Bill Movement and Document Check List Sheet

MEP WORKS ( PL/FF & HVAC ) IN 50 SCO 3D at Wave Mega City


Name of Work/ Contractor/WO No.: Centre Project, Sector-32, Noida / M/S DD MEP ENGINEERS /
W.O.:IN13/WO/WCC/18-19/293

Bill No. : RA - 02

Type of Bill (Tick Appropriate):Advance/Ad-hoc/Balance of RA Bill/Final Bill/Release of Retention Money

Authority Approval Date Name Signature Remarks


Vendor's Invoice Date 6/11/2019
Submittion by Contractor 6/11/2019
Asst. Manager - QS & Billing 6/11/2019 Reshu Walia
Component Head/PMC
Parcel Head / PMC
Project Director/PMC
Any Other(Pls specify)
Component Head/CLIENT
Project Director/Client
PMO(CONTRACTS &QS)
Accounts
BUSINESS HEAD
MD
VC
Check list for Supporting documents, to be filled by Project QS

Documents Available(Y/N) Tick if Not Applicable

Vendor's Invoice on letterhead with PAN/TIN/Service Tax No. Y


Measurement Sheets signed by Vendor & verified by Project Billing Engineer Y
Bill Abstract certified by Component Head Y
Escalation Sheets Y
Insurance Policies
Performance BG
Labour License N
Muster Roll/Labour Report certified by Component Head N
PF Challans NA
Service Tax Challans NA
Debit Not for water/electricity or other causes NA
Material Delivery Schedule NA
Store Receipt in case of Material Supply NA
Test Certificates NA
Material/Makes Approval Note by Component Head NA
QA/QC Certificate NA
Safety Report NA
Reconciliation Statement (Cement) NA
Reconciliation Statement (Steel) NA
Reconciliation Statement (Other Materials) NA
BBS NA
Approved deviations NA
Approved extra /substituted items NA
Material challans NA
Consumption Sheet of Base Rate Material NA
Approved Extension of time NA
Initial & Final Levels & Compaction Certificate (in case of Earth Fillig) NA
Testing/Commisioning Certificate NA
Completion/Taking Over Certificate by PD NA
Defects/Snag List jointly signed by Vendor and PD NA
NOC/License required for operation NA
O/M Manual NA
Training to Wave O/M staff Certication by PD NA
Guarantee/Warranty Documents NA
As-Built Drawings NA
Site Clearance Certificate by PD NA
No Claim certificate by vendor NA
BG for DLP in lieu of Retention money NA
Any other Documents depending on the work and as per contract (Please specify) NA
*Non-relevant documents may be marked as "Not Applicable".
* *Documents permanent in nature can be submitted one time and marked as "Submitted already"

Asst. Manager - Q.S & Billing A.G.M Projects(MEP)


( Reshu Walia ) (Name & Date)

G.M Projects Deputy Manager Compliance Project Director


(Name & Date) (Name & Date) (Name & Date)

PMO(Contracts & QS) Accounts


(Name & Date) (Name & Date)
M/S DD MEP ENGINEERS
PAYMENT CERTIFICATE Date of this Certificate: 11-Jun-19
Name of Project : Infra 13 Pvt.Ltd. RA Bill No. RA-2
Scope of work : Plumbing ,Firefighting Works for parcel 2B Club at WMCC Bill Cycle Period UPTILL 31/05/2019
Net Original Contract Value (after
Old Work Order Infra 13 Pvt.Ltd. 272,225
discount if any)
LOI/Work Order No: W.O.:IN13/WO/WCC/18-19/293 GST@18% 49,001
Max. Retention Money 5% of Contract
Start Date/WO Date : 20.10.2018 13,611
value

Date of completion : 19.04.2019 Extra/Substituted Items Amount, if any 0

Owner Name : Infra 13 Pvt.Ltd. Total Revised Value of Contract 321,226


Consultant/Vendor : M/S DD MEP ENGINEERS
Pan No.: BVBPS4181F Measurement taken upto 31.05.2019
GSTIN No. : 09BVBPS4181F1ZE Document Checklist Attached ? Y
DLP Period : 12 Months Material Advance 0
Hold for DLP : NA Recover Till Date 0
Cost Center : SEC32.WMCC.2B.1083 Balance to recover 0
S.NO. Description Upto Previous Bill (Rs.) This Bill (Rs.) Cummulative (Up to Date)

A WORK Done On Site 217860 32803 250663


A1 Price variation on Material 0 0 0.00
Other Escalation (pls specify)
Total A 217860 32803 250663
B Deduction for Wave Supplied Material 0.00
C Gross Payment before GST (A-B) 217,860 32,803 250,663
D TAXES on C
Add SGST @ 9% 19607 2952 22560
Add CGST @ 9% 19607 2952 22560
BOCW/Labour cess @1%
Add other taxes (specify)
Total D 39215 5904 45119
E Gross Payment with Tax C+D 257,075 38,707 295,782
F Advance Payments (On Which Tax Not to be Paid)
Mobilisation Advance
Machinery Advance
Total F 0
G Advance Payments (On Which Tax to be Paid)
Advance on Order
Secured Advance /Material Advance 0 0
Total G
Sevice tax on A3 Only When advance Not Recoverable
H Total F 0 0 0
I RECOVERIES/DEDUCTIONS
Mobilisation Advance 0
Secured Advance /Material Advance as per paid in 0 0 0.00

