Cost Estimate
Cost Estimate
Location :
Owner :
A. Direct Cost:
I. Concrete & Masonry Works P 651,079.20
II. Hardware/Steel Works 51,340.00
III. Electrical Works 42,387.00
IV. Plumbing Works 33,509.00
B. Indirect Cost:
I. Labor (45% of Material Cost) 311,326.08
II. Supervision (5% of Material Cost) 38,915.76
Prepared by:
Approved:
ORLANDO S. YUMUL
Project Owner