B of L-1.
TECHNICAL SECTION Kindly clarify.
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
143 Dwg. No. B224-501-17-44-10101 1365 of 5882 - Clarification in scope of fire water lines
As per referred clause, we understand that Fire Water Pump House & BIDDER TO REFER UPDATED P&ID
PART – III Satellite Fire Station is not under EPCC-16 scope of work. ATTACHED WITH THE
TECHNICAL SECTION Kindly confirm. AMMENDMENT
147 2 Software
PRE-BID QUERIES
Hence as per the above clause, we presume that only 3D model database
shall be submitted to client at different model review stages. However, no
supply of licenses for 3D modeling software is considered in Bidder’s scope.
150 B224-000-86-41-SP-34 Rev.0 h Documentation and software requirements Please confirm.
From the Stated clause, we observed that “for minimum equipment rating Being issued through technical
refersingle line diagram”. However Overall Single Line Diagram is not amendment.
B224-501-16-50-SOW-8700 attached with Tender specification. Kindly provide the same for our better
151 (Electrical Scope of Supply & Work) 339 2.1 & 2.2 Key Single Line Diagram. Scope understanding.
From the stated clause, we observed that “ All motor feeders up to 55 kW Being issued through technical
shall be provided with communicable type Electronic Motor Protection amendment.
Relay”. However, we are considering Intelligent Motor Protection Relay
B068-999-16-50-EDB-1001 (IMPR) for the same to optimize the Electrical Switchgear Building
152 (Electrical Design Basis) 201 5.6.6 Motor Starter Dimension. Kindly confirm.
Bidder's understanding is correct
From the stated clause, we understood that “Emergency power will be
received at 6.6kV isolation breaker panel and will be stepped down to415V
through one number of 6.6 of 0.433 kV emergency distribution transformer”.
B224-501-16-50-SP-8700 Further it shall be connected to EPCC panel.
In this regard, we presume that 2nd incoming supply for EPCC panel shall be
153 (Job Specification- Electrical) 492 2.0, A. Emergency Power Distribution for RWTP taken from PCC outgoing feeder. Please confirm.
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
The minimum Silica from the RO-I reject is approximately 100 ppm and above. With a
SFD for Reverse
recovery of 65%, the anticipated Silica in RO-III reject is around 300 -350 ppm. The
Osmosis Mixed Bed
The reject from RO-I is collected in RO-III Feed saturation index of Silica is exceeded and this will result in high Silica scaling. The
187 Tendernotice_4 1281 of 5882 based Demineralization Please follow tender specifications
Tank and fed to RO-III skid similar impact is also applicable for all other ions like Fluoride, Phosphates etc. Hence,
Plant - RO-DMP -
request you to provide a complete pre-treatment (HRSCC-DMF-ACF-ABF-UF) before
Sheet 2 of 4
RO-III Skid similar to RO IV skid. Please confirm.
Process Datasheet The Ultra Filtration System operating pressure is The maximum operating pressure which an Ultra Filtration system can handle is 3.0 -
maximum design pressure of UF system
188 Tendernotice_3 977 of 5882 B224-502-17-44-DS- 4.0 -5.0 kg/cm2 and the design pressure is 7.5 4.0 kg/cm2 and the maximum design pressure shall be 5.0 kg/cm2 and the same is
shall be based on supplier recommendation
1019 kg/cm2 confirmed by all the UF membrane manufacturers. Please confirm.
Process Datasheet The Ultra Filtration System operating pressure is The maximum operating pressure which an Ultra Filtration system can handle is 3.0 -
maximum design pressure of UF system
189 Tendernotice_3 906 of 5882 B224-502-17-44-DS- 3.5 -4.0 kg/cm2 and the design pressure is 6.5 4.0 kg/cm2 and the maximum design pressure shall be 5.0 kg/cm2 and the same is
shall be based on supplier recommendation
1008 kg/cm2 confirmed by all the UF membrane manufacturers. Please confirm.
SFD for Reverse Dosings provided in HRSCC-I (Process)
Osmosis Mixed Bed 1.Lime
The probability of Silica exceeding the Saturation Index is more in RO-IV reject.. Lime or Dolomite lime shall be provided by
190 Tendernotice_4 1281 of 5882 based Demineralization 2.FeCl3
Hence, request you to provide provision for Dolomite dosing in HRSCC-II contractor.