Debit for Work Done by other Agency


ad-hoc paymeny made already
J Total Payble(H-I) 257,075 38,707 295,782
K Less other Deductions
Retention money @ 5% on C 10893 1640 12,533
Insurance
PF
Water & Elect.
others (to be specified)
Less other taxes
TDS @1% on (J-C) 2179 328 2,507
Total K 13,072 1,968 15,040
J NET PAYABLE AMOUNT ( J- K ) 244,004 36,739 280,743
NOTE : A/C please review & confirm the accuracy of this payment released. Check the fresh taxes, advance and previous payments if any)

Asst. Manager- QS & Billing Asst.G.M Projects (MEP)


(Reshu Walia) (Name & Date)

CLIENT

Add. G.M Projects Project Director


(Name & Date ) ( L . Singhal )

PMO (Contracts & QS) Accounts


(Name & Date) (Name & Date)
Client:-Infra 13 Pvt.Ltd.
Project:- Wave Mega city centre Sector-32 Noida (U.P)
Contractor :-DD MEP ENGINEERS
WO No.:- W.O.:IN13/WO/WCC/18-19/293
Scope : Plumbing and Fire Fighting Work 2B Club
Material installation - RA-2
PARCEL 2B Club (PLUMBING & FIRE FIGHTING SERVICES)

As per work order QUANTITY AMOUNT


Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount
Fire Fighting System
Receving handling & Erection of ISI marked portable fire
extinguishers conforming to IS 15583, wall mounted type, wall
brakets complete in all respact as per standard item with all
1
accessories. Delivery hose & nozzle whereever required
including fixing an walls as per the direction of Engineer- in-
charge.
(Make: Minimax/ Cease Fire/Safex/Safeguard/UFS)
water co2 type 9 Lt. capacity NOS. 2 50 100
ABC dry Type 6 kg capacity NOS. 2 50 100
Reciving handling & erection and testing of ISI markred ERW
2 M.S. pipe C-Class………….complete as per drawing & direction
of engineer-in-charge

Pipe make:-Jindal
25 NB (IS: 1239,4.0 mm thick) RM 498.00 105.00 52290.00
Against installation @ 80% 84.00 498.00 0.00 498.00 41832.00 0.00 41832.00
Against Testing@ 15% 15.75 498.00 0.00 498.00 7843.50 0.00 7843.50
Against commissioning Handing over @ 5% 5.25 0.00 0.00 0.00 0.00 0.00 0.00

32 NB (IS: 1239,4.0 mm thick) RM 18.00 110.00 1980.00


Against installation @ 80% 88.00 18.00 0.00 18.00 1584.00 0.00 1584.00
Against Testing@ 15% 16.50 18.00 0.00 18.00 297.00 0.00 297.00
Against commissioning Handing over @ 5% 5.50 0.00 0.00 0.00 0.00 0.00 0.00

40 NB (IS: 1239,4.0 mm thick) RM 29.00 130.00 3770.00


Against installation @ 80% 104.00 29.00 0.00 29.00 3016.00 0.00 3016.00
Against Testing@ 15% 19.50 29.00 0.00 29.00 565.50 0.00 565.50
Against commissioning Handing over @ 5% 6.50 0.00 0.00 0.00 0.00 0.00 0.00

50NB (IS: 1239,4.0 mm thick) RM 55.00 160.00 8800.00


Against installation @ 80% 128.00 55.00 0.00 55.00 7040.00 0.00 7040.00
Against Testing@ 15% 24.00 55.00 0.00 55.00 1320.00 0.00 1320.00
Against commissioning Handing over @ 5% 8.00 0.00 0.00 0.00 0.00 0.00 0.00

65NB (IS: 1239,4.0 mm thick) RM 52.00 205.00 10660.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ3
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount
Against installation @ 80% 164.00 52.00 0.00 52.00 8528.00 0.00 8528.00
Against Testing@ 15% 30.75 52.00 0.00 52.00 1599.00 0.00 1599.00
Against commissioning Handing over @ 5% 10.25 0.00 0.00 0.00 0.00 0.00 0.00

80NB (IS: 1239,4.0 mm thick) RM 95.00 260.00 24700.00


Against installation @ 80% 208.00 95.00 0.00 95.00 19760.00 0.00 19760.00
Against Testing@ 15% 39.00 95.00 0.00 95.00 3705.00 0.00 3705.00
Against commissioning Handing over @ 5% 13.00 0.00 0.00 0.00 0.00 0.00 0.00

