FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

Resubmission for 2ND AIP


Date: 22 August 2016
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

Prepared By: Signature : ________________


Alpha Yau
Date : ________________

Checked By: Signature : ________________


Joseph Ho
Date : ________________

Approved By: Signature : ________________


Victor Cheung
Date : ________________

Resubmission for 2ND AIP


Date: 22 August 2016
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

CONTENTS

Page

1.0 Introduction 1 3.17 Fireman Lift 7

2.0 Design Standards, Statutory Requirements and Regulation 1 3.18 Interfaces with other system 7

3.0 System Description 1 3.19 Miscellaneous Requirements 7


3.1 Scope of works 1 4.0 Maintainability 7
3.2 System Demarcation for the development 2
3.3 Street Fire Hydrant System 2 Appendix
3.4 Fire Services Water Supply 2 A. Calculations 8
3.5 Fire Hydrant and Hose Reel System (FH/HR System) 2
B. Schedule of major materials and equipment 21
3.6 Automatic Sprinkler System including pre-action sprinkler 3
installation C. Schedule of statutory submission 23
D. List of recommended spare parts and components 25
3.7 Manual Fire Alarm and Fire Detection Alarm System (AFA 5
system) E. Fire Services Notes 27

3.8 Gaseous Fire Extinguishing System 5 F. Location of street fire hydrant 33

3.9 Audio/ Visual Advisory System (AVAS) 6 G. Preliminary Schedule of quantity and dimension of all building 35
services plant rooms
3.10 Portable Hand-operated Approved Appliances 6
H. Preliminary Schedule of operation and maintenance 37
3.11 Actuation and Monitoring of Fire Shutter 6
requirements and facilities of each equipment
3.12 Ventilation and Air-Conditioning (VAC) Control Interface 6 I. Estimate of maintenance cost 39

3.13 Provisions of Dangerous Goods (DG) Stores 6 J. Compliance Check List of ER/BS05 - Particular Requirements 42
for Fire Service Installation
3.14 Exit Sign and Directional Sign 6
3.15 Emergency Lighting and Associated Battery System 6
3.16 Emergency Generator 7
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

1.0 Introduction
3.1 Scope of Work
The design of fire services installation has been developed in compliance with the Employer’s
Requirements (ER), regulations issued by statutory bodies and international standards. As noted within the ER Part IV – Building Services Requirements Section BS5 Clause 5.1, the type of
fire service installation to be provided shall comprise, but not limited to the followings:-
The main objective of this AIP design submission is to illustrate the conceptual designs of system
arrangement, plant room layout, control and operational principles of major equipment. The
maintainability of the installation is also addressed. (a) Street Fire Hydrant System;

(b) Fire Service Water Supply;

2.0 Design Standards, Statutory Requirements and Regulation (c) Fire Hydrant and Hose Reel System;

The design of the fire services installation is developed in accordance with the Employer’s (d) Automatic Sprinkler System including pre-action sprinkler installation;
Requirements (ER), Schedule Of Accommodation (SOA), Room Data Sheets (RDS) and the
following statutory regulations and standards as appropriate: - (e) Manual Fire Alarm and Fire Detection Alarm System;

(a) Code of Practice for Minimum Fire Services Installations and Equipment published by the Hong (f) Gaseous Fire Extinguishing System;
Kong Fire Services Department (HKFSD), 2012 edition (FSDCOP)
(g) Audio/ Visual Advisory System;
(b) Circular Letters issued by the HKFSD
(h) Portable hand-operated approved appliances;
(c) Loss Prevention Council (LPC) Rules for Automatic Sprinkler Installations incorporating BS
EN-12845:2003 (i) Automatic actuating devices for Fire Compartmentation ;

(d) Waterworks’ requirements for fire service installations issued by the Water Authority (j) Ventilation and air-conditioning (VAC) control interface;

(e) General Specification for Fire Service Installation in Government Buildings of the HKSAR (2012 (k) FS Provisions for Dangerous Goods (DG) Stores and fuel storage rooms;
Edition) published by Building Services Branch, Architectural Services Department (FSGS)
(l) Exit sign and Directional Sign;
(f) BS 5839-1: 2002 + A2: 2008, Fire detection and alarm systems for buildings – Part 1: Code of
practice for system design, installation and servicing (m) Emergency lighting and associated battery system;

(g) Design Manual: Barrier Free Access 2008 issued by Buildings Department (n) Emergency Generator
(h) NFPA 2001 Standard on Clean Agent Fire Extinguishing Systems, 2008 Edition

(i) Code of Practice for Fire Safety in Buildings 2011 issued by Buildings Department

3.0 System Description

1
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

FH/HR system and a 100mm dia supply pipe for the sprinkler system. Internal check meter position will
3.2 System Demarcation for the development be provided respectively for each water tank for water leakage detection according to Section 5.1 of
Handbook on Plumbing Installation for Building published by WSD.

Proposed Town Main Connection Point at Hoi Ting Road on North Tower G/F

3.3 Street Fire Hydrant System

Site survey revealed that an existing street fire hydrant is located in Hoi Ting Road and is at a distance
not greater than 100m from both Tower. Therefore internal street fire hydrant system is not required 3.5 Fire Hydrant and Hose Reel System (FH/HR system)
according to FSDCOP.
3.5.1 System Design and Arrangement

As the development is in the form of two towers configuration, two FH/HR systems will be provided for
3.4 Fire Service Water Supply
(a) North Tower and Basement Floors;
The Fire Service Water Supply will be taken from the fresh water town main at Hoi Ting Road. (b) South Tower

A Master Meter for FS water supply will be provided inside the Master Water Meter Room located on G/F As the largest floor area for each tower exceeds 920 m2, the minimum effective capacity of F.S. tank
of the North Tower. The main 150mm dia. FS water supply pipe will branch into two 150mm dia. FS water required is 36m3 according to FSDCOP. Since the height between the topmost hydrant and the lowest
supply pipes for North Tower and South Tower. Fire Service inlet exceeds 60m in both tower, intermediate booster pump sets are required for both
FH/HR system.
In each tower, the 150mm dia. FS water supply pipe will branch into a 80mm dia supply pipe for the

2
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

In North Tower, the FS water Tank will be provided on 1/F. The fixed fire pump set (one duty, one
standby) and jockey pump will be provided inside the F.S. Pump Room (North Tower) on G/F. The FS All the status of the fixed fire pump sets shall be indicated at the local pump control panel and
water tank on 1/F will be accessible from the 1/F pump room. The intermediate booster pump sets transmitted to the Main Fire Alarm Panel for monitoring
(one duty, one standby) will be provided inside this pump room.
Pressure switches will be provided for starting of the fixed fire pump sets. The pump will be activated
In South Tower, the FS water Tank will be provided on B1/F. The fixed fire pump set (one duty, one by change of system pressure as measured by pressure switch installed at the pump discharged
standby) and jockey pump will be provided inside the F.S. Pump Room (South Tower) on B1/F header.
adjacent to the F.S. water tank. The intermediate booster pump sets (one duty, one standby) will be
provided inside this pump room. The intermediate booster pump sets shall be started by its respective start/stop push buttons provided
adjacent to the Fire Service inlets of each tower.
Fire hydrant will be provided in all required staircase enclosure. Duplicate pressure reducing valve sets
(one duty and one standby) will be provided in both tower on 8/F to maintain the system operating All the status of the intermediate booster pump sets shall be indicated at the local pump control panel
pressure on all floors between 350kPa and 850kPa as per FSDCOP requirement. (For the valve set and transmitted to the Main Fire Alarm Panel for monitoring. Also, Pump running indicator lights and
arrangement detail, please refer to the system schematic diagram) Pressure regulated type Fire alarm buzzers shall be installed adjacent to the push buttons provided adjacent to the Fire Service
Hydrants will also be employed lowest two floors of each pressure zone to maintain the pressure inlets.
requirement.
The intermediate booster pump sets (1 duty and 1 standby) shall be interlocked with each other. In
Hose reels will be provided to ensure that every part of the building can be reached by a length of not case the duty pump fail to operate, the standby pump will be operated automatically.
more than 30m hose reel tubing. Each hose reel nozzle will be completed with a metal locking box and
padlock so that the hose reel nozzle can only be taken out either by unlocking the padlock or breaking When water level in the F.S. water tanks falls to the low water level or rises to the overflow level, an
the front glass. The nozzle box glass will be of a frangible type and will not exceed 1.5mm in thickness. audible and visual indication shall be triggered at the local pump control panel and the Main Fire Alarm
The box will be of such size and design so as not to cause any undue obstruction to the free use of the Panel.
hose reel. A metal striker will be provided in the vicinity of the cabinet for the purpose of breaking the
nozzle box glass in case of emergency.
3.6 Automatic Sprinkler System including pre-action sprinkler installation
Fire hydrant and hose reel system schematic is shown on drawing no.: PMB1(BS)/5798/FS101.
3.6.1 System Design and Arrangement

As the development is in the form of two towers configuration, two sprinkler systems will be provided
3.5.2 Fire Service Inlets for

The FS inlets serving the North Tower and South Tower will be provided inside the towers' respective (a) North Tower and Basement Floors;
FS Control Valve and Inlet Cabinet on G/F. Each inlet will be facing the internal EVA. The FS inlets of (b) South Tower
both tower will be interconnected by a common header. Permanent notice is to be provided at
prominent location of each FS inlet. The design of sprinkler system shall conform with LPC Rules for Automatic Sprinkler Installations
incorporating BS EN-12845:2003 and FSD circular letter No. 3/2006 and 3/20012.

3.5.3 Control Philosophy and System Monitoring For North Tower and the basement floors, the sprinkler system shall conform to OH3. A 124m3
sprinkler tank will be provided on 1/F. The sprinkler pump set (1 duty and 1 standby) and two sprinkler
Upon activation of any manual call point in the North Tower or the basement floors, the fixed fire pump jockey pump will be provided inside the Sprinkler Pump Room (North Tower) on 1/F adjacent to the
of North Tower FH/HR systems will be operated. sprinkler water tank. The sprinkler pump will also serve as the sprinkler intermediate booster pump.

Upon activation of any manual call point in South Tower, the fixed fire pump of South Tower FH/HR The North Tower sprinkler system is divided into two vertical sprinkler zones as the tower exceeds 45m
systems will be operated. in height. Separate sprinkler jockey pumps are provided to each sprinkler zone.
For South Tower, the sprinkler system will conform to both OH3 and OH4 (for exhibition areas such as
Once the pump is activated, it can only be stopped by manual stop button on the local pump control the art gallery on G/F only). Separate sprinkler pump sets will be provided for the OH3 and OH4
panel. sprinkler installations.