Plant - RO-DMP - 3.Polyelectrolyte (PE)
Sheet 1 of 4 4. Soda Ash
191 Tendernotice_6 2218 of 5882 Suppliers list for HRRL Vendor List for SOOT Blower Please provide us the Supplier list for Root Blowers Bidder to follow bid requirement.
12. RO-DM Plant
RO-IV Skids - 62 m3/hr permeate
41 of 5882 configuration
- 55% Recovery Recovery of RO-IV skids shall be 55%
192 Tendernotice_3 Both the clauses are contradictory. Please confirm which clause to be followed.
(minimum)
13. Guarantee RO-IV Skids - 62 m3/hr permeate
41 of 5882
Parameters - 50% Recovery
Process Datasheet The inlet solid consistency of centrifuge is mentioned as 5% which seems to be very
centrifuge to be designed based on
193 Tendernotice_3 917 of 5882 B224-501-17-44-DS- Centrifuge - Inlet solid consistency high. The expected sludge from the HRSCC will have a sludge consistency of
HRSCC sludge outlet consistency
1021 max.2%. Please confirm whether the same can be considered for our design.
Process Datasheet The inlet solid consistency of centrifuge is mentioned as 5% which seems to be very
centrifuge to be designed based on
194 Tendernotice_3 970 of 5882 B224-502-17-44-DS- Centrifuge - Inlet solid consistency high. The expected sludge from the HRSCC will have a sludge consistency of
HRSCC sludge outlet consistency
1013 max.2%. Please confirm whether the same can be considered for our design.
FEED POLISHED CONDENSATE
Please provide the process datasheet for
B224-502-17-44-EL- 1.Feed Polished Condensate Exchanger EXCHANGER & TRIIM COOLER DATA
195 Tendernotice_3 878 of 5882 1. Feed Polished Condensate Exchanger
1001 2.Trim Cooler SHEET WILL BE PROVIDED IN THE
2. Trim Cooler
TECHNICAL AMENDMENT.
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
CIVIL
Bidder to note that pile foundation shall be
Please confirm foundation system shall be decided based on detailed soil investigation
203 Tendernotice_3 815 of 5882 6.1 Foundation for major structures / Facilities adopted for all major structures/facilities as
report post bid.
per bid requirements.
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
The following type test for High Voltage induction Please note we shall submit the valid type test reports of all tests listed. Please No deviation on the standard specification
motor confirm acceptance. is acceptable.
Full load test and measurement of Voltage,
Current, Power, Slip, Efficiency and Power
factor at 100%, 75% and 50% load
•Temp Rise test
•Momentary overload test
•Noise Level
•Over speed
6-81-1031 Rev.3 (INSPECTION AND TEST
•Measurement of Starting Torque, Starting
222 PLAN FOR HIGH VOLTAGE INDUCTION Page 5 of 6 4.2 Motor Type Test
Current , full Load Torque, Pull out torque by
MATOR)
JEC (Logarithmic proportion Current method
II).
•Tan delta test
•Measurement of radial and axial clearance
between fan and stationary parts and
Measurement of air gap.(if provision for
measurement is not available in fully
assembled motor stage records/calculations to
be reviewed)
Synchronous motors shall be provided with class No deviation on the standard specification
F insulation unless otherwise specified in the is acceptable.
data sheet. The permissible temperature rise by
6.1.1 Insulation and
223 Tendernotice_8 4481 of 5882 the resistance method, above the specified We have considered class F insulation for all motors.Please confirm
Bracing
ambient temperature shall be limited to class-B
insulation.
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
1.2, Solar power unit shall be connected to the Bidder's understanding is correct.
nearest 415V MV switchboard for export of solar
225 Tendernotice_3 524 of 5882 1. GENERAL power. The solar power systems shall remain Solar power will be evacuated at 415 V LV. Please confirm acceptance.
synchronized with the refinery complex power
supply for generation of solar power
1.5 The minimum guaranteed supply of energy Bidder to follow Technical Specification
from the solar power systems shall be minimum requirement.
1400 KWh/year for 1 KWp PV panel in the first
year of generation after commissioning.