150NB (IS: 1239,4.0 mm thick) RM 24.00 550.00 13200.00


Against installation @ 80% 440.00 24.00 0.00 24.00 10560.00 0.00 10560.00
Against Testing@ 15% 82.50 24.00 0.00 24.00 1980.00 0.00 1980.00
Against commissioning Handing over @ 5% 27.50 0.00 0.00 0.00 0.00 0.00 0.00

Same sa in item above but of G.I. Class B-medium duity for drange
3
pipe
M 12.00 105.00 1260.00

20NB (IS:1239, 3.6 mm thick)

Receving, handling & Erection in position ISI marked cast iron


Wafer type butterfly valves (PN 16) as per IS:13095, with SS
4 disc, SS shaft, SS seating rings, SS internal fastening, EPDM
seat, CS external nuts-bolts including transporting to worksite
etc.

80 MM NB NOS 2.00 300.00 600.00


Receving & Fixing of 20 mm bore and 30 meter long hose (high
pressure rubber braided hose pipe as per IS:444 or Thermo plastic
(Textile reinforced) fire hose pipe as per IS 12585) and hose reel,
(The complete assembly shall be capable of withstanding the
hydrostatic test pressure 21 kg/sqcm), for first aid fire fighting
conforming to IS : 884, with 180o full swing drum, fixing brackets, 5 mm
dia shut off Stainless steel nozzle, connecting directly from the riser
5 through 40 mm dia. MS (Class C) pipe with sockets, elbows, nipples, NOS 2.00 460.00 920.00
40x20 mm reducer, 20 dia pipe, 20 mm dia. hand lever operated
isolating ball valve, etc. including providing operating instructions on a
metal plate and fixing it near hose reel. The system shall be complete in
all respects as per drawings and directions of Engineer-in-charge.

Receving & Fixing Stainless steel ISI marked 63 mm. dia. male
Instantaneous pattern short branch pipes with 15 mm dia. Nozzle as
per IS : 903, suitable for hydrostatic test pressure 21 kg/sqcm and
6 suitable for interconnections to hose pipe coupling as required. NOS 2.00 50.00 100.00
(MAKE : Newage / Safeguard / Padmini / Getech)

Receving & Fixing ISI marked RRL (IS : 636, type-A) fire hose pipe 15
meter long and 63 mm dia with ISI marked (IS : 903) suitable for
hydrostatic test pressure 21 kg/sqcm, Stainless steel male and female
coupling bound and rivetted to hose pipes with copper rivets and
7
copper wire complete as required. (MAKE: Jayshree / Newage /
NOS 4.00 50.00 200.00
Padmini / Safeguard / Getech / Mitras)

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ4
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount
Receving & Fixing standard carbon steel fireman axe with rubber
8 insulated handle tested to 20000 Volts. (MAKE : Newage / Safeguard / NOS 2.00 50.00 100.00
Padmini / Getech)
Receving & Fixing stainless steel orifice plates at appropriate places
to restrict the pressure up to 3.5 to 7.0 Kg/ Cm2 at different floors on the
hydrant / sprinkler system and yard hydrant. It shall be inserted
between the flange and hydrant valve. The size of plate being 150 mm,
9 100 mm or 80 mm dia (as per the case), the orifice diameter to be not NOS 2.00 150.00 300.00
less than 50% of the internal dia of pipe into which it is fitted and the
plate thickness shall not be less than 6 mm.

Receving & Fixing of 50 / 25 mm dia G.I. inspecting and testing


assembly with 50 mm dia and 25 mm dia ball valve, sight glass and
10 connection to the drain line, screwed jointing by teflon tape as shown in NOS 2.00 1000.00 2000.00
drawings or as required at site to complete the system in all respects.

Receving & Fixing UL listed water flow detectors / switches (Vane


type) for sprinkler system, shall have sensitivity in the range of 4 to 10
US gallon per minute and static pressure rating of 450 PSI including
accessories, junction box, suitable for indoor / outdoor mounting. The
11 detector shall respond to water flow in the specified direction after a
preset time delay that is field adjustable, complete as required suitable
for fixing on fire pipe including connection for wiring. (Make : System
sensor)

For 80 mm diameter pipe. Set 2.00 200.00 400.00

Reciving handling and fixing testing and commisioning of C.P.


