Hampton Bid Form
Hampton Bid Form
Hampton Bid Form
Owner :
Location :
Subject :
Date :
I. GENERAL REQUIREMENTS
1 Mobilization and Demolition 1 lot 100,000.00 ### 100,000.00 100,000.00
2 Insurance Coverage, Bonds - -
and other related expenses 1.00 lot 200,000.00 200,000.00 200,000.00
3 Permits, certificate & other related - -
permits. 1 lot 1,000,000.00 1,000,000.00 1,000,000.00
a. Legwork for temporary and - -
permanent power application - -
b. Legwork for temporary and - -
permanent telephone application - -
c. Including all plans and preparation - -
for MERALCO & PLDT - -
3 Testing of Materials 1 lot 100,000.00 100,000.00 100,000.00
4 As-Built Plans & shop drawings 1.00 lot 50,000.00 50,000.00 50,000.00
5 Water Supply 1 lot 100,000.00 100,000.00 100,000.00
6 Site Fencing and other temporary - -
facilities 1 lot 150,000.00 150,000.00 150,000.00
7 Others (Please specify if any) - -
- 1,700,000.00
II. CIVIL WORKS
A. SITEWORKS -
1 Demolition Work Excavation cu. m - -
2 Site Clearing & Layout 676.48 cu. m 50.00 50.00 33,824.00
Excavation - -
a. Bulk 1,338.97 cu. m 450.00 450.00 602,536.50
b. Manual 21.00 cu. m 450.00 450.00 9,450.00
c. Disposal 239.97 cu. m 450.00 450.00 107,986.50
d. Trimming (Floor only) 407.10 cu. m 140.00 140.00 56,994.00
3 Backfill & Compaction 1,120.00 cu. m 150.00 150.00 168,000.00
4 Gravel Bedding cu. m 100.00 100.00 -
5 Soil Poisoning 676.48 sq. m 20.00 20.00 13,529.60
6 Damproofing 676.48 sq. m - -
7 Paving and Surfacing 676.48 sq. m 120.00 120.00 81,177.60
8 Other (Please specify if any) - -
- -
B. CONCRETE WORKS - -
B-1 Wall Footing - -
1 Concrete 3000 psi 25.88 cu. m 4,900.00 750.00 5,650.00 146,222.00
2 Reinforcing Bars - -
Structural Grade kgs 41.50 15.00 56.50 -
- -
B-2 Footing Tie Beam - -
1 Concrete 3000 psi 24.88 cu. m 4,900.00 750.00 5,650.00 140,572.00
2 Reinforcing Bars - -
Intermediate Grade 1,106.00 kgs 40.50 15.00 55.50 61,383.00
Structural Grade 3,051.00 kgs 41.50 15.00 56.50 172,381.50
- -
B-3 Footing - -
1 Concrete 3000 psi 374.65 cu. m 4,900.00 750.00 5,650.00 2,116,772.50
2 Reinforcing Bars - -
Intermediate Grade kgs 40.50 15.00 55.50 -
Structural Grade 13,450 kgs 41.50 15.00 56.50 759,925.00
- -
B-4 Slab on Fill - -
1 Concrete 2500 psi 84.56 cu. m 4,900.00 750.00 5,650.00 477,764.00
2 Reinforcing Bars - -
Intermediate Grade 6,342.00 kgs 40.50 15.00 55.50 351,981.00
- -
B-5 Beams & Girders - -
1 Structural Steel Works 12142.34 kgs 41.50 15.00 56.50 686,042.21
- -
B-6 Suspended Slab (w/ Metal Decking) - -
1 Concrete 3000 psi 41.20 cu. m 4,900.00 750.00 5,650.00 232,780.00
2 Reinforcing Bars - -
Structural Grade 105,297 kgs 41.50 15.00 56.50 5,949,280.50
3 Metal Decking & Scaffoldings/FORMS 834.00 sq. m 1,403.70 250.00 1,653.70 1,379,185.80
- -
B-7 Stairs - -
1 Structural Works 1 lot 301,812.40 301,812.40 301,812.40
- -
B-8 Parapet Wall & Countertop - -
1 Concrete 3000 psi 17.28 cu. m 4,900.00 750.00 5,650.00 97,632.00
2 Reinforcing Bars - -
Structural Grade kgs 41.50 15.00 56.50 -
3 Formworks & Scaffolding 1,346.84 sq. m 1,403.70 250.00 1,653.70 2,227,269.31