4.1.2 Array Junction boxes (AJB)/ Main Junction AJB is not applicable for string inverters as string inverters will do the function of AJB.
Bidder to follow Technical Specification
227 Tendernotice_3 527 of 5882 4. SCOPE OF WORK requirement.
boxes (MJB)/ DC Junction Boxes (DCJB) Please confirm acceptance.
5.1 Solar PV modules Bidder to follow Technical Specification
5. TECHNICAL As per Specification we understand that Solar Modules will be manufactured in India
228 Tendernotice_3 528 of 5882 5.1.6 The offered crystalline Solar PV modules requirement.
SPECIFICATIONS except Solar cell. Please confirm acceptance.
must be manufactured in India.
5.9.2 Metering and Instrumentation for display of Bidder to follow Technical Specification
systems parameters and status indication to be requirement.
5.9 Data Monitoring provided. The data monitoring system/ datalogger Separate Solar SCADA OWS will be provided for monitoring purpose. Please confirm
229 Tendernotice_3 537 of 5882
System of PV plant shall have the provision of interface of complete acceptance.
data through MODBUS TCP/IP protocol with RJ45
port
Process
230 Tender Notice:3 7 5 Treatment Scheme For The Raw Water We understand that the bidders scope begins at the inlet of cascade aerator. Raw Water Feed line from RWTP B/L
Treatment Plant : The raw water from the The raw water at the inlet of cascade aerator shall be provided by the client. to cascade aerator in scope of RWTP
battery limit shall be directly routed to a Kindly confirm. contractor.
cascade step aerator
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
Kindly confirm.
236 Document No. Page 3 of 13 1. INTRODUCTION “facilities has been envisaged to produce DM We understand that the Net Treated DM Water Net Treated DM Water Production is
quality water @ 1350 m3/hr
B224-502-17–44–DB–1001 1400 m3/h.” Production required is 1350 m3/hr.
Kindly confirm.
“The Design Capacity of the RO-DM Plant
shall be 1350 m3/h”
2. DESIGN CAPACITY
OF RO-DM PLANT
237 Document No. Page 6 of 13 4.4 TREATED RAW “complete backup of Treated Raw Water Kindly confirm the complete backup of treated Raw water to be considered Treated raw water shall be
B224-502-17–44–DB–1001 WATER (as Back-up ~1475 m3/h is considered from the Treated from the Treated water reservoir to the RO DM Plant incase feed streams to backup/balance water to RO-DM
Feed to the RO-DM Water Reservoir.” the RO-DM plant are not available. Plant. refer point no.101
Plant)
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
4.7
257 SCOPE OF WORK 366 of 5882 4.6 For cables of instruments which although We understand for Service water & Cooling water For the signals referred in the query,
not in Instrumentation cables from
INSTRUMENTATION Contractor’s scope, however their make-up pumps signals, DM plant feed pumps instrument to JB, JB to PLC is not in
connectivity is Bidder scope of supply & also erection
RWTP & RO-DM/CPU envisaged in RWTP package PLC based signals, Treated water reservoir & sump signals, of the same is not included in Bidder's
control system and RO-DM & CPU package scope.
PLC based control system like Service water Drinking water system cable from PLC
& Cooling water make-up pumps signals, DM to MCC Not in bidders'cope.
plant feed pumps signals, Treated water
reservoir & sump signals, Drinking water
system signals envisaged to be connected to
RWTP package PLC system
RRP, M/s HRRL Drinking water system cable from instrument to JB, JB to PLC & PLC to MCCis
not in Voltas scope of supply , also erection of the same is not included in our
scope, please confirm.
258 SCOPE OF WORK 370 of 5882 5. Power Supply The supply and laying of the power cables Please provide length of cable need to consider for power cable from RO-DM Bidder to refer cl. 1.7-b) of
corresponding to these UPS supply to -CPU UPS to ETP cabinet (BY other) & Purchaser’s DCS/PLC. Or do we have to Instrumentation Job specifications
consider separate UPS for ETP PLC system. doc. (B224-501-16-51-SP-8700).