12 bronze/gun metel standred response standred type sprinkler ……

Upright sprinkler No. 50.00 75.00 3750.00


60.00 50.00 0.00 50.00 3000.00 0.00 3000.00
11.25 50.00 0.00 50.00 562.50 0.00 562.50
3.75 0.00 0.00 0.00 0.00 0.00 0.00
Conciled type pendent sprinkler No. 130.00 75.00 9750.00
60.00 130.00 0.00 130.00 7800.00 0.00 7800.00
11.25 130.00 0.00 130.00 1462.50 0.00 1462.50
3.75 0.00 0.00 0.00 0.00 0.00 0.00
14 MS PIPE DISMENTLING & RE INSTALLATION
Pipe make:-Jindal
a 25 NB (IS: 1239,4.0 mm thick) RM 71.00 70.00 4970.00
Against installation @ 80% 56.00 71.00 0.00 71.00 3976.00 0.00 3976.00
Against Testing@ 15% 10.50 71.00 0.00 71.00 745.50 0.00 745.50
Against commissioning Handing over @ 5% 3.50 0.00 0.00 0.00 0.00 0.00 0.00

b 40 NB (IS: 1239,4.0 mm thick) RM 5.20 85.00 442.00


Against installation @ 80% 68.00 5.20 0.00 5.20 353.60 0.00 353.60
Against Testing@ 15% 12.75 5.20 0.00 5.20 66.30 0.00 66.30
Against commissioning Handing over @ 5% 4.25 0.00 0.00 0.00 0.00 0.00 0.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ5
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount
c 50 NB (IS: 1239,4.0 mm thick) RM 16.50 100.00 1650.00
Against installation @ 80% 80.00 16.50 0.00 16.50 1320.00 0.00 1320.00
Against Testing@ 15% 15.00 16.50 0.00 16.50 247.50 0.00 247.50
Against commissioning Handing over @ 5% 5.00 0.00 0.00 0.00 0.00 0.00 0.00

d 65 NB (IS: 1239,4.0 mm thick) RM 6.00 125.00 750.00


Against installation @ 80% 100.00 6.00 0.00 6.00 600.00 0.00 600.00
Against Testing@ 15% 18.75 6.00 0.00 6.00 112.50 0.00 112.50
Against commissioning Handing over @ 5% 6.25 0.00 0.00 0.00 0.00 0.00 0.00

d 80 NB (IS: 1239,4.0 mm thick) RM 8.00 150.00 1200.00


Against installation @ 80% 120.00 8.00 0.00 8.00 960.00 0.00 960.00
Against Testing@ 15% 22.50 8.00 0.00 8.00 180.00 0.00 180.00
Against commissioning Handing over @ 5% 7.50 0.00 0.00 0.00 0.00 0.00 0.00

Total Service Amount 143992.00 131016.40 0.00 131016.40

IN: Central GST @ 9% 11791.48 0.00 11791.48


IN: State GST @ 9% 11791.48 0.00 11791.48

Total 154599.35 0.00 154599.35


Less paid against material ad hoc 0.00 0.00 0.00
This bill amount 0.00 0.00 154599.35

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ6
Client:-Infra 13 Pvt.Ltd.
Project:- Wave Mega city centre Sector-32 Noida (U.P)
Contractor :-DD MEP ENGINEERS
WO No.:- W.O.:IN13/WO/WCC/18-19/293
Scope : Plumbing and Fire Fighting Work 2B Club
Material installation - RA-2
PARCEL 2B Club (PLUMBING & FIRE FIGHTING SERVICES)

As per work order QUANTITY AMOUNT


Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount

Receiving & Fixing OF SANITARY FIXTURES, ACCESSORIES AND BATHROOM FITTINGS


The work involves Receiving &Fixing and testing in position of all items
including threading the pipes, cutting and making good the walls and
floors where required, painting of any exposed part where ever
required, supply andReceiving &Fixing of minor accessories such as C
P screws, nuts, washers, wooden cleats, rawl plugs etc to complete the
work.

1 Receiving &Fixing of vitreous china European W.C. pan P/S trap, wall
hung type with plastic seat and lid with C.P. brass hinges & rubber
buffers, L bracket/chair with all fittings and brackets complete. (suitable
for concealed type flushing cistern)
Nos 5 1000.00 5,000.00

Against installation @ 80% 800.00 0.00 5.00 5.00 0.00 4000.00 4000.00

Against Testing@ 15% 150.00 0.00 5.00 5.00 0.00 750.00 750.00

Against commissioning Handing over @ 5% 50.00 0.00 0.00 0.00 0.00 0.00 0.00

2 Receiving &Fixing of concealed type flushing cistern with Plate


complete in all respects. Nos 5 224.00 1,120.00

Against installation @ 80% 179.20 0.00 5.00 5.00 0.00 896.00 896.00

Against Testing@ 15% 33.60 0.00 5.00 5.00 0.00 168.00 168.00

Against commissioning Handing over @ 5% 11.20 0.00 0.00 0.00 0.00 0.00 0.00

3 Receiving &Fixing of viterous china under / above counter Wash Basin


of any size with CI/MS brackets C P waste complete
Nos 5 1343.00 6,715.00

Against installation @ 80% 1074.40 0.00 5.00 5.00 0.00 5372.00 5372.00

Against Testing@ 15% 201.45 0.00 5.00 5.00 0.00 1007.25 1007.25

Against commissioning Handing over @ 5% 67.15 0.00 0.00 0.00 0.00 0.00 0.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ3
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount
4 Receiving &Fixing of single or double bowl Stainless steel sink of any
size with or without drain board with CI/MS brackets, waste jali
complete Nos 1 500.00 500.00