- -
B-9 Septic Tank, Cistern & Water Storage - -
1 Concrete 3000 psi 37.40 cu. m 4,900.00 750.00 5,650.00 211,310.00
2 Reinforcing Bars - -
Intermediate Grade 3,586.02 kgs 40.50 15.00 55.50 199,024.11
Structural Grade 507.96 kgs 41.50 15.00 56.50 28,699.74
3 Formworks & Scaffolding 244.39 sq m 1,403.70 250.00 1,653.70 404,147.74
Water Pumps & Boosters pcs - -
4 Others (Please specify if any) - -
- -
B-11 Miscellaneous - -
1 Structural Works kgs - -
- -
COLUMN - -
Concrete 3000 psi 35 cu. m 4,900.00 750.00 5,650.00 197,750.00
Reinforcing Bars - -
Intermediate Grade 2850 kgs 40.50 15.00 55.50 158,175.00
Structural Grade 7,518 kgs 41.50 15.00 56.50 424,767.00
Forms works 350.00 sq.m 1,403.70 250.00 1,653.70 578,795.00
- -
SHEAR WALL - -
Concrete 3000 psi 17.28 cu. m 4,900.00 750.00 5,650.00 97,632.00
Reinforcing Bars - -
Intermediate Grade 913.51 kgs 40.50 15.00 55.50 50,699.81
Structural Grade 2,294.00 kgs 41.50 15.00 56.50 129,611.00
Forms works 115.24 sq.m 1,403.70 250.00 1,653.70 190,572.39
20,545,685.20
III. ARCHITECTURAL WORKS
A. MASONRY
1 Rebars kgs
1.1 100mm CHB
No. of CHB pcs
Cement bags
Sand cu m
C. FLOOR FINISHES
1 Verify Plan sq m
2 Verify Plan sq m
3 Verify Plan sq m
4 Verify Plan pcs
5 Verify Plan pcs
6 Verify Plan pcs
D. WALL FINISHES
1 Plain Cement Plaster cu m
1.1 Cement bags
1.2 Sand cu m
1.3 Cement Finish Coat cu m
1.4 Textured Finish sq m
1.5 Wall Tiles – verify plan pcs
1.6 Wall Tiles – verify plan pcs
1.7 Wall Tiles – verify plan pcs
2 Painting
2.1 Semi-gloss Latex Finish sq m
2.2 Semi-gloss Enamel Finish sq m
2.3 Textured Painted Finish sq m
2.4 Elastomeric Paint Finish sq m
2 Doors
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
Enter Door schedule pcs
F. CARPENTRY WORKS
1 Door Jambs
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
Enter Door schedule lm
G. PLYWOOD
1 10mm thk. Gypsum Board
on metal furrings & hangers sq m
2 6mm Fiber Cement Board
on metal furrings & hangers sq m
3 10mm thk. Acoustic Brds.
on metal runners & hangers sq m
4 Others, please specify
H. HARDWARES pcs
1 Locksets pcs
2 Hinges pcs
3 Door Stoppers pcs
4 Slide Flush Bolt pcs
5 Door Closers
6 Miscellaneous Hardware
7 Others, please specify
J. METAL WORKS
Built-up Steel grilles
K. COUNTERTOPS
1 20mm thk. Granite Slab
on R.C. Counter sq m
L. (Other Architectural Finishes; pls. specify)
Pls. Specify
V. PLUMBING WORKS
A. STORM DRAINAGE
1 Pipe (Perforated)
150 mm dia.
200 mm dia.
250 mm dia.
300 mm dia.
350 mm dia.
400 mm dia.
2 Pipe (PVC)
50 mm dia.
75 mm dia.
100 mm dia.
150 mm dia.
3 Wye
50 mm dia.
75 mm dia.
100 mm dia.
150 mm dia.
75 mm dia. X 50 mm dia.
100 mm dia. X 50 mm dia.
100 mm dia. X 75 mm dia.
150 mm dia. X 100 mm dia.
7 Shower Drain
50 mm dia.
8 Equipment Drain
25 mm dia.
9 Trench Drain
75 mm dia.
10 Deck Drain
75 mm dia.
100 mm dia.
11 Floor Clean-out
50 mm dia.
80 mm dia.
100 mm dia.
150 mm dia.
12 Ceiling Clean-out
50 mm dia.
75 mm dia.
100 mm dia.
150 mm dia.
13 Miscellaneous
14 Consumables
B. SANITARY DRAINAGE
1 Pipe (PVC)
50 mm dia.