The fixed fire pump sets (1 duty and 1 standby) shall be interlocked with each other. In case the duty A 134m3 sprinkler tank will be provided on the B1/F. Two sprinkler pump set (each set consist of 1 duty
pump fail to operate, the standby pump will be operated automatically. and 1 standby) and three sprinkler jockey pump will be provided inside the Sprinkler Pump Room

3
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

(South Tower) on B1/F adjacent to the sprinkler water tank. The sprinkler pump set of OH3 installation Sprinkler inlets will be provided on G/F adjacent to the sprinkler control valves. The inlets of both
will also serve as the sprinkler intermediate booster pump. towers will be interconnected by a common header. Permanent notice are to be provided at prominent
location for each sprinkler control valve/ inlet to indicate the sprinkler zone connected.
The South Tower OH3 sprinkler system is divided into two vertical sprinkler zones as the tower
exceeds 45m in height. The OH4 sprinkler system will be designed as a separate sprinkler zone. 3.6.3 Control Philosophy and System Monitoring
Separate sprinkler jockey pumps are provided to each sprinkler zone. Below is a summary table on the
sprinkler zone: The sprinkler pumps will be activate when the downstream drops below the preset value. Pressure
switch starting device will be provided immediately downstream of each outlet check valve of sprinkler
North Tower and Basement Floors South Tower pump set for automatic pump starting.
OH3 Low zone (B2/F to 5/F) OH3 Low zone (G/F to 7/F)
Once the sprinkler pump is activated, it can only be stopped by manual stop button on the local pump
OH3 High zone (6/F to UR/F) OH3 High zone (8/F to UR/F) control panel.
OH4 zone (G/F)
The sprinkler pump sets (1 duty and 1 standby) shall be interlocked with each other. In case the duty
Sprinkler systems are designed to protect the entire building area except the E/M plant rooms, fire pump fail to operate, the standby pump will be operated automatically.
control centre and the E/M ducts/shafts/risers/cabinets. Exemption of sprinkler provision for any other
area shall be submitted to FSD for approval. All the status of the pump sets shall be indicated at the local pump control panel and transmitted to
the Main Fire Alarm Panel for monitoring. Also, Pump running indicator lights and alarm buzzers shall
Except for the OH4 zone on G/F ,each sprinkler zone installation is provided with 2 Nos. riser. Water be installed adjacent to the push buttons provided adjacent to the Fire Service inlets.
flow switches and subsidiary stop valves will be provided for all main distribution pipes of each floor. 4
Nos. subsidiary stop valves will be provided on each floor as per ER Clause 5.4.D. A minimum 15% The sprinkler pumps shall also be started by its respective start push buttons provided adjacent to the
spare capacity for sprinklers will be allowed in each sprinkler subsidiary stop valve for addition of sprinkler inlets of each tower. Also, Pump running indicator lights and alarm buzzers shall be installed
sprinkler in future. adjacent to the push buttons provided adjacent to the sprinkler inlets.

For aboveground floors, drain risers ending toward the drainage system will be provided for the When water level in the sprinkler water tanks falls to the low water level or rises to the overflow level,
subsidiary zone valves on every floor's distribution pipe. an audible and visual indication shall be triggered at the local pump control panel and the Main Fire
Alarm Panel.
For Basement floors, the drain pipes of subsidiary stop valves will end toward the nearest floor drain.
3.6.4 Pre-action sprinkler installation
Any future modification of the sprinkler layout will only be required to drain off the sprinkler system on
the respective floor. The drains shall not be exposed in the front of house areas. Pre-action sprinkler installation will be installed to the following areas (which are not intended to be
protected by the gaseous extinguishing systems and accidental operation of sprinkler heads is
Sprinkler heads exposed under false ceiling will be finished to polyester white color and matching with undesirable) to minimize the risk of accidental operation and water damage:-
the false ceiling color. Fast response type sprinkler heads will be provided for the entire basement area
and the associated staircase leading to G/F. I.) Building Management Offices, Control Room, Rack Room on both Towers' G/F (where
control/monitoring equipment and important documents are stored inside);
According to HKFSD Circular Letter 3/2006, sprinkler system protection is not required inside the ii.) TCD- Monitor Room on South Tower 15/F (where monitoring equipment are stored inside);
raised floor void where the space is physically inadequate and not feasible for the sprinkler installation. iii) Traffic Management and Information Centre (TMIC) - Control room on South Tower 15/F;
Only non-combustible materials can be put inside such raised floor void. Detail arrangement will be iv.) TMIC - Viewing Gallery + High Command Room on South Tower 16/F;
submitted to HKFSD for approval. v.) TMIC - ICCR on South Tower 15/F;
vi.) TMIC - Store & Testing Room on South Tower 15/F (where important documents and
Automatic sprinkler system schematic is shown on drawing no. PMB1(BS)/5798/FS102. testing equipment are stored inside);

3.6.2 Sprinkler Control Valve and Sprinkler Inlets


The pre-action sprinkler system will be teed-off from wet sprinkler distribution pipes with the pre-action
For each sprinkler zone, a sprinkler control valve shall be provided. The sprinkler control valves
control valve sets located inside the designated valve cabinets. These cabinets will be located outside
serving each tower will be grouped together and installed inside the towers' respective FS Control
and adjacent to their respective protected area. Drainage point will be provided inside each valve
Valve and Inlet Cabinet on G/F. i.e. 2 Nos. of sprinkler control valve will be installed inside the North
cabinet for easy draining. Sprinkler water capacity will be increased accordingly to suit the pre-action
Tower Cabinet and 3 Nos. of sprinkler control valve will be installed in the South Tower Cabinet.
installations. Details on the increased tank capacity will be provided in DDA stage as the full sprinkler
layout is required for calculation.

4
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Room. Each tower's alarm panel shall receive the common fire alarm signal from the other tower.
Type A pre-action sprinkler installation in according to BSEN 12845 will be used in this development. Manual fire alarm and fire detection alarm system schematic is shown on drawing no.:
This is a normal dry pipe installation in which the pre-action control valve set is activated by the smoke PMB1(BS)/5798/FS103.
detectors provided inside the protected premise but not by the operation of sprinklers. The air/inert gas
pressure in the installation shall be monitored at all times. At least one manually operated quick
opening valve shall be installed in an appropriate position to the satisfaction of the Architect and the 3.8 Gaseous Fire Extinguishing System
FSD to enable the pre-action valve to be activated in an emergency.
Gaseous fire extinguishing system will be provided in accordance with the Code of relevant NFPA for
Clean Agent Fire Extinguishing System (Standard 2001) to the following areas/ rooms as per the ER
3.7 Manual Fire Alarm and Fire Detection Alarm System (AFA system) and RDS (which are not intended to be protected by the fire suppression/extinguishing systems using
water) to minimize the risk of accidental operation and water damage:-
3.7.1 System Design and arrangement
(a) Server Rooms,
(b) Network Room and Network Distribution Rooms,
Manual fire alarm and fire detection alarm system will be designed in accordance with the BS 5839: (c) D.G. Store
Part 1:2002+A2: 2008 with local modifications as per FSD Circular Letter No. 1/2009. Two (d) Fuel Tank Room
independent fire alarm and detection system will be provided for (e) PABX Rooms
(a) North Tower and Basement Floors
(b) South Tower Novec 1230 will be the clean agent to be employed as it is the only clean agent meets the
requirements in the ER clause 5.6.iv.
Fire detectors will be provided in the F.S. Control Centre, the entire basement area excluding the car
parking areas and all E&M plant rooms except E/M ducts/shafts/risers/ cabinets. The extinguishing system type to be employed is dependent on the volume of the protected premise.

Multi-sensor detectors (functioning as smoke detection) will be provided in TBE room, Network Gaseous fire extinguishing system schematic is shown on drawing no.: PMB1(BS)/5798/FS104.
Distribution Room, Network Room, Server Room and other areas to be protected by Gaseous fire
extinguishing system or Pre-action sprinkler system. 3.8.1 Gas Total Flooding System
At each hose reel location, a manual call point, an alarm bell and a visual fire alarm (in form of flashing
red light) will be provided. Upon activation of any manual call point, the fixed fire pump connected to Novec 1230 total flooding system shall be provided to protect premise of internal volume exceed 42m3.
the respective AFA system shall be operated. All manual call point to be installed at outdoor or non-air For details on these rooms, please refer to the room schedule as shown in the Gaseous fire
conditioned areas shall be of weatherproof type to IP 65. Upon receiving fire alarm signal, alarm bells extinguishing system schematic. (drawing no.: PMB1(BS)/5798/FS104)
and visual fire alarm on all floors shall sound and flash respectively.
Gas total flooding system is made up of a number of gas cylinders, fire detectors, system control panel,
discharge nozzles and pipelines.
3.7.2 Signal monitoring arrangement
Since the rooms requiring Novec1230 total flooding protection are likely to house energized electrical,
The Fire Alarm Panel of North Tower will be provided inside the Fire Control Centre (North Tower) equipment, the design concentration of the gas system will be 4.73% as per manufacturer's
located on G/F. Signals of every fire service system installed for North Tower and Basement Floors will recommendation.
be transmitted to this fire alarm panel. This fire alarm panel shall be connected to the Fire Service
Communication Centre (FSCC) via a direct telephone line for North Tower and Basement Floors. The gas agent can be discharged to the protected premises on fire by automatic or manual control.
Multi-sensor detectors (functioning as smoke detector) wired in two coincidence zones shall be
The Fire Alarm Panel of South Tower will be provided inside the Fire Control Centre (South Tower) provided for fire detection. Sufficient warning signs, notices and time delay are to be allowed to ensure
located on G/F. Signals of every fire service system installed for South Tower will be transmitted to this all occupancies in the protected premises can evacuate before gas discharge.
fire alarm panel. This fire alarm panel shall be connected to the FSCC via a separate direct telephone
line for South Tower. As per ER clause 5.6,ii , permanently connected duty and standby banks of gas cylinders shall be
provided for large system (installation consists of more than 2 cylinders) to cater for the continued
operation of the rooms in the event of accidental discharge. The amount of gas agent to be stored for
Each Tower's Fire Alarm Panel will be provided with a high level interfacing point for connection to the each system is dependent on the volume of the protected premise. It shall be calculated based on
CCMS. individual room volume and characteristic.

Gas total flooding system is designed to totally discharge the gas within 10 seconds after receiving the
Repeater panels will be provided in each tower's respective Building Management Office and Control

5
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

discharge signal. In case of mal-function of the detection system, the gas discharge operation can be parking areas. 9 litres water/CO2 portable fire extinguishers will be provided in Refuse Storage and
manually activated in the extinguishing control unit or electrical manual release unit which is to be Material Recovery Chamber on B2/F and all Refuse Room on Tower floors. Sand buckets will be
located outside the protected premises. provided for car parking areas and loading/unloading.

3.8.2 Fixed Sprayer Unit


3.11 Actuation and Monitoring of Fire Shutter
Novec 1230 Fixed sprayer units shall be provided to protect premise of internal volume below 42m3.
For details on these rooms, please refer to the room schedule as shown in the Gaseous fire Multi-sensor detectors (functioning as smoke detection) will be provided on both sides of fire shutter.
extinguishing system schematic. (drawing no.: PMB1(BS)/5798/FS104) Each fire shutter is individually controlled by its associated detectors. Upon receiving alarm signal from
the detector, the fire shutter shall begin to close automatically.
Fixed sprayer units are self-contained installation, able to automatically operate in case of fire by the
operation of sprinkler head fitted on the container. (the sprinkler head shall operate at 68°C.) The fire shutter detectors shall be connected to the AFA system with independent indication on the fire
alarm panel. The status of fire shutter will also be indicated on the fire alarm panel.
For application in DG store, Intrinsically heat detectors will be provided for the activation of local fire
alarm panel and electro thermal link 24V D.C. dry contact will be provided to Fire Shutter on South Tower 2/F to stop the adjacent
escalators automatically upon actuation of the fire shutter.