Against installation @ 80% 400.00 0.00 1.00 1.00 0.00 400.00 400.00

Against Testing@ 15% 75.00 0.00 1.00 1.00 0.00 75.00 75.00

Against commissioning Handing over @ 5% 25.00 0.00 0.00 0.00 0.00 0.00 0.00

5 Fixing white vitreous china Integrated half stall Urinal size 590 mm x
400 mm x 380 mm with C.P. brass waste and C.P.brass bottle trap,
brackets, integrated battery operated sensor type flushing valve
(Parryware C8098 or equivalent) Nos 3 616.00 1,848.00

Against installation @ 80% 492.80 0.00 3.00 3.00 0.00 1478.40 1478.40

Against Testing@ 15% 92.40 0.00 3.00 3.00 0.00 277.20 277.20

Against commissioning Handing over @ 5% 30.80 0.00 0.00 0.00 0.00 0.00 0.00

6 Receiving &Fixing of white vitreous china urinal partition for half stall
urinals. (Parryware C0571 or equivalent) NOS. 2 503.00 1,006.00

Against installation @ 80% 402.40 0.00 2.00 2.00 0.00 804.80 804.80

Against Testing@ 15% 75.45 0.00 2.00 2.00 0.00 150.90 150.90

Against commissioning Handing over @ 5% 25.15 0.00 0.00 0.00 0.00 0.00 0.00

7 Receiving &Fixing of CP brass short / long body bib cock Nos. 3 100.00 300.00

Against installation @ 80% 80.00 0.00 3.00 3.00 0.00 240.00 240.00

Against Testing@ 15% 15.00 0.00 3.00 3.00 0.00 45.00 45.00

Against commissioning Handing over @ 5% 5.00 0.00 0.00 0.00 0.00 0.00 0.00

8 Receiving &Fixing of CP brass angle valve Nos. 12 100.00 1,200.00

Against installation @ 80% 80.00 0.00 12.00 12.00 0.00 960.00 960.00

Against Testing@ 15% 15.00 0.00 12.00 12.00 0.00 180.00 180.00

Against commissioning Handing over @ 5% 5.00 0.00 0.00 0.00 0.00 0.00 0.00

Receiving &Fixing of C.P. brass over head/hand shower with shower


9 Nos 5 280.00
arm 1,400.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ4
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount

Against installation @ 80% 224.00 0.00 5.00 5.00 0.00 1120.00 1120.00

Against Testing@ 15% 42.00 0.00 5.00 5.00 0.00 210.00 210.00

Against commissioning Handing over @ 5% 14.00 0.00 0.00 0.00 0.00 0.00 0.00

10 Receiving &Fixing of C.P. Brass health faucet with bracket. Nos 5 402.00 2,010.00

Against installation @ 80% 321.60 0.00 5.00 5.00 0.00 1608.00 1608.00

Against Testing@ 15% 60.30 0.00 5.00 5.00 0.00 301.50 301.50

Against commissioning Handing over @ 5% 20.10 0.00 0.00 0.00 0.00 0.00 0.00

Receiving &Fixing of CP brass wall mixture with / without provision for


11 Nos. 5 400.00
telephonic shower 2,000.00

Against installation @ 80% 320.00 0.00 5.00 5.00 0.00 1600.00 1600.00

Against Testing@ 15% 60.00 0.00 5.00 5.00 0.00 300.00 300.00

Against commissioning Handing over @ 5% 20.00 0.00 0.00 0.00 0.00 0.00 0.00

Receiving &Fixing of CP brass single hole / single lever wash basin


12 Nos. 5 350.00
mixture 1,750.00

Against installation @ 80% 280.00 0.00 5.00 5.00 0.00 1400.00 1400.00

Against Testing@ 15% 52.50 0.00 5.00 5.00 0.00 262.50 262.50

Against commissioning Handing over @ 5% 17.50 0.00 0.00 0.00 0.00 0.00 0.00

13 Receiving &Fixing of C.P. brass Single Lever Mixture / Divertor Nos 5 600.00 3,000.00

Against installation @ 80% 480.00 0.00 5.00 5.00 0.00 2400.00 2400.00

Against Testing@ 15% 90.00 0.00 5.00 5.00 0.00 450.00 450.00

Against commissioning Handing over @ 5% 30.00 0.00 0.00 0.00 0.00 0.00 0.00

14 Receiving &Fixing of CP brass table mounted sink mixture Nos. 1 300.00 300.00

Against installation @ 80% 240.00 0.00 1.00 1.00 0.00 240.00 240.00

Against Testing@ 15% 45.00 0.00 1.00 1.00 0.00 45.00 45.00

Against commissioning Handing over @ 5% 15.00 0.00 0.00 0.00 0.00 0.00 0.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ5
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount

