Andaya Cortez: NO. Description Unit Qty. Unit Cost Amount
Andaya Cortez: NO. Description Unit Qty. Unit Cost Amount
Andaya Cortez: NO. Description Unit Qty. Unit Cost Amount
Page 1 of 6
Project: SINGLE STOREY RESIDENCE Location: SAN JUAN BATANGAS, PHILIPPINES
Owner: MRS.MYRNA ANDAYA CORTEZ
Andaya Cortez
2"Ø P.V.C. Pipe Pcs. 4 270.00 1,008.00
P.V.C. Solvent Liter 1 170.00 170.00
Septic tank L.S. 15,000.00
Sub-Total 18,500.00
WATER LINE
1/2"Ø P.V.C. Blue Pipe Pcs. 3 400.00 1,200.00
1/2"Ø Elbow 90 Degree Pcs. 9 70.00 630.00
1/2" x 2" Double Tee Pcs. 4 80.00 320.00
Coupling Pcs. 1 25.00 25.00
Teplen tape Pcs. 10 6.00 60.00
Gate valve Pcs. 2 915.00 1,800.00
Koyo check valve 1" Pcs. 1 750.00 750.00
pipe cutters Pcs. 1 220.00 220.00
Sub-Total 5,000.00
V. PLUMBING FIXTURES AND ACCESSORIES
Water Closet w/ Accessories (Phil. Standard) Set 2 3,000.00 6,000.00
Lavatories w/ Accessories Set 2 1,200.00 2,400.00
Shower Valve Pcs. 2 350.00 700.00
Shower Head Pcs. 2 350.00 700.00
Faucet (Wall Type) Pcs. 2 300.00 600.00
Soap Holder (Porcelain) Pcs. 2 300.00 600.00
Tissue Holder (Porcelain) Pcs. 2 250.00 500.00
Towel Bar (Stainless) Pcs. 2 250.00 500.00
Floor Drain (4" x 4") Pcs. 2 500.00 1,000.00
Hose Bibb Faucet Pcs. 2 100.00 200.00
Pcs. 2 200.00 400.00
Sub-Total 19,000.00
VI. CEILING, FLOORS AND OTHER INTERIOR WORKS
1). Ceiling
Single furring channel (0.80mm) Pcs. 80 130.00 10,400.00
3.5mm Hardiflex Pcs. 50 300.00 15,000.00
Double furring channel (0.80mm) Pcs. 4 170.00 6,800.00
Wall angle Pcs. 55 70.00 3,850.00
Carrying channel Pcs. 20 200.00 4,000.00
Blind rivets (5/32x5/8") Pcs. 500 1.00 500.00
Metal w-clif Pcs. 180 10.00 1,800.00
#16 G.I tie wire Kegs 12 80.00 960.00
Sanding paper # 100 L.F. 12 40.00 480.00
3). Wood Mouldings (Mat Wood)
Wood Cornice 3"x10' Pcs. 12 200.00 2,400.00
Wood Stain (Mahogany/Equivalent) Bottle 2 90.00 180.00
4). Door Jambs
2"x5"x10' Apitong/Tanguile, KD---1 Pcs. Bd. Ft. 18 70.00 1,260.00
2"x5"x8' Apitong/Tanguile, KD---2 Pcs. Bd. Ft. 36 70.00 2,250.00
Sub-Total 50,000.00
FINISHING WORK/ TILE WORKS
1). Room 1, 2 (AREA = 7.60 sq. m.)
Ceramic Floor Tiles (400mm x 400mm) Pcs. 38 65.00 2,470.00
Tile Grout Kilos 2 50.00 100.00
Cement (Portland) Bags 2 200.00 400.00
3). Comfort Rooms (AREA = 2.10 sq. m.)
Page 2 of 6
Project: SINGLE STOREY RESIDENCE Location: SAN JUAN BATANGAS, PHILIPPINES
Owner: MRS.MYRNA ANDAYA CORTEZ
Andaya Cortez
Ceramic Floor Tiles (200mm x 200mm) Pcs. 20 15.00 300.00
Tile Grout Kilos 1 50.00 50.00
Cement (Portland) Bags 1 200.00 200.00
6). Living Area (AREA = 15.20 sq. m.)
Ceramic Floor Tiles (400mm x 400mm) Pcs. 38 50.00 1,900.00
Tile Grout Kilos 2 100.00 200.00
Cement (Portland) Bags 1 200.00 200.00
7).Veranda (AREA = 7.00 sq. m.)
Ceramic Floor Tiles (400mm x 400mm) Pcs. 17 50.00 875.00
Tile Grout Kilos 2 50.00 100.00
Cement (Portland) Bags 1 200.00 200.00
Sub-Total 7,000.00
VII. ELECTRICAL MATERIALS
Panel boards:
24 Holes Set 1 4,500.00 4,500.00
Main breaker
175AT, 240V, 2P Set 1 3,000.00 3,000.00
TW Wire #14 (Stranded) LM. 60 10.00 600.00
TW Wire #12 (Stranded) LM. 40 15.00 600.00
TW Wire #4 (Stranded) LM. 30 70.00 2,100.00
One Gang Switch w/ Cover Set 2 36.00 72.00
Two Gang Switch Set 2 54.00 108.00
Three Gang Switch Set 1 75.00 75.00
Utility Box (Neltex) Pcs. 14 30.00 420.00
Junction Box (Neltex) Pcs. 10 30.00 300.00
Two Gang conv. Outlet Pcs. 7 210.00 1,470.00
Water heater Outlets Set 2 280.00 560.00
Weatherproof Outlets Set 2 275.00 550.00
ACU outlet Set 2 135.00 270.00
Sub-Total 15,000.00
Page 3 of 6
Project: SINGLE STOREY RESIDENCE Location: SAN JUAN BATANGAS, PHILIPPINES
Owner: MRS.MYRNA ANDAYA CORTEZ
Andaya Cortez
VIII. DOORS, WINDOWS AND ACCESSIRIESS
(D-1)- 800 x 2100mm Aluminum Panel Clear Glass Door Set 1 5,000.00 5,000.00
(D-2)- 800 x 2100mm Panel Door(Tanguile) Set 2 5,000.00 10,000.00
(D-3)- 700 x 2100mm PVC Door w/ door Jamb Set 2 1,900.00 3,800.00
(W-1)-3800 x 1200mm Wood Casement Wdo. Set 1 1,800.00 1,800.00
Frame (Glass1/8" Thk.)
(W-2)-1400 x 1200mm Wooden louvres Wdo. Set 4 530.00 2,120.00
Wood. Frame (Glass1/8" Thk.)
(W-3)-600 x 600mm Alumi. Awning Wdo. Set 2 3,100.00 6,200.00
Alum. Frame (Glass1/8" Thk.) 30,000.00
Sub-Total 58,920.00
X. MISCELLANEOUS MATERIALS
Excluding Closets & Over-Hang Cabinets 20,000.00
Page 4 of 6
Project: SINGLE STOREY RESIDENCE Location: SAN JUAN BATANGAS, PHILIPPINES
Owner: MRS.MYRNA ANDAYA CORTEZ
Andaya Cortez
ITEM III. TOTAL CONSTRUCTION COST ( ITEM I. and ITEM II) P 1,518,311.872
The above items comprise the estimated expenses for material and labor applied.
Directly in the construction of the building. If the work would be undertaken by a contractor,
the indirect cost shown below should also be taken into
account in projecting the total funding required for the completion of the project.
_________________________ ___________________________
DATE DATE
Page 5 of 6