3.9 Audio/ Visual Advisory System (AVAS)


3.12 Ventilation and Air-Conditioning (VAC) Control Interface
Audio/Visual Advisory Ssystem shall be provided in the public area on Basement 2 Floor and South
Tower 1/F & 2/F. For each Tower, the fire alarm system will be interfaced to the air-conditioning system for
Ventilation/Air Conditioning Control (VAC) system control operation according to FSDCOP. Manual
No audio/visual advisory system shall be provided to other floors due to the followings: override control of VAC system will be provided adjacent to the master fire alarm panel to ensure
i.) the carpark area on basement 1 floor do not exceed 2000 m sq. satisfactory operation. Method “B” is proposed and to be described in detail under separate
ii.) the public area on ground floor within each tower do not exceed 2000 m sq. submission package of the air-conditioning installation.
iii.) the office floors are not accessible to visitors.

The Public Address (PA) system of each tower will be employed as the audio portion of each tower's 3.13 Provisions of Dangerous Goods (DG) Stores
respective AVAS system. The control console of the PA system will be housed in the each tower's
respective Fire Control Centre. Novec1230 Fixed sprayer units will be provided for fuel tank rooms of room volume not exceeding
42m3. Intrinsically safe heat detector and manual call point will be installed. Local fire alarm panel,
Upon receiving fire alarm, the fire alarm panel of each tower will transmit alarm signal to its respective damper actuator and actuating cable will be provided. Provision for Dangerous goods stores and full
PA system control console via a 24V D.C. dry contact to activate the emergency broadcast mode. In storage rooms shall be in accordance with HKFSD’s regulation.
emergency broadcast mode, the PA system will advise staff and other occupants of emergency
conditions and the action to be followed. 3.14 Exit Sign and Directional Sign
The visual portion of AVAS is made up of flashing lights with directional signs, which may be Sufficient LED exit signs and LED directional signs will be provided to ensure that all exit routes from
incorporated to the exit signs and directional signs as required in the FSDCOP, and it is supplemented any floor within the building are clearly indicated as required by the configuration of staircases serving
by low level directional signs to indicate the building. All exit signs will be supplied and installed in accordance with BS 5499 and FSD
requirement.
(a) the floors and/or areas to be evacuated by operating the flashing lights with directional signs at
the corresponding floors and/or areas, The exit sign will be supplied by the central battery system of the emergency lighting system. The
(b) the evacuation routes by following the low level directional signs. design detail will be covered in the submission package under Electrical Installation.
Audio/visual advisory system schematic is shown on drawing no. PMB1(BS)/5798/FS105. 3.15 Emergency Lighting and Associated Battery System

Foe Each tower, a central battery type emergency lighting system will be provided to cover the building
3.10 Portable Hand-operated Approved Appliances and all exit routes leading to ground level and to other open areas. The system will be designed in
compliance with BS5266: Part 1:1999 and BS EN 1839:1999. The design of the system will be
4.5 kg CO2 portable fire extinguisher will be provided in all E&M plant rooms, DG stores and the car covered in the submission package under Electrical Installation.

6
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Aboveground pipework
3.16 Emergency Generator For pipe size 15mm diameter to 150mm diameter, galvanized steel pipe to BSEN 10255:2004
(medium grade) shall be used.
For each tower, an emergency generator of sufficient electrical capacity to supply emergency power to
the entire fire service installation will be provided. The design of the generator system will be covered For pipes of diameter larger than 50 mm up to 150 mm, Mechanical pipe couplings shall be used.
in the submission package under Diesel Generator Installation. For pipes of diameter less than or equal to 50 mm, screwed joints and screwed joints fittings shall be
used.
3.17 Fireman Lift
Underground pipework
Fireman lift will be provided in accordance with the Code of Practice for Fire Safety in Buildings 2011 For pipe size from 50mm diameter to 150mm diameter, Ductile iron pipes and fittings to BS EN 545
issued by the Buildings Department. The design of the system will be covered in the submission Class K12 shall be used.
package under Lift and Escalator Installation.
Mechanical pipe couplings of approved type that can provide the required allowance for angular
3.18 Interfaces with other system deflection and contraction and expansion shall be used for all underground pipework.

In addition to the interface described in previous sections, the fire service installation will also have the
following interfaces to other systems: - Water pumps for FH/HR system
Water pumps for hydrant/hose reel systems will be comply with FSDCOP, FSD Circular letters, FSGS
(a) CCMS and wherever applicable BS 5306-1: 2006. Pumps will be manufactured by a ater pumps for sprinkler
(b) Security system for Door Access Control system
(c) Lift installation for homing operation
Water pumps for sprinkler system will be comply with the LPC Rules for sprinkler installations.
The electrical door locking devices in each tower shall be capable of automatic release upon receiving Sprinkler pumps will be approved by LPCB or other similar widely recognized independent regulatory
the common fire alarm signal from the respective tower's fire detection system or manual alarm system. body acceptable by the Architect.
A 24V D.C. dry contact will be provided in each tower's FS Control Centre to interface the fire alarm
signal to the tower's respective Security system for Door Access Control. Each Door Access Control Materials of pump components will be comply with Clause B4.5 of FSGS.
System will be provided with a Central Manual Override Switch (by others) in each tower's respective
Control Room on G/F. Central battery system
A central battery power supply system (CBS) comply with FSGS will be provided to backup the
Upon power failure, the electrical door locking device shall be released automatically. emergency lighting system, exit sign and directional sign. The battery capacity of the CBS will maintain
15minutes full operation of the CBS system.
To facilitate Lift Homing operating upon the fire alarm, a 24V D.C. dry contact will be provided in each
tower's FS Control Centre as the interfacing point to lift installation. 4.0 Maintainability

A high level interfacing point will be provide at the Fire Alarm Panel in the North Tower for interfacing All proposed major fire services equipment and installation for the West Kowloon Government Offices
with the CCMS. All signals from North Tower and Repeated Signal from South Tower shall be shall comply with the ER, the FS GS and in the good trade practices, such that the material and
interfaced to the CCMS for monitoring. equipment are to be chosen good in quality and highly durable.

Sufficient servicing space is to be allowed within the fire control centre, FS pump room, Sprinkler pump
3.19 Miscellaneous Requirements room and Novec 1230 cylinder rooms. The entrance doors of the plant room are to be provided with
sufficient width for removal of equipment. Sufficient width of access routes from plant room entrance
door is to be created to reach every equipment item.
Pipework Local pump control panels are to be located close to entrance door to facilitate inspection of equipment
All aboveground and underground pipework and fittings will be comply with FSGS. operation. Equipment that need frequent access are to be located close to door.

7
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX A

Calculations

8
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Calculation of Fixed Fire Pump (North Tower and Basement Floors) - FP-NT-01 & 02 6.05 × 10 5
Friction loss of 150mm pipe = P = × 174.4 × 9001.85
1201.85 × 150 4.87
Flow and pressure requirement of topmost fire hydrant outlet at LV 74.85 : 900L/min, 3.5bar = 0.11 bar
Pump head = Static pressure +3.5 bar + Pipe friction loss+ Outlet friction loss
6.05 × 10 5
Friction loss of 100mm pipe = P = × 74 × 9001.85
Height difference from topmost fire hydrant to pump outlet on 1/F: 1201.85 × 100 4.87
= 74.85 + 1.1 - (12.2 + 0.9) = 62.85 ~ 63m = 0.34 bar

Static pressure required = 6.3 bar Total pipe friction loss = 0.11 + 0.34 = 0.45 bar

Pipe length: Required pump Head = Static pressure +3.5 bar + Total pipe friction loss+ Outlet friction loss
150mm pipe from 1/F to 9/F = 62m = 6.3 +3.5+0.45+0.5
= 10.75 (say 12 bar)
Equivalent length of 150mm fittings and valves:
150mm elbow = 9 x 4.3m = 38.7m Pump Duty for Fixed Fire Pump (North Tower and Basement Floors) - FP-NT-01 & 02:
150mm gate valve = 1 x 1.1m = 1.1m 12 Bar @ 900 l/min
150mm check valve = 2 x 32m = 64m
150mm tee = 1 x 8.6m = 8.6m
Total = 112.4m Calculation of F.S. Jockey Pump (North Tower and Basement Floors) - FJP-NT-01

100mm pipe from 9/F to LV 74.85 = 43.6m. Required pump Head = Running pressure of fixed fire pump +1 bar allowance for cut-in/cut-out
= 12 + 1
Equivalent length of 100mm fittings and valves: = 13 bar
100mm elbow = 2 x 3m = 6m
100mm tee = 4 x 6.1m = 24.4m Pump Duty for F.S Jockey Pump (North Tower and Basement Floors) - FJP-NT-01:
Total = 30.4m 13 Bar @60 l/min

Total equivalent length:


150mm pipe = 62+112.4 = 174.4m
100mm pipe = 43.6 + 30.4 = 74m

Pipe friction loss:


The frictional loss due to water flow is calculated using Hazen-William formula
6.05 × 10 5
P= 1.85 4.87
× L × Q1.85
C ×d

9
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Calculation of Intermediate Booster Pump (North Tower and Basement Floors) - FIP-NT-01 & 02
Pressure requirement of topmost fire hydrant outlet at LV 74.85: 3.5bar
Flow Requirement : 1800 l/min

Static pressure required = 6.3 bar

Total Equivalent length from Intermediate Booster Pump to topmost hydrant is identical to
that of Fixed Fire Pump.