Receiving &Fixing of C.P. / PVC 32 / 40 mm dia Bottle trap for wash


15 Nos 6 300.00
basin / sink. 1,800.00

Against installation @ 80% 240.00 0.00 6.00 6.00 0.00 1440.00 1440.00

Against Testing@ 15% 45.00 0.00 6.00 6.00 0.00 270.00 270.00

Against commissioning Handing over @ 5% 15.00 0.00 0.00 0.00 0.00 0.00 0.00

16 Receiving &Fixing of C. P. brass towel rack. Nos 5 200.00 1,000.00

Against installation @ 80% 160.00 0.00 5.00 5.00 0.00 800.00 800.00

Against Testing@ 15% 30.00 0.00 5.00 5.00 0.00 150.00 150.00

Against commissioning Handing over @ 5% 10.00 0.00 0.00 0.00 0.00 0.00 0.00

17 Receiving &Fixing of C. P. brass towel ring Nos 5 200.00 1,000.00

Against installation @ 80% 160.00 0.00 5.00 5.00 0.00 800.00 800.00

Against Testing@ 15% 30.00 0.00 5.00 5.00 0.00 150.00 150.00

Against commissioning Handing over @ 5% 10.00 0.00 0.00 0.00 0.00 0.00 0.00

18 Receiving &Fixing of recess china toilet paper holder Nos 4 100.00 400.00

Against installation @ 80% 80.00 0.00 4.00 4.00 0.00 320.00 320.00

Against Testing@ 15% 15.00 0.00 4.00 4.00 0.00 60.00 60.00

Against commissioning Handing over @ 5% 5.00 0.00 0.00 0.00 0.00 0.00 0.00

19 Receiving &Fixing of C P corner soap tray Nos 5 100.00 500.00

Against installation @ 80% 80.00 0.00 5.00 5.00 0.00 400.00 400.00

Against Testing@ 15% 15.00 0.00 5.00 5.00 0.00 75.00 75.00

Against commissioning Handing over @ 5% 5.00 0.00 0.00 0.00 0.00 0.00 0.00

20 Receiving &Fixing of SS Grating of approved brand in toilet. Nos. 14 120.00 1,680.00

Against installation @ 80% 96.00 0.00 14.00 14.00 0.00 1344.00 1344.00

Against Testing@ 15% 18.00 0.00 14.00 14.00 0.00 252.00 252.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ6
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount

Against commissioning Handing over @ 5% 6.00 0.00 0.00 0.00 0.00 0.00 0.00

Water supply pipe and fittings

Fixing, Joiting and testing in position CTS-SDR 11, Class-1


CPVC Pipes(pressure rating 28 kg/cm2 at 23*C and
7kg/cm2 at 82*C) confirming to IS: 15778-2007, ASTM D-
2846, UV resistant, suitable for cold and hot water supply in
21
concealed……………………..including jointing the pipe and
fittings by solvent cement as per ASTM F 493 and by teflon
tape on threaded ends and properly clamped.(The price
excludes cutting chases and making good the walls)

Pipe make:-Jindal
15mm Nominal Size/15.90mm OD/12.44mm ID (Min. Wall
RM 105.00 30.00 3150.00
Thickness 1.70mm)
Against installation @ 80% 24.00 105.00 0.00 105.00 2520.00 0.00 2520.00

Against Testing@ 15% 4.50 105.00 0.00 105.00 472.50 0.00 472.50

Against commissioning Handing over @ 5% 1.50 0.00 0.00 0.00 0.00 0.00 0.00

20mm Nominal Size/22.20mm OD/18.14mm ID (Min. Wall


RM 41.00 40.00 1640.00
Thickness 2.00mm)
Against installation @ 80% 32.00 41.00 0.00 41.00 1312.00 0.00 1312.00

Against Testing@ 15% 6.00 41.00 0.00 41.00 246.00 0.00 246.00

Against commissioning Handing over @ 5% 2.00 0.00 0.00 0.00 0.00 0.00 0.00
25mm Nominal Size/28.60mm OD/23.42mm ID (Min. Wall
RM 44.00 45.00 1980.00
Thickness 2.59mm)
Against installation @ 80% 36.00 44.00 0.00 44.00 1584.00 0.00 1584.00

Against Testing@ 15% 6.75 44.00 0.00 44.00 297.00 0.00 297.00

Against commissioning Handing over @ 5% 2.25 0.00 0.00 0.00 0.00 0.00 0.00
32mm Nominal Size/28.60mm OD/23.42mm ID (Min. Wall
RM 17.00 50.00 850.00
Thickness 2.59mm)
Against installation @ 80% 40.00 17.00 0.00 17.00 680.00 0.00 680.00