INSTRUMENTATION ETP cabinets (by others) &Purchaser’s
DCS/PLC cabinet in SRR-6 shall be by
Contractor
RWTP & RO-DM/CPU
RRP, M/s HRRL
259 JOB SPECIFICATIONS 421 of 5882 1.6 a) Approximate cable As per RWTP layout provided with tender page no. 1256 SRR-14 are shown in Bidder to follow the cable distance
RWTP area (300 X 125m), specified in Instrumentation Job
specifications doc. (B224-501-16-51-SP-
8700).
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
261 JOB SPECIFICATIONS 432 of 5882 5.9 Contractor shall route the major runs of Cable duct drawings are provided for MS duct, please provide drawing for The duct fabrication drawing (7-52-
multi-pair FRP duct. 0254) as attached in tender shall be
INSTRUMENTATION (home-run) cables on FRP cable ducts only referred. However, referred drawing is
for GI Duct (not MS). Bidder shall
RWTP & RO-DM/CPU develop suitable drawing for FRP duct
RRP, M/s HRRL based on it. The FRP ducts shall be
designed to withstand the load of
cables with 100% capacity as per the
respective duct sizes.
262 GUIDELINES FOR 3042 of 5882 7 PLC Configuration shall be TMR or Quad, SIL- Please confirm requirement of SIL3 PLC configuration. Provide area As already specified in GUIDELINES
3 certified for all the process units as per classification for WTP plant FOR INSTRUMENTATION doc., SIL-3
INSTRUMENTATION IEC61508 PLC shall be considered where SIL-3
loops are applicable.
Preparation of Area classification is in
bidder's scope.
PRE-BID QUERIES
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
267 Part-III 34 / 5882 4 Design inlet stream. Individual water qualities are specified in tender. However, we request Customer to Please follow tender
Cooling water BD quality provide combined water quality which will be fed to RO plant for Design purpose.
Boiler blow down quality
Treated ETP effluent
268 Part-III 414 / 5882 4 Utilities free of cost at RODMP, CPU & RWTP Please clarify as the two statements are contradictory. Plant Air & instrument air shall be
provided by contractor till 3 months
after commissioning
1278 / 5882 Note:8 – supply of instrument air & plant air till
commng. & 3month operation by Contractor.
Schematic flow
diagram RWTP
269 Part-III 356/5882 B224-501-16-50-SOW- Supply, laying and end termination of 66 KV Please furnish the following for our information.
8700 incomer power cables up to 66 KV isolating
Rev. A breaker panel Gas insulated switchgear (GIS) 1) Location of Upstream 66 KV switchgear.
within substation. However, plug/socket 1. Upstream 66 KV switchgear shall be
installed in CPP substation.
arrangement for termination of 66KV cables 2) Make & model of existing 66 KV breaker.
shall be part of the GIS panel to be supplied by 2. Shall be informed to successful bidder.
270 Part-III 2980/5882 TECHNICAL 4.0) All cable trays, fittings and accessories shall We understand that, inter-plant cabling, solar plant shall be GI trays, whereas inside As per Instrumentation job specifications
REQUIREMENTS be made of the fiberglass and shall be buildings FRP type trays to be used. Kindly confirm. (B224-501-16-51-SP-8700), Instrument
corrosionresistant and fire retardant cable trays (for Instrumentation related
Complete cable tray work, GI cable trays, tray cables) shall be fabricated from FRP.
covers, supports, racks, cable trenchesfor intra-
plant, plant communication Bidder to refer Engineering Design Basis
for material of cable tray.
ll.
347/5882 mm.
271 Part-III 211/5882 5.9.5 Process plant / Building / Please note that we do not have any underground cables which are prone to Bidder to follow tender requirement.
ShedSubstation (Cable Cellar) - Armoured cable mechanical damage. Except for underground cables, we would like to use
unarmored cable. Kindly accept
203/5882
273 Part-III 3061/5882 3.1.7 Flameproof- No As we have not envisaged any hazards in water treatment plant, We are considering Bidder to follow bid requirement.
the proposed water treatment plants as Non-hazardous area and safe.
Local Panel
requirement
Note-3 In general, the local control panel shall In view of this , we are offerings the electrical equipment without explosion proof /
be weatherproof with explosion-proof / flame- flame proof.
proof
(EExd) JB, push-buttons, selector switches, lamps
etc. and Intrinsically safe HMI & Alarm
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
Kindly confirm.