Total equivalent length:


150mm pipe = 95.7+80.4 = 174.4m
100mm pipe = 43.6 + 30.4 = 74m

Pipe friction loss:


The frictional loss due to water flow is calculated using Hazen-William formula
6.05 × 10 5
P= 1.85 4.87
× L × Q1.85
C ×d

6.05 × 10 5
Friction loss of 150mm pipe = P = × 174.4 × 18001.85
1201.85 × 150 4.87
= 0.4bar

6.05 × 10 5
Friction loss of 100mm pipe = P = × 74 × 18001.85
1201.85 × 100 4.87
= 1.22 bar

Total pipe friction loss = 0.4 + 1.22 = 1.62 bar

Required pump head = Static pressure +3.5 bar + Pipe friction loss+ Outlet friction loss - 8 bar from fire engine
= 6.3 + 3.5 + 1.62 + 0.5 - 8
= 3.92 (say 5 bar)

Pump Duty for Intermediate Booster Pump (North Tower and Basement Floors) - FIP-NT-01 & 02:
5 Bar @ 1800 l/min

10
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Justification for providing Pressure Reducing Valve Set on 8/F (North Tower) Justification for Pressure Reducing Fire Hydrant Provision (North Tower)

Design Pump Duty of the Fixed Fire Pump on 1/F = 12 Bar @ 900 l/min Based on the previous calculation, FH/HR System Pressure on 8/F = 8.825 bar
Typical office floor height = 4m
Height difference from 8/F High level to pump outlet on 1/F:
= 40.2 + 3.5 - (12.2 + 0.9) = 30.6 ~ 31m The pressure on the two floors above would be :
System Pressure on 9/F = 8.825 - 0.4 = 8.425 Bar
Static pressure loss from pump outlet to 8/F High Level = 3.1 bar System Pressure on 10/F = 8.825 - 0.8 = 8.025 Bar
System Pressure on 11/F = 8.825 - 1.2 = 7.625 Bar
Pipe length: System Pressure on 12/F = 8.825 - 1.6 = 7.225 Bar
150mm pipe from 1/F to 8/F = 58m
The System Pressure on 8/F after the Pressure Reducing Valve Set = 4 Bar
Equivalent length of 150mm fittings and valves: Height difference from 8/F to 1/F = 40.2 - 12.2 = 28m
150mm elbow = 8 x 4.3m = 34.4m Height difference from 8/F to G/F = 40.2 - 6.7 = 33.5m
150mm gate valve = 1 x 1.1m = 1.1m Height difference from 8/F to B1/F = 40.2 - 2.6 = 37.6m
150mm check valve = 2 x 32m = 64m Height difference from 8/F to B2/F = 40.2 - (-2.2) = 42.4m
150mm tee = 2 x 8.6m = 17.2m
Fire Hydrant Pressure on 1/F = 4 + 2.8 = 6.8 Bar
Total Equivalent Length = 116.7 +58 = 174.7m Fire Hydrant Pressure on B1/F = 4 + 3.76 = 7.76 Bar
Fire Hydrant Pressure on B2/F = 4 + 4.24 = 8.24 Bar
Pipe friction loss:
The frictional loss due to water flow is calculated using Hazen-William formula As a measure to ensure the FSD' pressure requirement on FH/HR system (not more than 850 kPa) can be
5 complied with during system inspection, Pressure Reducing Fire Hydrant will be provided on floors where the
6.05 × 10
P= 1.85 4.87
× L × Q1.85
C ×d system pressure exceeds 750 kPa (7.5 Bar)

6.05 × 10 5 Therefore, Pressure Reducing Fire Hydrant will be provided on B2/F, B1/F and North Tower 9/F, 10/F & 11/F.
Friction loss of 150mm pipe = P = 1.85 4.87
× 174.7 × 9001.85
120 × 150
= 0.11 bar
When Fixed Fire Pump is running, the FH/HR System Pressure on 8/F
= 12 - 3.1- 0.11 = 8.8 bar = 880 kPa
which is > 850 kPa (max system pressure accepted by FSD)

Therefore, Pressure reducing valve set shall provided on North Tower 8/F

11
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Calculation of Fixed Fire Pump (South Tower) - FP-ST-01 & 02 6.05 × 10 5


Friction loss of 150mm pipe = P = 1.85 4.87
× 167 × 9001.85
120 × 150
Flow and pressure requirement of topmost fire hydrant outlet at LV 82.5 : 900L/min, 3.5bar = 0.11 bar
Pump head = static pressure +3.5 bar + Pipe friction loss+ outlet friction loss
6.05 × 10 5
Friction loss of 100mm pipe = P = 1.85 4.87
× 82.5 × 9001.85
Height difference from topmost fire hydrant to pump outlet on B2/F: 120 × 100
= 82.5 + 1.1- (-2.2 + 0.9) = 84.9m = 0.38 bar

Static pressure required = 8.5 bar Total pipe friction loss = 0.11 + 0.38 = 0.49 bar

Pipe length: Required Pump head = static pressure +3.5 bar + Pipe friction loss+ outlet friction loss
150mm pipe from 1/F to 9/F = 69.2m = 8.5 + 3.5 + 0.49 + 0.5
= 12.99 bar (say 13.5 bar)
Equivalent length of 150mm fittings and valves:
150mm elbow = 13 x 4.3m = 55.9m Pump Duty for Fixed Fire Pump (South Tower) - FP-ST-01 & 02
150mm gate valve = 1 x 1.1m = 1.1m 13.5 Bar @ 900 l/min
150mm check valve = 1 x 32m = 32m
150mm tee = 1 x 8.6m = 8.6m Calculation of F.S. Jockey Pump (South Tower) - FJP-ST-01
Total = 97.6m
Required pump Head = Running pressure of fixed fire pump +1 bar allowance for cut-in/cut-out
100mm pipe from 9/F to LV 82.5 = 55.1m. = 13.5 + 1
= 14.5 bar
Equivalent length of 100mm fittings and valves:
100mm elbow = 1 x 3m = 3m Pump Duty for F.S Jockey Pump (South Tower) - FJP-ST-01:
100mm tee = 4 x 6.1m = 24.4m 14.5 Bar @60 l/min
Total = 27.4m

Total Equivalent length:


150mm pipe = 69.2+97.6 = 167m
100mm pipe = 55.1+27.4 = 82.5m

Pipe friction loss:


The frictional loss due to water flow is calculated using Hazen-William formula
6.05 × 10 5
P= × L × Q1.85
C 1.85 × d 4.87

12
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Calculation of Intermediate Booster Pump (South Tower) - FIP-ST-01 & 02


Pressure requirement of topmost fire hydrant outlet at LV 82.5 : 3.5bar
Flow Requirement : 1800 l/min

Static pressure required = 8.5 bar

Total Equivalent length from Intermediate Booster Pump to topmost hydrant is identical to
that of Fixed Fire Pump.

Total Equivalent length:


150mm pipe = 69.2 + 97.6 = 167m
100mm pipe = 55.1 + 27.4 = 82.5m

Pipe friction loss:


The frictional loss due to water flow is calculated using Hazen-William formula
6.05 × 10 5
P= × L × Q1.85
C 1.85 × d 4.87

6.05 × 105
Friction loss of 150mm pipe = P = 1.85 4.87
× 167 × 18001.85
120 × 150
= 0.39bar

6.05 × 10 5
Friction loss of 100mm pipe = P = 1.85 4.87
× 82.5 × 18001.85
120 × 100
= 1.36 bar

Total pipe friction loss = 0.39 + 1.36 = 1.75 bar

Required Pump head = static pressure +3.5 bar + Pipe friction loss+ outlet friction loss - 8 bar from fire engine
= 8.5 + 3.5 + 1.75 + 0.5 - 8
= 6.25 (say 6.5 bar)

Pump Duty for Intermediate Booster Pump (South Tower) - FIP-ST-01 & 02:
6.5 Bar @ 1800 l/min

13
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Justification for providing Pressure Reducing Valve Set on 8/F (South Tower) Justification for Pressure Reducing Fire Hydrant Provision (South Tower)

Design Pump Duty of the Fixed Fire Pump on B2/F = 13.5 Bar @ 900 l/min Based on the previous calculation, FH/HR System Pressure on 8/F = 8.9 bar
Typical office floor height = 4m
Height difference from 8/F High Level to pump outlet on B2/F:
= 40.2 + 3.5 - (-2.2 + 0.9) = 45m The pressure on the two floors above would be :
System Pressure on 9/F = 8.9 - 0.4 = 8.5 Bar
Static pressure loss from pump outlet to 8/F High Level = 4.5 bar System Pressure on 10/F = 8.9 - 0.8 = 8.1 Bar
System Pressure on 11/F = 8.9 - 1.2 = 7.7 Bar
Pipe length: System Pressure on 12/F = 8.9 - 1.6 = 7.3 Bar
150mm pipe from 1/F to 8/F = 65.2m
The System Pressure on 8/F after the Pressure Reducing Valve Set = 4 Bar
Equivalent length of 150mm fittings and valves: Height difference from 8/F to 1/F = 40.2 - 12.2 = 2886m
150mm elbow = 13 x 4.3m = 55.9m
150mm gate valve = 1 x 1.1m = 1.1m Fire Hydrant Pressure on 1/F = 4 + 2.8 = 6.8 Bar
150mm check valve = 1 x 32m = 32m
150mm tee = 1 x 8.6m = 8.6m As a measure to ensure the FSD' pressure requirement on FH/HR system (not more than 850 kPa) can be
complied with during system inspection, Pressure Reducing Fire Hydrant will be provided on floors where the
Total equivalent length = 65.2+97.6 = 162.8m system pressure exceeds 750 kPa (7.5 Bar)

Pipe friction loss: Therefore, Pressure Reducing Fire Hydrant will be provided on South Tower 9/F, 10/F & 11/F.
The frictional loss due to water flow is calculated using Hazen-William formula
6.05 × 10 5
P= 1.85 4.87
× L × Q1.85
C ×d

6.05 × 10 5
Friction loss of 150mm pipe = P = 1.85 4.87
× 162.8 × 9001.85
120 × 150
= 0.1 bar
When Fixed Fire Pump is running, the FH/HR System Pressure on 8/F
= 13.5 - 4.5- 0.1 = 8.9 bar = 890 kPa
which is > 850 kPa (max system pressure accepted by FSD)

Therefore, Pressure reducing valve set shall provided on South Tower 8/F

14
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Calculation of Sprinkler Pump (North Tower) - SP-NT-01 & 02