75 mm dia.
100 mm dia.
150 mm dia.
2 1/4 Bend Elbow
50 mm dia.
75 mm dia.
100 mm dia.
150 mm dia.
3 Tee
50 mm dia.
75 mm dia.
100 mm dia.
150 mm dia.
80 mm dia. X 50 mm dia.
4 Wye
50 mm dia.
75 mm dia.
100 mm dia.
150 mm dia.
75 mm dia. X 50 mm dia.
100 mm dia. X 50 mm dia.
100 mm dia. X 75 mm dia.
150 mm dia. X 100 mm dia.
5 Trench Drain
75 mm dia.
6 Floor Drain
7 Shower Drain
50 mm dia.
8 Equipment Drain
25 mm dia.
9 Deck Drain
75 mm dia.
100 mm dia.
10 P-Trap
50 mm dia.
12 Ground Clean-out
80 mm dia.
100 mm dia.
150 mm dia.
13 Miscellaneous
14 Consumables
C. VENT SYSTEM
1 Studor Vent System
50 mm dia.
100 mm dia.
150 mm dia.
2 Miscellaneous
3 Consumables
WATER SYSTEM
Pipe (PVC, PE, PB)
15 mm dia.
20 mm dia.
25 mm dia.
32 mm dia.
38 mm dia.
Pipe (G.I.)
15 mm dia.
20 mm dia.
25 mm dia.
32 mm dia.
38 mm dia.
Couplings
15 mm dia.
20 mm dia.
25 mm dia.
32 mm dia.
38 mm dia.
Coupling Reducer
20 mm dia. X 15 mm dia.
25 mm dia. X 15 mm dia.
25 mm dia. X 20 mm dia.
32 mm dia. X 15 mm dia.
32 mm dia. X 20 mm dia.
32 mm dia. X 25 mm dia.
38 mm dia. X 20 mm dia.
38 mm dia. X 25 mm dia.
Union Patente
15 mm dia.
20 mm dia.
25 mm dia.
32 mm dia.
38 mm dia.
Cap
15 mm dia.
20 mm dia.
25 mm dia.
Hose Bibb
15 mm dia.
Gate Valve
15 mm dia.
20 mm dia.
25 mm dia.
32 mm dia.
38 mm dia.
Water Meter
15 mm dia.
20 mm dia.
25 mm dia.
32 mm dia.
38 mm dia.
Miscellaneous
Consumables
EQUIPMENTS
Pumps & Hydropneumatic Tanks
PLUMBING FIXTURES
Lavatory pcs.
Lavatory Faucet pcs.
Urinal pcs.
Water Closet pcs.
Shower Set pcs.
Kitchen Sink pcs.
Kitchen Sink Faucet pcs.
Accessories (please specify) pcs.
Others (please specify if any)
C. LIGHTING SYSTEM
1 Wires & Cables
2 Conduit & fittings
3 Boxes & pull
4 Lighting fixtures
5 Wiring devices (light switch)
6 Miscellaneous
D. TELEPHONE SYSTEM
1 Wires and cables
2 Conduit, fitting & supports
3 Boxes & pullboxes
4 Wiring devices
5 Miscellaneous
H. OTHERS
(please specify if any)
VII. FIRE PROTECTION
Pls. Specify
Pls. Specify
GENERAL WORKS
CIVIL WORKS
ARCHITECTURAL WORKS
FENCE & GATE
PLUMBING WORKS
ELECTRICAL WORKS
FIRE PROTECTION WORKS
MECHANICAL WORKS
TOTAL
Mark up
VAT
Owner furnished - Contractor Installed (OFCI) & Owner supplied Items (OSM)
5,479,463.63
LABOR MATERIAL COST CHB WALL 1 SQ.M
BAR SPACE 0.40 BARS SPACE 0.60M
CEMENT 0.525 CEMENT
SAND 0.04375 SAND
2.0361 KGS
1.80781 KGS
3.84391
TIES
2 LAYER 0.000638 KGS
3 LAYER 0.000475 KGS
BEAM / GIRDER
PLYWOOD 0.42 PCS
FRAME 48 BDFT
SCALFOLDING COL
VERT 7
HOR. 31.67
BRACES 17.5
BEAM
VERT 6
HOR. 7
BRACES
FLOORING 9
BARS SPACE 0.60M
1.013
0.08438
2.15 M
2.13 M
1.32655 KGS
1.31421 KGS
2.64076
0.000425 KGS
0.000312 KGS