Against Testing@ 15% 7.50 17.00 0.00 17.00 127.50 0.00 127.50

Against commissioning Handing over @ 5% 2.50 17.00 0.00 17.00 42.50 0.00 42.50
Fixing of hand lever operated UPVC Sch 80) Ball Valve type
22 isolating valve including solvent welded joint as
required(Ajai/Astral/Supreme)

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ7
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount

15mm Nominal bore No. 0.00 50.00 0.00

Against installation @ 80% 40.00 0.00 0.00 0.00 0.00 0.00 0.00

Against Testing@ 15% 7.50 0.00 0.00 0.00 0.00 0.00 0.00

Against commissioning Handing over @ 5% 2.50 0.00 0.00 0.00 0.00 0.00 0.00

20mm Nominal bore No. 1.00 65.00 65.00

Against installation @ 80% 52.00 0.00 0.00 0.00 0.00 0.00 0.00

Against Testing@ 15% 9.75 0.00 0.00 0.00 0.00 0.00 0.00

Against commissioning Handing over @ 5% 3.25 0.00 0.00 0.00 0.00 0.00 0.00

25mm Nominal bore No. 2.00 70.00 140.00

Against installation @ 80% 56.00 0.00 0.00 0.00 0.00 0.00 0.00

Against Testing@ 15% 10.50 0.00 0.00 0.00 0.00 0.00 0.00

Against commissioning Handing over @ 5% 3.50 0.00 0.00 0.00 0.00 0.00 0.00

32mm Nominal bore No. 2.00 80.00 160.00

Against installation @ 80% 64.00 2.00 0.00 2.00 128.00 0.00 128.00

Against Testing@ 15% 12.00 2.00 0.00 2.00 24.00 0.00 24.00

Against commissioning Handing over @ 5% 4.00 0.00 0.00 0.00 0.00 0.00 0.00

40mm Nominal bore No. 1.00 100.00 100.00

Against installation @ 80% 80.00 0.00 0.00 0.00 0.00 0.00 0.00

Against Testing@ 15% 15.00 0.00 0.00 0.00 0.00 0.00 0.00

Against commissioning Handing over @ 5% 5.00 0.00 0.00 0.00 0.00 0.00 0.00
Fixing forged brass pressure reducing valve (PN-20) wirh SS seal,
metallic brass diaphram system suitable for controlling outlet
23 pressure of water having inlet range of maximum 20 kg/cm2 and
other range of 0.5-6 kg/cm2, complete with screwed ends as
required. (make: Leader / Audco / Advance / AIP)
25 nn niminal bore No. 2.00 150.00 300.00

32 nn niminal bore No. 2.00 200.00 400.00

Cutting Chases in brick work fo CPVC/UPVC/G.I. water


24 pipes and then making good the same by cement mortar 1
cement:4 coarse sand

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ8
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount

15mm Nominal bore Mtr. 90.00 15.00 1350.00

Against installation @ 80% 12.00 90.00 0.00 90.00 1080.00 0.00 1080.00

Against Testing@ 15% 2.25 90.00 0.00 90.00 202.50 0.00 202.50

Against commissioning Handing over @ 5% 0.75 90.00 0.00 90.00 67.50 0.00 67.50

20mm Nominal bore

Fixing, jointing and testing in position of ISI marked UPVC


pipes for rain water disposal………………….inside
25 duct/suspectedfrom floor under false ceiling(Make
supreme/astral/ashirwad)(Pipe
support:intellotech/Easyflex/Chilly)

200mm dia(Wall thickness-3.7 to 4.3mm)-(Pipes as per IS


4985, 6kg/Sq cm rating suitable cement joints with Mtr. 12.00 300.00 3600.00
necessary fitting

Against installation @ 80% 240.00 12.00 0.00 12.00 2880.00 0.00 2880.00

Against Testing@ 15% 45.00 12.00 0.00 12.00 540.00 0.00 540.00

Against commissioning Handing over @ 5% 15.00 0.00 0.00 0.00 0.00 0.00 0.00
160mm dia(Wall thickness-3.7 to 4.3mm)-(Pipes as per IS
4985, 6kg/Sq cm rating suitable cement joints with Mtr. 4.00 250.00 1000.00
necessary fitting
Against installation @ 80% 200.00 4.00 0.00 4.00 800.00 0.00 800.00

Against Testing@ 15% 37.50 4.00 0.00 4.00 150.00 0.00 150.00

Against commissioning Handing over @ 5% 12.50 0.00 0.00 0.00 0.00 0.00 0.00
110mm dia(Wall thickness-3.7 to 4.3mm)-(Pipes as per IS
4985, 6kg/Sq cm rating suitable cement joints with Mtr. 36.00 150.00 5400.00
necessary fitting
Against installation @ 80% 120.00 36.00 0.00 36.00 4320.00 0.00 4320.00