274 Part-III 359/5882 6.9) Key Single Line Diagram We could not locate the referred drawing. We request customer to furnish the Being issued through technical
B224-501-16-50- same. amendment.
SOW-8700
Rev. A B224-501-16 -50-
00001
275 Part-III 4407 / 5882 - SPECIFICATION FOR MEDIUM VOLTAGE We understand this specification is applicable for 415V Switchgear Boards.Pl. Bidder's understanding is correct.
SWITCHBOARD clarify.
276 Part-III 4412 / 5882 5.16 …...However circuit breaker panels and fixed We propose fixed type switchboard shall be doublefront execution as it reduces the Bidder to follow tender requiremnet.
type switchboard shall be in single front length of the board.
execution only.
277 Part-III 4413 / 5882 5.27.1 Bus bars shall be of high conductivity electrolytic We have considered Aluminium bus bar. Bidder to follow tender requiremnet.
aluminium or copper supported on…….
278 Part-III 4413 / 5882 5.27.5 The hot spot temperature of bus bars, including Temperature rise shall be as per relevant IEC/IS standard. Bidder to follow tender requiremnet.
joints, at design ambient temperature shall not
exceed 95 ° C under normal operating
conditions. However, for silver plated joints, the
allowable maximum temperature shall be 115°C.
279 Part-III 4417 / 5882 8.1 Generally the feeders of three main categories Kindly specify whether MCCB or SFU to be used as SCPD(Short circuit protecting Bidder to follow tender requirement and
are identified as circuit breaker, motor starters device) for Supply and Motor feeders. technical amendment.
and MCCB or switch fuse.
280 Part-III 4418 / 5882 8.4 Control transformer shall be provided for each We propose Control supply for the modules will be provided through control supply Bidder to follow tender requirement and
FVR/FVNR/SFC starter/MCCB+C starter/feeder bus which takes the supply from one no. of adequate rated CST in each bus section. technical amendment.
modules or bus section of the PMCC/MCC Each motor feeder/module will not be provided with individual CST because the
switchboard having contactor control feeders as above arrangement will meet the requirement.
specified in the datasheet/job specification or
elsewhere.
281 Part-III 4418 / 5882 9.1.1 Circuit breakers shall be air break, draw-out type We understand this clause is applicable for Air circuit breaker and for Bidder's understanding is correct.
and 3/4 poles as specified in the datasheet/job MCCB/MPCB/MCB. All applicable MCCB/MPCB/MCB shall be fixed type only.
specifications.
282 Part-III 422 / 5882 2.4.1 PLC make: As per vendor list attached in this BHEL make Valmet DNA (Erstwhile-Metso DNA) based control system is proposed As per the tender requirements,
tender for control & monitoring of RWTP, RO-DM & CPU Package. Bidder to follow the Vendor list
attached in tender.
Location This system is manufactured by BHEL at Electronics Division, Bangalore under
collaboration with valmet Automation, Finland and is the latest hardware having
powerful features. BHEL is offering similar controls for unit ratings upto 800MW
supercritical sets.
2.4.2 RWTP: PLC control system in SRR-14 rack room,
PLC system Engineering consoles, Operator
consoles & View only Operator Console in SRR-
14
Engineering room. Please confirm the acceptance.
282 Part-III 422 / 5882 As per the tender requirements,
Bidder to follow the Vendor list
PRE-BID QUERIES
attached in tender.
NAME OF WORK : WATER BLOCK (RWTP, RO-DMP, CPU & ASSOCIATED FACILITIES) Package
283 Part-III 350 / 5882 2.39 Electrical control system (ECS) We understand that ECS/SAS system is not part of RWTP bid package, please inform Bidder to follow technical bid
whether bidder's understanding is correct. requirement.
Please clarify the bidder's scope related to interposing relay panel, transducer panel
& dummy panel and its battery limit.
2.1 to 2.6
284 Part-III 206/ 5882 5.6.15 VARIABLE FREQUENCY DRIVE Please inform the voltage level to be considered for motor rating more than 6.6KV to be considered for motor rating
MV Inverter 700kW? more than 700kW
i) Motor kW rating less than 315kW at 415V
without bypass ,
ii) More than 315kW & up to 700kW at voltage
upto 690V without bypass (refer Note-2)