Equivalent length of fittings and valves:
According to LPC rules (BS EN 12845) table 16, the flow and pressure requirement are as following:
Low Zone (OH3) High Zone (OH3) Low Zone (OH3) High Zone (OH3)
Low flow 6.2bar @ 1100 L/min 6.2bar @ 1100 L/min 150mm elbow (4.3m) 12Nos = 51.6m 15Nos = 64.5m
High flow 5.9bar @ 1350 L/min 5.9bar @ 1350 L/min 150mm butterfly valve (6.4m) 1Nos = 6.4m 1Nos = 6.4m
Nominal flow 2.5bar @ 3100 L/min 2.5bar @ 3100 L/min 150mm check valve (35m) 1Nos = 35m 1Nos = 35m
150mm tee (8.6m) 3Nos = 25.8m 2Nos = 17.2m
Total = 119m 123.1m
Frictional loss from pump to control valve : Low Zone (OH3) High Zone (OH3)
100mm elbow (3m) 1Nos = 3m 1Nos = 3m
150mm Pipe length: 100mm butterfly valve (4.6m) 1Nos = 4.6m 1Nos = 4.6m
Low Zone (OH3) High Zone (OH3) 100mm tee (6.1m) 2Nos = 12.2m 1Nos = 6.1m
150mm pipe = 29m 28m Total = 19.8m 13.7m
Equivalent length of fittings and valves: Total Equivalent length:
Low Zone (OH3) High Zone (OH3) Low Zone (OH3) High Zone (OH3)
150mm elbow (4.3m) 8Nos = 34.4m 8Nos = 34.4m 150mm pipe = 188m 223.1m
150mm butterfly valve (6.4m) 1Nos = 6.4m 1Nos = 6.4m 100mm pipe = 51.8m 18.7m
150mm check valve (35m) 1Nos = 35m 1Nos = 35m
150mm tee (8.6m) 2Nos = 17.2m 2Nos = 17.2m
Total = 93m 93m Pipe friction loss: Friction loss of 150mm pipe
Total Equivalent length: Low Zone (OH3) High Zone (OH3)
At low flow (1100L/min), At low flow (1100L/min),
Low Zone (OH3) High Zone (OH3)
Friction loss of 150mm pipe = Friction loss of 150mm pipe =
150mm pipe = 122m 121m
6.05 × 10 5 1.85 6.05 × 10 5
P= 1.85 4.87
× 188 × 1100 P= 1.85 4.87
× 223.1 × 11001.85
120 × 150 120 × 150
The frictional loss due to water flow is calculated using Hazen-William formula = 0.18 bar = 0.21 bar
5
6.05 × 10
P= 1.85 4.87
× L × Q1.85 At high flow (1350L/min), At high flow (1350L/min),
C ×d Friction loss of 150mm pipe = Friction loss of 150mm pipe =
Low Zone (OH3) High Zone (OH3) 6.05 × 10 5 6.05 × 10 5
1.85
At low flow (1100L/min), At low flow (1100L/min), P= 1.85 4.87
× 188 × 1350 P = 1.85 4.87
× 223.1× 13501.85
Friction loss of 150mm pipe = Friction loss of 150mm pipe = 120 × 150 120 × 150
= 0.25 bar = 0.3 bar
6.05 × 10 5 1.85 6.05 × 10 5
P= × 122 × 1100 P = × 121× 11001.85 Friction loss of 100mm pipe
1201.85 × 150 4.87 1201.85 × 150 4.87
= 0.12 bar = 0.12 bar Low Zone (OH3) High Zone (OH3)
At low flow (1100L/min), At low flow 1100L/min),
At high flow (1350L/min), At high flow (1350L/min), Friction loss of 150mm pipe = Friction loss of 150mm pipe =
Friction loss of 150mm pipe = Friction loss of 150mm pipe = 6.05 × 10 5 1.85 6.05 × 10 5
P= × 51 . 8 × 1100 P = × 18.7 × 11001.85
6.05 × 10 5 1.85 6.05 × 10 5 1201.85 × 100 4.87 1201.85 × 100 4.87
P= × 122 × 1350 P = × 121× 13501.85
1.85
120 × 150 4.87 1.85
120 × 150 4.87 = 0.35 bar = 0.13 bar
= 0.17 bar = 0.17 bar
At high flow (1350L/min), At high flow (1350L/min),
Friction loss of 150mm pipe = Friction loss of 150mm pipe =
Frictional loss from control valve to design point : 6.05 × 10 5 1.85 6.05 × 10 5
P= 1.85 4.87
× 51 . 8 × 1350 P = 1.85 4.87
× 18.7 × 13501.85
Pipe length (from control valve to design point): 120 × 100 120 × 100
Low Zone (OH3) High Zone (OH3) = 0.51 bar = 0.18 bar
150mm pipe = 69m 100m Friction loss (after control valve)
100mm pipe = 32m 5m Low Zone (OH3) High Zone (OH3)
1100L/min flow 0.18+0.35 = 0.53 bar 0.21+0.13 = 0.34 bar
1350L/min flow 0.25+0.51 = 0.76 bar 0.3+0.18 = 0.48 bar

15
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Static Pressure reduced for Low Zone Installation (from pump to the sprinkler control valve set)
= 6.75 - 12.25 = -5.5 m ~ - 0.5 bar (pump is located at higher level)

Static Pressure required for High Zone Installation (from pump to the lowest sprinkler of the zone)
= 32.45- 12.25 = 20.2m ~ 2.1 bar

Pump head @low flow = value of table 16 + static pressure + friction loss (before control valve) + friction loss (after control valve)

Pump head @high flow = value of table 16 + static pressure + friction loss (before control valve) + friction loss (after control valve)

Pump head @nominal flow = value of table 16 + static pressure

Low Zone (OH3) High Zone (OH3)


Pump head @low flow 6.2-0.5+0.12+0.53 6.2+2.1+0.12+0.34
= 6.35 bar = 8.76 bar
Pump head @high flow 5.9-0.5+0.17+0.76 5.9+2.1+0.17+0.48
= 6.33 bar = 8.65 bar
Pump head @nominal flow 2.5-0.5 2.5+2.1
= 2.0 bar = 4.6 bar

Design Pump Duty for Sprinkler Pump (North Tower) - SP-NT-01 & 02
Low Zone (OH3) High Zone (OH3)
Low flow 7.0 bar @ 1100 L/min 9.6 bar @ 1100 L/min
High flow 6.7 bar @ 1350 L/min 9.3 bar @ 1350 L/min
Nominal flow 3.3 bar @ 3100 L/min 5.9 bar @ 3100 L/min

Calculation of Sprinkler Jockey Pump - Low Zone (North Tower) - SJP-NT-01


Required pump Head = Low Zone Running pressure of Sprinkle Pump +1 bar allowance for cut-in/cut-out
=7+1
= 8 bar

Pump Duty for F.S Jockey Pump (South Tower) - SJP-NT-01:


8 Bar @50 l/min

Calculation of Sprinkler Jockey Pump - High Zone (North Tower) - SJP-NT-02


Required pump Head = High Zone Running pressure of Sprinkle Pump +1 bar allowance for cut-in/cut-out
= 9.6 + 1
= 10.6 bar

Pump Duty for F.S Jockey Pump (South Tower) - SJP-NT-02:


10.6 Bar @50 l/min

16
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Calculation of sprinkler pump (South Tower - OH3) - SP-ST-01 & 02


Equivalent length of fittings and valves:
According to LPC rules (BS EN 12845) table 16, the flow and pressure requirement are as following:
Low Zone (OH3) High Zone (OH3) Low Zone (OH3) High Zone (OH3)
Low flow 6.2bar @ 1100 L/min 6.2bar @ 1100 L/min 150mm elbow (4.3m) 12Nos = 51.6m 12Nos = 51.6m
High flow 5.9bar @ 1350 L/min 5.9bar @ 1350 L/min 150mm butterfly valve (6.4m) 1Nos = 6.4m 1Nos = 6.4m
Nominal flow 2.5bar @ 3100 L/min 2.5bar @ 3100 L/min 150mm check valve (35m) 1Nos = 35m 1Nos = 35m
150mm tee (8.6m) 4Nos = 34.4m 3Nos = 25.8m
Total = 127.4m 118.8m
Frictional loss from pump to control valve : Low Zone (OH3) High Zone (OH3)
100mm elbow (3m) 1Nos = 3m 1Nos = 3m
150mm Pipe length: 100mm butterfly valve (4.6m) 1Nos = 4.6m 1Nos = 4.6m
Low Zone (OH3) High Zone (OH3) 100mm tee (6.1m) 2Nos = 12.2m 1Nos = 6.1m
150mm pipe = 53m 53m Total = 19.8m 13.7m
Equivalent length of fittings and valves: Total Equivalent length:
Low Zone (OH3) High Zone (OH3) Low Zone (OH3) High Zone (OH3)
150mm elbow (4.3m) 8Nos = 34.4m 8Nos = 34.4m 150mm pipe = 232.4m 238.8m
150mm butterfly valve (6.4m) 1Nos = 6.4m 1Nos = 6.4m 100mm pipe = 53.8m 18.7m
150mm check valve (35m) 1Nos = 35m 1Nos = 35m
150mm tee (8.6m) 1Nos =8.6m 1Nos = 8.6m
Total = 84.4m 84.4m Pipe friction loss: Friction loss of 150mm pipe
Total Equivalent length: Low Zone (OH3) High Zone (OH3)
At low flow (1100L/min), At low flow (1100L/min),
Low Zone (OH3) High Zone (OH3)
Friction loss of 150mm pipe = Friction loss of 150mm pipe =
150mm pipe = 137.4m 137.4m
6.05 × 10 5 1.85 6.05 × 10 5
P= 1.85 4.87
× 232.4 × 1100 P= 1.85 4.87
× 238.8 × 11001.85
120 × 150 120 × 150
The frictional loss due to water flow is calculated using Hazen-William formula = 0.22 bar = 0.22 bar
5
6.05 × 10
P= 1.85 4.87
× L × Q1.85 At high flow (1350L/min), At high flow (1350L/min),
C ×d Friction loss of 150mm pipe = Friction loss of 150mm pipe =
Low Zone (OH3) High Zone (OH3) 6.05 × 10 5 6.05 × 10 5
1.85
At low flow (1100L/min), At low flow (1100L/min), P= 1.85 4.87
× 232 . 4 × 1350 P = 1.85 4.87
× 238.8 × 13501.85
Friction loss of 150mm pipe = Friction loss of 150mm pipe = 120 × 150 120 × 150
= 0.32 bar = 0.32 bar
6.05 × 10 5 1.85 6.05 × 10 5
P= × 137 . 4 × 1100 P = × 137.4 × 11001.85 Friction loss of 100mm pipe
1201.85 × 150 4.87 1201.85 × 150 4.87
= 0.13 bar = 0.13 bar Low Zone (OH3) High Zone (OH3)
At low flow (1100L/min), At low flow (1100L/min),
At high flow (1350L/min), At high flow (1350L/min), Friction loss of 150mm pipe = Friction loss of 150mm pipe =
Friction loss of 150mm pipe = Friction loss of 150mm pipe = 6.05 × 10 5 1.85 6.05 × 10 5
P= × 53 . 8 × 1100 P = × 18.7 × 11001.85
6.05 × 10 5 1.85 6.05 × 10 5 1201.85 × 100 4.87 1201.85 × 100 4.87
P= × 137 . 4 × 1350 P = × 137.4 × 13501.85
1.85
120 × 150 4.87 1.85
120 × 150 4.87 = 0.36 bar = 0.13 bar
= 0.19 bar = 0.19 bar
At high flow (1350L/min), At high flow (1350L/min),
Friction loss of 150mm pipe = Friction loss of 150mm pipe =
Frictional loss from control valve to design point : 6.05 × 10 5 1.85 6.05 × 10 5
P= 1.85 4.87
× 53 . 8 × 1350 P = 1.85 4.87
× 18.7 × 13501.85
Pipe length (from control valve to design point): 120 × 100 120 × 100
Low Zone (OH3) High Zone (OH3) = 0.52 bar = 0.18 bar
150mm pipe = 105m 120m Friction loss (after control valve)
100mm pipe = 34m 5m Low Zone (OH3) High Zone (OH3)
1100L/min flow 0.22+0.36 = 0.58 bar 0.22+0.13 = 0.35 bar
1350L/min flow 0.32+0.52 = 0.84 bar 0.32+0.18 = 0.5 bar

17
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Static Pressure required for Low Zone Installation (from pump to the sprinkler control valve set)
= 6.75 - 2.7 = 4.05 m ~ 0.4 bar

Static Pressure required for High Zone Installation (from pump to the lowest sprinkler of zone)
= 40.45 - 2.7 = 37.8m ~ 3.8 bar

Pump head @low flow = value of table 16 + static pressure + friction loss (before control valve) + friction loss (after control valve)

Pump head @high flow = value of table 16 + static pressure + friction loss (before control valve) + friction loss (after control valve)

