The document provides a bill of materials for a proposed two-storey house project for Mr. and Mrs. Arnold Sanguir. It lists various construction materials and their quantities needed to complete the project.

The project is for a proposed two-storey house being built for Mr. and Mrs. Arnold Sanguir. The bill of materials provides details of construction items needed for the general construction works, steel reinforcement works, concrete works, formworks, roofing works, and more.

The bill of materials includes items for earthworks, steel reinforcement, concrete, formworks, roofing, electrical, plumbing, doors and windows, painting, tile works, cabinetry and more. It provides the item, quantity, unit, unit price and total price for each construction component.

PROJECT : PROPOSED TWO STOREY HOUSE

SUBJECT : BILL OF MATERIALS


OWNER : MR. & MRS. QUITILLA

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE/UNIT

GENERAL CONSTRUCTION WORKS

A EARTHWORKS
Site clearing and Excavations 1 lot lot
Ground Levelling and Backfills m m
Layout and Batten board Staking

B STEEL AND REINFORCEMENTS WORKS


Footings & Columns
12 mm. dia. 48 pcs. 175.00 175.00
10 mm. dia. 30 pcs. 115.00 115.00
Beams and Roof Beams
12 mm. dia 48 pcs. 175.00 175.00
10 mm. dia. 30 pcs. 115.00 115.00
Slabs and Dowels
12 mm. dia 30 pcs. 175.00 175.00
10 mm. dia. 15 pcs. 115.00 115.00
Tie Wires #16 10 kg. 40.00 40.00

C CONCRETE AND MASONRY WORKS


Cement 701 bags 175.00 175.00
Sand 51 m 500.00 500.00
3/4 Crushed Gravel 54 m 750.00 750.00
4" CHB 2932 pcs. 14.00 14.00

D FORMS AND FORMWORKS


2"x3" Coco Lumbers 31 pcs. 2500 2500
2"x2" Coco Lumbers 33 pcs. 2500 2500
Plywood Forms Panelling 320 320

E ROOFING WORKS
2"x2" Steel Truss Framing (Primer painted)
2"x3" Steel C-Purlins (Primer Painted)
32" x 12' Corrugated G.I. Sheet 42 pcs. 440.00 440.00
32" x 9' Corrugated G.I. Sheet 38 pcs. 440.00 440.00
36" x 8' Plain G.I. Sheet 6 pcs. 440.00 440.00
G.I. Rivets 11 kg.
G.I. Washers 25 kg.
4d(1-) Common Wire Nails 8 kg.
G.I. Roof Gutters (90cm. x 240cm. Plain G.I. Sheet) 5 pcs.
Flashing (90cm. x 240cm. Plain G.I. Sheet) 3 pcs.
Ridge Roll (90cm. x 240cm. Plain G.I. Sheet) 3 pcs.

F. CEILING WORKS
Gypsum Board Ceiling Panels 67 pcs.
Ceiling Joist
Cornice
Gypsum Putty and Tape
G
PLUMBING FIXTURES & INSTALLATION
Faucet 3 pcs. 150.00 150.00
Shower Valve 1 pc. 150.00 150.00
Floor Drain 5 pcs. 75.00 75.00
Shower Drain 1 pc. 75.00 75.00
Kitchen Sink 1 pc. 1,500.00 1,500.00
Water Line (Complete System) 2.4 Is. 8,500.00 8,500.00
Sewerage System 2.4 Is. 900.00 900.00
Storm Drainage System 2.4 Is. 9,000.00 9,000.00
Water Closet 2 pcs. 1,500.00 1,500.00
Lavatory 2 pcs. 1,500.00 1,500.00
PROJECT
SUBJECT : PROPOSED TWO STOREY HOUSE
OWNER : BILL OF MATERIALS
: MR. & MRS. ARNOLD SANGUIR

SCOPE OF WORKS
ITEM
PARTICULARS QTY UNIT UNIT
H.
ELECTRICAL WORKS
Outlet Complete 13 Set s 200.00 200.00
Lighting Outlet 14 Sets 200.00 200.00
Wires and Cables
2.5 mm THWN 7 Roll 750.00 750.00
3.5 mm.THWN 7 Roll 950.00 950.00
Switch 11 200.00 200.00
Circuit Breakers/Panel Board 2 1,500.00 1,500.00
I.
DOORS AND WINDOWS

Main Door - Panel Type Door 2 sets 2000 2000


Kitchen Door- Panel Type Door 1 set 1100 1100
Bedroom Doors - Flush Type Door 2 sets 1100 1100
Toilet Door - PVC Door QDE Paint Finish 2 sets 800 800
Locksets/Doorknob 7 pcs. 150 150
All Windows - Steel Casement with Clear Glass Panels 4 sets 2500 2500
J.
PAINTING WORKS
Exterior and Interior Walls (semi-gloss paint finish) 500.00 500.00
Exterior and Interior Ceilings (flat paint finish) 445.00 445.00
Doors Paint finish (QDE paint finish) 525.00 525.00
Steel Casement Windows (QDE paint finish) 525.00 525.00
K.
TILE WORKS
Toilet Wall and Floors (Ceramic Tile Finish)
10 x 20cm. (4" x 8") Glazed Wall Tiles 77 pcs
20 x 20cm. Unglazed Floor Tiles 91 pcs.
Living, Dining, Bedroom (Vinyl Tile Finish) 640 pcs
Kitchen Counters (Mosaic Tile Finish) 52 pcs.
Entrance Porch (Smooth Plain Cement Finish) 162 pcs.

CABINETRY
Kitchen Hanging Cabinet (paint Finish) 1 set 550.00 550.00
Kitchen Low Cabinet (paint Finish) 1 set 550.00 550.00

BUILDING COST
FINISHING COST
TOTAL AMOUNT
TOTAL AMOUNT

73,100.00
11,100.00
60,000.00
2,000.00

29,275.00

8,400.00
3,450.00

8,400.00
3,450.00

3,450.00
1,725.00
400.00

239,923.00
122,675.00
25,500.00
40,500.00
41,048.00

77,500.00
77,500.00

52,710.00
450.00
150.00
375.00
75.00
1,500.00
20,400.00
2,160.00
21,600.00
3,000.00
3,000.00
TOTAL AMOUNT

22,500.00
2,600.00
2,800.00

5,250.00
6,650.00
2,200.00
3,000.00

19,950.00

4,000.00
1,100.00
2,200.00
1,600.00
1,050.00
10,000.00

550.00
550.00
: PROPOS PROJECT : PROPOS PROJECT
: BILL OF SUBJECT : BILL OF SUBJECT
: MR. & M OWNER : MR. & M OWNER
: PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS
: BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF
: MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M
PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT
SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT
OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER
: PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS
: BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF
: MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M
PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT
SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT
OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER
: PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS
: BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF
: MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M
PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT
SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT
OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER
: PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS
: BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF
: MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M
PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT
SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT
OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER
: PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS
: BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF
: MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M
PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOS PROJECT : PROPOSED TWO STOREY HOUSE
SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF SUBJECT : BILL OF MATERIALS
OWNER : MR. & M OWNER : MR. & M OWNER : MR. & M OWNER : MR. & MRS. ARNOLD SANGUIR
POSED TWO STOREY HOUSE
L OF MATERIALS
& MRS. ARNOLD SANGUIR