INTRODUCTION:
Water ring Vacuum pump includes pump and 3 phase motor, separator, heat exchanger, chassis and pipeline.
Function of the pressure switch is to open system inlet valve at pre determined pressure.
When the condenser is connected, air is sucked into the vacuum pump from flange interface via pipeline; here system
inlet valve is open.
Check valve is used to prevent air return to the system when the pump stops suddenly.
Air brings some pump fluid, is discharged to the separator from the pump via vent line.
Separator, Air and water are separated. Air is compressed at atmospheric pressure is discharged out of the system via
flange opening.
Working fluid is used for pump water ring. Working fluid flows into the heat exchanger from the separator via pipeline,
returns to the pump via pipeline after cooled down.
RESPONSIBILITY:
SAFTEY PRECAUTIONS:
1. Ensure no permit to work is pending on regarding this system by checking with EE.
SAFTEY PPE’s:
NIL
RESPONSIBILITY
Sr. No. Description
UCE DE FE EE
Starting Procedure of Vacuum Pump
Exahust fans and vacuum pumps are cancelled. All men and materials
are removed.
2. Ensure 415 V supply is normal to vacuum pumps. √ √
3. Ensure air side manual valves of the condenser (6.9 m) are open √ √ √
4. Ensure CW system is in service. √
5. Ensure gland steam condenser is charged from water side. √
6. Ensure one CEP is running and pump water filling line manual isolation √
√
valves are open and water filling solenoid supply should be normal.
7. Charge cooler from open cycle water side and open all manual √
isolation valves.
8. Close vacuum break valves (2 Nos.) √
9. Ensure vacuum pump inlet butterfly valve is closed, isolating valve in
open position and separator water level is normal (>250mm from local
level gauge).
√ √ √
Note: If level not maintained > 250mm in the separator vacuum may
not develop in the pump.
10. Start the pump and check for inlet butterfly valve will open on auto. √
11. Separator tank level should normal √
12. √
13. √
Start the pump and check for inlet butterfly valve will open on auto √
Post-start
1
2 When vacuum reaches 3-5 Kpa,charge gland sealing steam of main turbine
and TDBFPs and maintain pressure about 10-12 Kpa.(For chrging seal steam √
& more detail refer next page)
3 Start Gland steam condenser exhaust fan and put other fan on auto standby. √
4 Check vacuum of condenser is increasing. √ √
5 Check separator water level is normal(>250mm) √
√ √
EMERGENCY SHUT DOWN:
5 GSC exhaust fan vibration or current is high check level of G.S.C, if level is √
high open emergency drain of GSC. Check GSC exhaust fan body drain and
open it.
START PERMISSIVE
1 Vacuum pump inlet valve closed
2 Steam water separator level normal
3 Motor stator winding temp(<120.6) and bearing temperature is normal (<85.6)
Interlock To Trip
1 Pump is running and steam-water separator level low over 600 sec.
2 BRG. Temp more than 95 degc or motor stator winding temp more than 135 degc.
3 Pump is running and vacuum pump inlet valve while running more than 120 sec.
Interlock To Start
1 If one pump trips, then standby pump will start
2 If one pump is running and condenser vacuum still low (-85 Kpa) standby pump will
start
ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control System
o EE: Electrical Shift Engineer