Against Testing@ 15% 22.50 36.00 0.00 36.00 810.00 0.00 810.00

Against commissioning Handing over @ 5% 7.50 0.00 0.00 0.00 0.00 0.00 0.00
63mm dia(Wall thickness-2.2 to 2.7mm)-(Pipes as per IS 4985,
6kg/Sq cm rating suitable cement joints with necessary Mtr. 5.00 75.00 375.00
fitting(For Corridor waste)
Against installation @ 80% 60.00 5.00 0.00 5.00 300.00 0.00 300.00

Against Testing@ 15% 11.25 5.00 0.00 5.00 56.25 0.00 56.25

Against commissioning Handing over @ 5% 3.75 0.00 0.00 0.00 0.00 0.00 0.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ9
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount
32mm dia(Wall thickness-2.2 to 2.7mm)-(Pipes as per IS 4985,
6kg/Sq cm rating suitable cement joints with necessary Mtr. 12.00 30.00 360.00
fitting(For Corridor waste)
Against installation @ 80% 24.00 12.00 0.00 12.00 288.00 0.00 288.00

Against Testing@ 15% 4.50 12.00 0.00 12.00 54.00 0.00 54.00

Against commissioning Handing over @ 5% 1.50 0.00 0.00 0.00 0.00 0.00 0.00

Fixing, jointing and testing in position of HDPE Pipe for


Dranage waste disposal including all necessary
specials…………………………Receiving & fixing at
26 wall/ceiling/floor/level supported by clamo & hangers etc.
inside duct/suspectedfrom floor under false ceiling(Make
supreme/astral/ashirwad)(Pipe
support:intellotech/Easyflex/Chilly)

Geberit HDPE straight Line Pipe Dia 160mm Mtr. 25.00 503.00 12575.00

Against installation @ 80% 402.40 25.00 0.00 25.00 10060.00 0.00 10060.00

Against Testing@ 15% 75.45 25.00 0.00 25.00 1886.25 0.00 1886.25

Against commissioning Handing over @ 5% 25.15 0.00 0.00 0.00 0.00 0.00 0.00

Geberit HDPE straight Line Pipe Dia 110mm Mtr. 98.00 363.00 35574.00

Against installation @ 80% 290.40 98.00 0.00 98.00 28459.20 0.00 28459.20

Against Testing@ 15% 54.45 98.00 0.00 98.00 5336.10 0.00 5336.10

Against commissioning Handing over @ 5% 18.15 0.00 0.00 0.00 0.00 0.00 0.00

Geberit HDPE straight Line Pipe Dia 75mm Mtr. 15.00 307.00 4605.00

Against installation @ 80% 245.60 15.00 0.00 15.00 3684.00 0.00 3684.00

Against Testing@ 15% 46.05 15.00 0.00 15.00 690.75 0.00 690.75

Against commissioning Handing over @ 5% 15.35 0.00 0.00 0.00 0.00 0.00 0.00

Geberit HDPE straight Line Pipe Dia 56mm Mtr. 25.00 257.00 6425.00

Against installation @ 80% 205.60 25.00 0.00 25.00 5140.00 0.00 5140.00

Against Testing@ 15% 38.55 25.00 0.00 25.00 963.75 0.00 963.75

Against commissioning Handing over @ 5% 12.85 0.00 0.00 0.00 0.00 0.00 0.00

Geberit HDPE straight Line Pipe Dia 50mm Mtr. 10.00 229.00 2290.00

Against installation @ 80% 183.20 10.00 0.00 10.00 1832.00 0.00 1832.00

DD MEP ENGINEERS
PLUMBING AND FIRE FIGHTING
PAGE : SQ10
As per work order QUANTITY AMOUNT
Sr. No. Item Description Unit Part Rate
Previous This Bill Cummulative Previous Bill Cummulative
Quantity Rate Amount This Bill Amount
Qty Qty Qty Amount Amount

Against Testing@ 15% 34.35 10.00 0.00 10.00 343.50 0.00 343.50

Against commissioning Handing over @ 5% 11.45 0.00 0.00 0.00 0.00 0.00 0.00

Multi Trap Mtr. 17.00 448.00 7616.00

Against installation @ 80% 358.40 17.00 0.00 17.00 6092.80 0.00 6092.80

Against Testing@ 15% 67.20 17.00 0.00 17.00 1142.40 0.00 1142.40

Against commissioning Handing over @ 5% 22.40 0.00 0.00 0.00 0.00 0.00 0.00

HDPE Clean out plug Mtr. 3.00 783.00 2349.00

Against installation @ 80% 626.40 3.00 0.00 3.00 1879.20 0.00 1879.20

Against Testing@ 15% 117.45 3.00 0.00 3.00 352.35 0.00 352.35

Against commissioning Handing over @ 5% 39.15 0.00 0.00 0.00 0.00 0.00 0.00

Total Service Amount 126833 86844 32803 119647

IN: Central GST @ 9% 7816 2952 10768


IN: State GST @ 9% 7816 2952 10768

Total 102476 38707 141183


Less paid against material ad hoc 0 0 0
This bill amount 102476 38707 141183