Pump head @nominal flow = value of table 16 + static pressure


Low Zone (OH3) High Zone (OH3)
Pump head @low flow 6.2+0.4+0.13+0.58 6.2+3.8+0.13+0.35
= 7.31 bar = 10.48 bar
Pump head @high flow 5.9+0.4+0.19+0.84 5.9+3.8+0.19+0.5
= 7.33 bar = 10.39 bar
Pump head @nominal flow 2.5+0.4 2.5+3.8
= 2.9 bar = 6.3 bar

Design Pump Duty for Sprinkler Pump (South Tower - OH3) - SP-ST-01 & 02
Low Zone (OH3) High Zone (OH3)
Low flow 7.8 bar @ 1100 L/min 11.1 bar @ 1100 L/min
High flow 7.5 bar @ 1350 L/min 10.8 bar @ 1350 L/min
Nominal flow 4.1 bar @ 3100 L/min 7.4 bar @ 3100 L/min

Calculation of Sprinkler Jockey Pump - Low Zone (South Tower) - SJP-ST-01


Required pump Head = Low Zone Running pressure of Sprinkle Pump +1 bar allowance for cut-in/cut-out
= 7.8 + 1
= 8.8 bar

Pump Duty for F.S Jockey Pump (South Tower) - SJP-ST-01:


8.8 Bar @50 l/min

Calculation of Sprinkler Jockey Pump - High Zone (South Tower) - SJP-ST-02


Required pump Head = High Zone Running pressure of Sprinkle Pump +1 bar allowance for cut-in/cut-out
= 11.1 + 1
= 12.1 bar

Pump Duty for F.S Jockey Pump (South Tower) - SJP-ST-02:


12.1 Bar @50 l/min

18
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Calculation of sprinkler pump (South Tower - OH4) - SP-ST-03 & 04


Equivalent length of fittings and valves:
According to LPC rules (BS EN 12845) table 16, the flow and pressure requirement are as following:
Low Zone (OH4) Low Zone (OH4)
Low flow 3.5 bar @ 1800 L/min 150mm elbow (4.3m) 3Nos = 12.9m
High flow 3.0 bar @ 2100 L/min 150mm butterfly valve (6.4m) 1Nos = 6.4m
Nominal flow 1.9 bar @ 2650 L/min 150mm check valve (35m) 1Nos = 35m
Total = 54.3m
Low Zone (OH4)
Frictional loss from pump to control valve : 100mm elbow (3m) 1Nos = 3m
100mm butterfly valve (4.6m) 1Nos = 4.6m
150mm Pipe length: Total = 7.6m
Low Zone (OH4) Total Equivalent length:
150mm pipe = 53m
Low Zone (OH4)
Equivalent length of fittings and valves: 150mm pipe = 74.3m
Low Zone (OH4) 100mm pipe = 17.6 m
150mm elbow (4.3m) 8Nos = 34.4m
150mm butterfly valve (6.4m) 1Nos = 6.4m
150mm check valve (35m) 1Nos = 35m Pipe friction loss: Friction loss of 150mm pipe
150mm tee (8.6m) 1Nos =8.6m Low Zone (OH4)
Total = 84.4m At low flow (1800L/min),
Total Equivalent length: Friction loss of 150mm pipe =
Low Zone (OH4) 6.05 × 10 5
P= 1.85 4.87
× 74.3 × 18001.85
150mm pipe = 137.4m 120 × 150
= 0.17 bar
The frictional loss due to water flow is calculated using Hazen-William formula At high flow (2100L/min),
6.05 × 10 5 Friction loss of 150mm pipe =
P= 1.85 4.87
× L × Q1.85 6.05 × 10 5
C ×d P= 1.85 4.87
× 74.3 × 21001.85
Low Zone (OH4) 120 × 150
At low flow (1800L/min), = 0.23 bar
Friction loss of 150mm pipe = Friction loss of 100mm pipe
6.05 × 10 5 Low Zone (OH4)
P= × 137.4 × 18001.85 At low flow (1800L/min),
1201.85 × 150 4.87
= 0.32 bar Friction loss of 150mm pipe =
6.05 × 10 5
At high flow (2100L/min), P= × 17.6 × 18001.85
1201.85 × 100 4.87
Friction loss of 150mm pipe =
= 0.29 bar
6.05 × 10 5
P= 1.85 4.87
× 137.4 × 21001.85 At high flow (2100L/min),
120 × 150
= 0.42 bar Friction loss of 150mm pipe =
6.05 × 10 5
P= 1.85 4.87
× 17.6 × 21001.85
Frictional loss from control valve to design point :
120 × 100
= 0.39 bar
Pipe length (from control valve to design point): Friction loss (after control valve)
Low Zone (OH4) Low Zone (OH4)
150mm pipe = 20m 1800L/min flow 0.17+0.29 = 0.46 bar
100mm pipe = 10m 2100L/min flow 0.23+0.39 = 0.62 bar

19
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Static Pressure required for Low Zone Installation (from pump to the sprinkler control valve set)
= 6.75 - 2.7 = 4.05 m ~ 0.4 bar

Pump head @low flow = value of table 16 + static pressure + friction loss (before control valve) + friction loss (after control valve)

Pump head @high flow = value of table 16 + static pressure + friction loss (before control valve) + friction loss (after control valve)

Pump head @nominal flow = value of table 16 + static pressure


Low Zone (OH4)
Pump head @low flow 3.5+0.4+0.32+0.46
= 4.68 bar
Pump head @high flow 3.0+0.4+0.42+0.62
= 4.44 bar
Pump head @nominal flow 1.9+0.35
= 2.3 bar

Design Pump Duty for Sprinkler Pump (South Tower - OH4) - SP-ST-03 & 04
Low Zone (OH4)
Low flow 5.2 bar @ 1800 L/min
High flow 4.7 bar @ 2100 L/min
Nominal flow 3.6 bar @ 2650 L/min

Calculation of Sprinkler Jockey Pump (South Tower - OH4) - SJP-ST-03


Required pump Head = Low Zone Running pressure of Sprinkle Pump +1 bar allowance for cut-in/cut-out
= 5.2 + 1
= 6.2 bar

Pump Duty for F.S Jockey Pump (South Tower) - SJP-ST-01:


6.2 Bar @50 l/min

20
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX B

Schedule of Major Materials and Equipment

21
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

MAJOR EQUIPMENT OF FIRE SERVICES

PUMP HEAD FLOW RATE MOTOR MOTOR


DESIGNATION LOCATION PUMP TYPE
(Bar) (L/MIN) SPEED (RPM) RATING (KW)
NORTH TOWER

FP-NT-01 &
1/F FIXED FIRE PUMP (DUTY & STANDBY) 12.0 900 2900 45 HORIZONTAL END-SUCTION,CENTRIFUGAL
FP-NT-02
FJP-NT-01 1/F F.S. JOCKEY PUMP 13.0 60 2900 5 VERTICAL MULTI-STAGE,CENTRIFUGAL
FIP-NT-01 &
1/F F.S. INTERMEDIATE BOOSTER PUMP (DUTY & STANDBY) 5.0 1800 2900 37 HORIZONTAL END-SUCTION,CENTRIFUGAL
FIP-NT-02
1ST 2ND 1ST 2ND
SPRINKLER PUMP (OH3) (DUTY & STANDBY)
SP-NT-01 & 7.0 9.6 1100 1100 HORIZONTAL END-SUCTION MULTI-STAGE,CENTRIFUGAL
1/F ALSO SERVE AS SPRINKLER INTERMEDIATE BOOSTER 2900 90
SP-NT-02 6.7 9.3 1350 1350 TWO (2) OUTLETS
PUMP
3.3 5.9 3100 3100

SJP-NT-01 1/F SPRINKLER JOCKEY PUMP (OH3 - LOW ZONE) 8.0 50 2900 3 VERTICAL MULTI-STAGE,CENTRIFUGAL

SJP-NT-02 1/F SPRINKLER JOCKEY PUMP (OH3 - HIGH ZONE) 10.6 50 2900 4 VERTICAL MULTI-STAGE,CENTRIFUGAL
SOUTH TOWER
FP-ST-01 &
FIXED FIRE PUMP (DUTY & STANDBY) 13.5 900 2900 45 HORIZONTAL END-SUCTION,CENTRIFUGAL
FP-ST-02 B2/F
FJP-ST-01 B2/F F.S. JOCKEY PUMP 14.5 60 2900 5 VERTICAL MULTI-STAGE,CENTRIFUGAL
FIP-ST-01 &
B2/F F.S. INTERMEDIATE BOOSTER PUMP (DUTY & STANDBY) 6.5 1800 2900 45 HORIZONTAL END-SUCTION,CENTRIFUGAL
FIP-ST-02
1ST 2ND 1ST 2ND
SPRINKLER PUMP (OH3) (DUTY & STANDBY)
SP-ST-01 & 7.8 11.1 1100 1100 HORIZONTAL END-SUCTION MULTI-STAGE,CENTRIFUGAL
B1/F ALSO SERVE AS SPRINKLER INTERMEDIATE BOOSTER 2900 90
SP-ST-02 7.5 10.8 1350 1350 TWO (2) OUTLETS
PUMP
4.1 7.4 3100 3100
5.2 1800
SP-ST-03 &
B1/F SPRINKLER PUMP (OH4) (DUTY & STANDBY) 4.7 2100 2900 45 HORIZONTAL END-SUCTION,CENTRIFUGAL
SP-ST-04
3.6 2650
SJP-ST-01 B1/F SPRINKLER JOCKEY PUMP (OH3 - LOW ZONE) 8.8 50 2900 4 VERTICAL MULTI-STAGE,CENTRIFUGAL
SJP-ST-02 B1/F SPRINKLER JOCKEY PUMP (OH3 - HIGH ZONE) 12.1 50 2900 4 VERTICAL MULTI-STAGE,CENTRIFUGAL
SJP-ST-03 B1/F SPRINKLER JOCKEY PUMP (OH4) 6.2 50 2900 3 VERTICAL MULTI-STAGE,CENTRIFUGAL

22
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX C

Schedule of statutory submission

23
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

No. Inspection/ Submission Scheduled Date Actual Date No. Inspection/ Submission Scheduled Date Actual Date
DG Submission FSD Related
F1 DG (FSD) Submission 3/2018 F26 Form FS314 Submission 5/2018
F2 DG submission for fuel tank room 3/2018 F27 Form FS15A (Ess. Load calculation) 5/2018
F3 Ventilation Submission for DG Stores 3/2018 F28 Form FS501 Submission 5/2018
F4 (FSD) DG Inspection 4/2018 F29 FS Inspection 6/2018
WSD related F30 Fire Certificate (FS 172) Obtained 6/2018
F5 Form WWO132 –Availability (FS) 9/2015 9/2015
F6 Form WWO132 – request of connection 8/2016
F7 Form WWO542 (FS Installation) 8/2016
F8 FS VPLD 1st Submission 8/2016
F9 FS Form WWO46 (Part I-III) 8/2016
HBP 1 submission for application of Help
F10 Business Program (water connection) 8/2016
F11 FS VPLD 2nd Submission 2/2017
F12 FS Installation Form WWO46 (Part IV) 9/2017
F13 WSD Inspection for FS 3/2018
F14 Issuance of WSD Certificate 4/2018
F15 EMSD (Lift& Escalator) related
FSD Related
F16 AVAS Zoning Plan Submission late 2016
F17 AVAS Zoning Plan approval late 2017
Application for exemption of sprinkler in raised
F18 floor 9/2016
F19 Approval on exemption of sprinkler in raised floor early 2017
Application for exemption of sprinkler under
canopies, covered walkways and architectural
F20 features, etc 9/2016
F21 Approval on exemption of sprinkler early 2017
F22 VAC Plans Submission to FSD 3/2018
F23 Form FS314 submission 3/2018
F24 AFA Direct Link Application 3/2018
F25 Final GBP Submission to FSD 4/2018

24
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX D

List of recommended spare parts and components

25
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

The Sub-Contractor shall provide spare parts and special tools including the ones listed in the following and any further parts or tools which may be required for operation and maintenance of the
complete fire services installation up to the end of the Defects Liability Period. A cabinet or metal box shall be provided by the Sub-Contractor to house all the spare parts and tools.

