Todo Sobre El Bio Dme
Todo Sobre El Bio Dme
Todo Sobre El Bio Dme
Per Salomonsson
EUROPEAN PROJECT
Grant agreement No: TREN/FP7EN/218923
- DME production
- Laboratory support to technology provider
plant operation
DME 4 tons / d
production
capacity:
Pipe ~ 10 000 m
SmurfitKappa installation:
Kraftliner
Pulp Mill Hand valves &
on/off valves: ~ 1400 pieces
Heat ~ 25 pieces
Gasification exchangers:
MDEA
Water
Single-pass Methanol Synthesis
– breaking the equilibrium limitation
Carbonyl-
Synthesis Gas
guard MeOH reactors
MPS LPS
S-guard
Guard- MeOH-cat
reactor Raw MeOH
DME Synthesis & Distillation
MeOH
Water
Wax DME-cat
BioDME Production
390 Tons by end of Project
450
400
E
350 D
Produced BioDME, ton
300
C
250
B
200 A: Authority Inspection
B: Maintenance stop
150
C: Holiday period
100 A D: Maintenance stop
E: Equipment installation
50
0
12/2011
01/2012
02/2012
03/2012
04/2012
05/2012
06/2012
07/2012
08/2012
09/2012
10/2012
11/2012
12/2012
01/2013
European Project BioDME
7th Framework Programme
BioDME Quality Control
• Quality control of BioDME and participating Typical analysis of produced BioDME ISO draft [2]
in DME ISO standardization process C2 ppm wt 15
– Development of analysis methods for C3 ppm wt 160 10000
BioDME from storage tank, from the trailer C4 ppm wt 600
and from filling stations Methanol ppm wt 120 500
– LPG residues observed in filling stations, Water ppm wt 40 300
originating from trailer [1].
CO2 ppm wt 100 1000
[1]. Öhrman, O. et al. Quality control of BioDME produced via DME (by % wt > 99.8 > 98.5
black liquor gasification. 7th Asian DME Conference, Niigata, difference)
Nov. 16-18, 2011.
[2]. Bollon, F. 7th Asian DME Conference, Niigata, Nov 16-18, 2011
34 m3 trailer
Stockholm
Göteborg
Jönköping
Four filling stations
DME deliveries
100000 1000000
90000 BioDME 900000
80000 800000
Fossil
70000 700000
Acc deliveries
60000 600000
liter DME
50000 500000
40000 400000
30000 300000
20000 200000
10000 100000
0 0
Feb
Feb
Dec
Dec
Dec
Apr
Apr
Aug
Aug
Aug
Oct
Oct
Oct
Jun
Jun
Jun
Long haul, Swedish mail Regional and local Regional and local Development truck Long haul, DHL
transportation transportation
Regional and local Long haul, Swedish mail Long haul, DHL Heavy loaded, up to 60 Heavy loaded, up to 60
transportation ton payload ton payload
500000
400000
300000
200000
100000
0
Date
European Project BioDME 7th Framework
Programme
Emission Verification
PEMS – Portable Emission Measurement System
Cycle NOx PM HC CO
(g/kWh) (g/kWh) (g/kWh) (g/kWh)
• Volvo perspective
– Trucks function well in commercial operation
– Low fault rate given the early development stage – exceeds expectation
– DME distribution and handling works well
– Slightly shorter service intervals compared to diesel – to be improved
– Because of inherent properties of DME, it has been possible to reach very far
with a relatively limited development effort
www.biodme.eu
BioDME Video
400000
300000
200000 Extended field test
100000
0
Date