Spare parts and components Number


1. Manual call points (weatherproof/ non-weatherproof types) Two (2) / five (5) nos. for each manual fire alarm system
2. Glasses and test-tools for manual call point Five (5) nos. for each FH/HR system
3. Indicator lamps and light bulb Twenty-five (5) nos. for each type for each tower
4. Fuses for each control/indication panel Five (5) nos. for each type for each tower
5. Fuses for each motor control cubicle Two (2) set for each type for each tower
6. Pressure gauges Four (4) nos. for each fixed installation using water
7. Keys for panel/cubicle housing, four (4) sets. Four (4) sets for each tower
8. Sprinklers Each type, twenty-four (24) nos. for each sprinkler system
9. Sprinkler spanners Two (2) nos. for each sprinkler system
10. Sprinkler guards Ten (10) nos. for each sprinkler system
11. Metal strikers for hose reel nozzle box Five (5) nos. for each FH/HR system
12. Glasses for hose reel nozzle box Five (5) nos. for each FH/HR system
13. Hose reel nozzles Five (5) nos. for each FH/HR system
14. Alarm bells, 150mm diameter (non-weatherproof type) / 230mm diameter (weatherproof type) Two (2) / five (5) nos. for each manual fire alarm system
15. Flashing red lights, (non-weatherproof type) / (weatherproof type) Two (2) / four (4) nos. for each manual fire alarm system
16. Multi-sensors detectors (as smoke detector) Two (2) nos. for each automatic fire detection system
17. Heat detectors Four (4) nos. for each automatic fire detection system
18. Valve packing Two (2) nos. for each type per each fixed installation using water
19. Detector testing kit One (1) no. for each automatic fire detection system
20. Flashing light of directional sign Five (5) nos. for each AVAS system
21. Directional Sign Signage Five (5) nos. for each AVAS system

26
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX E

Fire Services Notes

27
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

FIRE SERVICES NOTES :


1.5 PRE-ACTION SPRINKLER INSTALLATION SHALL BE PROVIDED TO THE FOLLOWING AREAS:
1. AUTOMATIC SPRINKLER SYSTEM
I.) BUILDING MANAGEMENT OFFICES, CONTROL ROOM, RACK ROOM ON BOTH TOWERS' G/F
1.1 INDEPENDENT AUTOMATIC SPRINKLER SYSTEMS SHALL BE PROVIDED TO I.) NORTH TOWER AND (WHERE CONTROL/MONITORING EQUIPMENT AND IMPORTANT DOCUMENTS ARE STORED
BASEMENT FLOORS & II.) SOUTH TOWER EXCEPT THE FOLLOWING AREAS: INSIDE);
II.) TCD - MONITOR ROOM ON SOUTH TOWER 15/F (WHERE MONITORING EQUIPMENT ARE
I.) CANOPIES WITH NO GOODS STORED UNDER CANOPIES; STORED INSIDE);
II.) ELECTRICAL/MECHANICAL PLANT ROOMS, FIRE CONTROL CENTRE, MASTER WATER METER III) TRAFFIC MANAGEMENT AND INFORMATION CENTRE (TMIC) - CONTROL ROOM ON SOUTH
ROOM, LIFT MACHINE ROOMS; TOWER 15/F;
III.) ELV/TEL ROOMS, TEL EQUIPMENT ROOMS, TBE ROOMS & PABX ROOMS; IV.) TIMS - VIEWING GALLERY + HIGH COMMAND ROOM ON SOUTH TOWER 16/F;
IV.) SERVER ROOMS, NETWORK ROOMS & NETWORK DISTRIBUTION ROOMS; V.) TMIC - ICCR ON SOUTH TOWER 15/F
V.) ELECTRICAL & MECHANICAL DUCTS/SHAFTS/RISERS/CABINETS, WATER METER CABINETS & VI.) TMIC - STORE & TESTING ROOM ON SOUTH TOWER 15/F (WHERE IMPORTANT DOCUMENTS
INACCESSIBLE VOIDS; AND TESTING EQUIPMENT ARE STORED INSIDE);
VI.) ARCHITECTURAL FEATURES.
1.6 SPRINKLER CONTROL VALVES AND SPRINKLER INLETS SHALL BE INSTALLED ON G/F AT THE
1.2 THE SPRINKLER SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE LOSS PREVENTION LOCATION AS SHOWN ON PLANS.
COUNCIL (LPC) RULES FOR SPRINKLER INSTALLATIONS INCORPORATING WITH BS
EN 12845: 2003 AND FSD CIRCULAR LETTER 3/2006 & 3/2012. 1.7 FLOW SWITCHES SHALL BE INSTALLED TO INDICATE AT THE FIRE ALARM PANEL, THE FLOOR OR
AREA UPON WHICH SPRINKLER IS OPERATING.
I.) FOR NORTH TOWER AND BASEMENT FLOORS, THE SPRINKLER SYSTEM SHALL CONFORM TO
OH3. 1.8 FAST RESPONSE SPRINKLER HEADS TO BE PROVIDED FOR THE ENTIRE BASEMENT AREA AND
ASSOCIATED STAIRCASES LEADING TO G/F.
II.) FOR SOUTH TOWER, THE SPRINKLER SYSTEM SHALL CONFORM TO OH3 AND OH4. THE OH3
INSTALLATION SHALL PROTECT THE ENTIRE TOWER AREA EXCEPT THE ART GALLERY AREA ON 2. FH/HR SYSTEM
G/F. THE OH4 INSTALLATION SHALL PROTECT THE ART GALLERY AREA ON G/F FLOOR ONLY.
2.1 INDEPENDENT FH/HR SYSTEMS SHALL BE PROVIDED TO I.) NORTH TOWER AND BASEMENT
1.3 THE FOLLOWING SPRINKLER TANKS SHALL BE PROVIDED AS SHOWN ON PLANS FLOORS & II.) SOUTH TOWER. EACH SYSTEM SHALL BE PROVIDED WITH A 36 M³
FH/HR TANK AS SHOWN ON THE PLANS IN ACCORDANCE WITH THE CODES OF PRACTICE FOR
I.) FOR NORTH TOWER AND BASEMENT FLOORS SYSTEM, A 124 M³ SPRINKLER TANK SHALL BE MINIMUM F.S. INSTALLATIONS AND EQUIPMENT, APRIL 2012 EDITION AND FSD
PROVIDED CIRCULAR LETTER NO.2/2013.

II.) FOR SOUTH TOWER SYSTEM, A 134 M³ SPRINKLER TANK SHALL BE PROVIDED 2.2 INDEPENDENT FH/HR PUMP SETS (ONE DUTY AND ONE STANDBY) AND F.S. JOCKEY PUMP SHALL
BE PROVIDED IN THE DESIGNATED FH/HR PUMP ROOMS AS SHOWN ON PLANS. INDEPENDENT
1.4 INDEPENDENT SPRINKLER PUMP SETS (ONE DUTY AND ONE STANDBY) AND SPRINKLER JOCKEY INTERMEDIATE BOOSTER PUMP SETS (ONE DUTY AND ONE STANDBY) SHALL ALSO BE
PUMP(S) SHALL BE INSTALLED IN THE DESIGNATED SPRINKLER PUMP ROOM AS SHOWN ON PROVIDED IN ITS RESPECTIVE PUMP ROOM.
PLANS. THE SPRINKLER PUMP SET SHALL ALSO SERVE AS INTERMEDIATE BOOSTER PUMP.
28
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

BS 5839 : PART 1, AND DESIGN MANUAL: BARRIER FREE ACCESS (2008).


2.3 UPON ACTIVATION OF ANY MANUAL CALL POINT IN ANY AREA, THE DESIGNATED FH/HR PUMP
SERVING THAT AREA SHALL OPERATE. 3.5 UPON ACTIVATION OF ANY MANUAL CALL POINT, THE ALARM BELLS AND FLASHING RED LIGHTS
OF THE DESIGNATED SYSTEM SHALL SOUND AND FLASH RESPECTIVELY.
2.4 FIRE HYDRANTS SHALL BE PROVIDED IN ALL REQUIRED STAIRCASE ENCLOSURES. HOSE REELS
SHALL BE PROVIDED TO ENSURE THAT EVERY PART OF THE BUILDING CAN 3.6 I.) FOR NORTH TOWER AND BASEMENT FLOORS SYSTEM, THE FIRE ALARM PANEL SHALL BE
BE REACHED BY A LENGTH OF NOT MORE THAN 30M HOSE REEL TUBING. PROVIDED IN THE DESIGNATED FIRE CONTROL CENTRE IN NORTH TOWER ON G/F. THIS
PANEL SHALL BE CONNECTED TO THE FIRE SERVICES COMMUNICATION CENTRE (FSCC) BY A
2.5 FIRE HYDRANTS, HOSE REELS AND F.S. INLETS SHALL BE PROVIDED AT THE LOCATION AS DIRECT TELEPHONE LINK FOR TRANSMISSION OF THE COMMON FIRE ALARM SIGNAL FROM
SHOWN ON PLANS. AT EACH HYDRANT POINT, A SINGLE OUTLET FIRE HYDRANT SHALL BE MANUAL FIRE ALARM SYSTEM, FIRE DETECTION SYSTEM AND FLOW SWITCH OF SPRINKLER
INSTALLED. SYSTEM.

3. FIRE DETECTION AND ALARM SYSTEM REPEATER PANELS SHALL BE PROVIDED IN THE DESIGNATED BUILDING MANAGEMENT OFFICE
AS SHOWN ON PLAN. ALL SIGNAL FROM THE FIRE ALARM PANEL SHALL BE REPEATED.
3.1 INDEPENDENT FIRE DETECTION AND MANUAL FIRE ALARM SYSTEMS SHALL BE PROVIDED TO
I.) NORTH TOWER AND BASEMENT FLOORS & II.) FOR SOUTH TOWER SYSTEM, THE FIRE ALARM PANEL SHALL BE PROVIDED IN THE
II.) SOUTH TOWER. DESIGNATED FIRE CONTROL CENTRE IN SOUTH TOWER ON G/F. THIS PANEL SHALL BE
EACH SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE BS 5839: PART 1 : 2002 + A2 : CONNECTED TO THE FSCC BY A DIRECT TELEPHONE LINK FOR TRANSMISSION OF THE COMMON
2008, FSD CIRCULAR LETTER NO : 1/2009, 3/2010 AND LPC RULES FOR AUTOMATIC FIRE ALARM FIRE ALARM SIGNAL FROM MANUAL FIRE ALARM SYSTEM, FIRE DETECTION SYSTEM AND
INSTALLATIONS. FLOW SWITCH OF SPRINKLER SYSTEM.

3.2 I.) FOR THE NORTH TOWER AND BASEMENT FLOORS SYSTEM, FIRE DETECTORS SHALL BE REPEATER PANELS SHALL BE PROVIDED IN THE DESIGNATED BUILDING MANAGEMENT OFFICE
INSTALLED IN THE ENTIRE BASEMENT AREA, ELECTRICAL/MECHANICAL PLANT ROOMS, FIRE AS SHOWN ON PLAN. ALL SIGNALS FROM THE FIRE ALARM PANEL SHALL BE REPEATED.
CONTROL CENTRE, MASTER METER ROOM, WATER METER ROOMS EXCEPT CARPARK AREA AND
ELECTRICAL/MECHANICAL DUCTS/SHAFTS/RISERS/CABINETS. 4. AUDIO/VISUAL ADVISORY SYSTEM

II.) FOR THE SOUTH TOWER SYSTEM, FIRE DETECTORS SHALL BE INSTALLED IN AUDIO/VISUAL ADVISORY SYSTEM SHALL BE PROVIDED IN THE PUBLIC AREA ON BASEMENT 2
ELECTRICAL/MECHANICAL PLANT ROOMS, FIRE CONTROL CENTRE, WATER METER ROOMS FLOOR AND SOUTH TOWER 1/F & 2/F.
EXCEPT ELECTRICAL/MECHANICAL DUCTS/SHAFTS/RISERS/CABINETS.
NO AUDIO/VISUAL ADVISORY SYSTEM SHALL BE PROVIDED TO OTHER FLOORS DUE TO THE
3.3 ONE MANUAL FIRE ALARM ACTUATING POINT AND ONE AUDIO WARNING DEVICE SHALL BE FOLLOWINGS:
LOCATED AT EACH HOSE REEL POINT. THE ACTUATING POINT SHALL INCLUDE FACILITIES I.) THE CARPARK AREA ON BASEMENT 1 FLOOR DO NOT EXCEED 2000 M SQ.
FOR FIRE PUMP START AND AUDIO/VISUAL WARNING DEVICE INITIATION. EACH ACTUATING II.) THE PUBLIC AREA ON GROUND FLOOR WITHIN EACH TOWER DO NOT EXCEED 2000 M SQ.
POINT SHALL ONLY OPERATE ITS DESIGNATED SYSTEM. III.) THE OFFICE FLOORS ARE NOT ACCESSIBLE TO VISITORS.

3.4 VISUAL FIRE ALARM IN FORM OF FLASHING RED LIGHTS SHALL BE PROVIDED IN AREAS
ACCESSIBLE BY THE PUBLIC IN ACCORDANCE WITH FSD CIRCULAR LETTER 2/2012.
29
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

5. GASEOUS FIRE EXTINGUISHING SYSTEM


7. FIREMAN'S LIFT
NOVEC1230 TOTAL FLOODING GASEOUS EXTINGUISHING SYSTEM SHALL BE PROVIDED IN
ACCORDANCE WITH NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEM ALL LIFT MARKED "A" SHALL BE ASSIGNED AS FIREMAN'S LIFTS. A PROTECTED LOBBY SHALL
FOR THE FOLLOWING AREAS WHERE THE ROOM VOLUME EXCEEDS 42 M³. BE PROVIDED FOR EACH LANDING OF THE FIREMAN'S LIFT.

SOUTH TOWER: 8. DIRECTIONAL AND EXIT SIGN


I.) T.B.E. ROOM ON G/F
II.) CENTRALIZED SERVER ROOM ON SOUTH 6/F; SUFFICIENT DIRECTIONAL AND EXIT SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH FSD
III.) COMPUTER ROOM 2 & 3 ON 7/F CIRCULAR LETTER NO : 5/2008 TO ENSURE THAT ALL EXIT ROUTES ARE CLEARLY INDICATED
IV.) EXPENSIVE SURVEY EQUIPMENT STORE 1 & 2 ON 7/F AS REQUIRED BY THE CONFIGURATION OF STAIRCASES AS SHOWN ON PLANS.
V.) MEET ME ROOM (MMR) & NETWORK ROOM (NR) ON 6/F & 11/F
VI.) SERVER ROOM & LAN SERVER ROOM ON 9/F 9. EMERGENCY LIGHTING
VII.) OA SERVER ROOM ON 13/F
VIII.) TIS SYSTEM CENTRE ON 13/F EMERGENCY LIGHTING SHALL BE PROVIDED THROUGHOUT THE ENTIRE BUILDING AND ALL
IX.) TTSD- IT LAB ON 13/F EXIT ROUTES LEADING TO GROUND LEVEL IN COMPLIANCE WITH BS 5266:PART 1: 2011 AND BS
X.) PARKING METER MANAGEMENT COMPUTER ROOM ON 14/F EN 1838: 2013.
XI.) UPS & BATTERY ROOM ON 15/F
XII.) TCD - EQUIPMENT ROOM ON 15/F THE EMERGENCY LIGHTING SHALL BE BACKED UP BY THE CENTRAL BATTERY SYSTEM.
XIII.) TMIC - EQUIPMENT ROOM ON 15/F
XIV.) TMIC - UPS ROOM ON R/F 10. CENTRAL BATTERY SYSTEM

NORTH TOWER: THE CENTRAL BATTERY SYSTEM SHALL BE PROVIDED INSIDE THE CBS ROOM AND THE
I.) MEET ME ROOM (MMR) & NETWORK ROOM (NR) ON 5/F & 10/F BATTERIES OF THE SYSTEM SHALL BE OF VALVE REGULATED SEALED TYPE CELLS
COMPLYING TO EN 60896-2 WITH CAPACITY NOT EXCEEDING 400 AMPERE-HOURS. AS NO
6. PORTABLE FIRE EXTINGUISHER FLAMMABLE GAS WILL BE EMITTED, GAS EXTRACTION SYSTEM IS NOT REQUIRED FOR THIS
ROOM.
THE APPROPRIATE TYPE WITH REQUIRED CAPACITY PORTABLE FIRE EXTINGUISHERS SHALL BE
PROVIDED AT THE LOCATIONS AS SHOWN ON PLANS. 11. EMERGENCY GENERATOR

NOVEC1230 FIXED SPRAYER UNIT SHALL BE PROVIDED FOR THE FOLLOWING AREAS WHERE INDEPENDENT EMERGENCY GENERATORS OF SUFFICIENT ELECTRICAL CAPACITY SHALL BE
THE ROOM VOLUME IS BELOW 42 M³. PROVIDED TO MEET THE ESSENTIAL SERVICES AS REQUIRED FOR THE FOLLOWING AREAS:
I.) SERVER ROOMS
II.) NETWORK DISTRIBUTION ROOMS I.) NORTH TOWER AND BASEMENT FLOORS;
III.) D.G. STORE II.) SOUTH TOWER.
IV.) FUEL TANK ROOM
V.) PABX ROOM
30
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

12. FUEL TANK ROOM FOR GENERATOR ROOM PER BS 476 : PART 7 OR ITS INTERNATIONAL EQUIVALENT, OR BE BROUGHT UP TO THAT
STANDARD BY USE OF AN APPROVED FIRE RETARDANT PRODUCT.
ADEQUATE CAPACITY OF NOVEC1230 FIXED SPRAYER UNIT SHALL BE PROVIDED TO PROTECT
THE FUEL TANK ROOMS OF A VOLUME NOT EXCEEDING 42 M³. EXPLOSION PROOF HEAT 17.2 ALL LININGS FOR ACOUSTIC, THERMAL INSULATION AND DECORATIVE PURPOSES WITHIN
DETECTORS SHALL BE INSTALLED FOR ACTUATION OF ELECTRO-THERMAL LINK OPERATED PROTECTED MEANS OF ESCAPE SHALL BE OF CLASS 1 TO 2 RATE OF SURFACE SPREAD OF
FIRE DAMPERS. FLAME A PER BS 476 : PART 7 OR ITS INTERNATIONAL EQUIVALENT, OR BE BROUGHT UP TO THAT
STANDARD BY USE OF AN APPROVED FIRE RETARDANT PRODUCT.
13. VENTILATION/AIR CONDITIONING CONTROL SYSTEM
18. DANGEROUS GOODS
VENTILATION/AIR CONDITIONING CONTROL SYSTEM(S) SHALL BE PROVIDED TO STOP
MECHANICALLY INDUCED AIR MOVEMENT WITHIN A DESIGNATED FIRE COMPARTMENT(S). ANY INTENDED STORAGE OR USE OF DANGEROUS GOODS AS DEFINED IN CHAPTER 295 OF THE
A MANUAL OVERRIDE CONTROL SWITCH SHALL BE PROVIDED ADJACENT TO EACH TOWER'S LAWS OF HONG KONG SHALL BE NOTIFIED TO THE DIRECTOR OF FIRE SERVICES.
FIRE ALARM PANEL.
19. EMERGENCY VEHICULAR ACCESS (EVA)
14. SMOKE EXTRACTION SYSTEM
THE CONSTRUCTION OF THE NEW EVA COMPLETED WITH THE RELEVANT TYPE EVA SIGNS
NO SMOKE EXTRACTION SYSTEMS SHALL BE PROVIDED TO THE BASEMENT FLOORS BECAUSE SHALL BE CONSTRUCTED IN ACCORDANCE WITH CODE OF PRACTICE FOR FIRE SAFETY IN
OF EITHER OF THE FOLLOWINGS: BUILDINGS 2011 AS SHOWN ON THE EVA PLAN.

I.) THE CARPARK AREA IS SOLELY FOR CAR PARKING PURPOSES; 20. STREET FIRE HYDRANT
II.) THE FIRE COMPARTMENT VOLUME DOES NOT EXCEED 7000 M³.
AN EXISTING FIRE HYDRANT (YELLOW) IS LOCATED ON HOI TING ROAD OUTSIDE OF THE SITE
15. STAIRCASE PRESSURIZATION SYSTEM BOUNDARY AS SHOWN ON PLAN AND IS WITHIN 100M FROM BOTH TOWERS.

NO STAIRCASE PRESSURIZATION SYSTEM SHALL BE PROVIDED FOR THE BASEMENT AS THE 21. TRANSFORMER ROOM
BASEMENT IS NOT OF THREE OR MORE LEVELS.
SILICON FLUID FILLED TRANSFORMER TO BE PROVIDED AT TRANSFORMER ROOM AS
16. FIRE SHUTTER INDICATED ON PLANS.

FIRE SHUTTERS SHALL BE PROVIDED AT THE LOCATIONS AS SHOWN ON THE PLAN. SMOKE 22. ELECTRICAL DOOR LOCKING DEVICE
DETECTORS AND MANUAL CONTROL SWITCHES SHALL BE PROVIDED AT BOTH SIDES AND
ADJACENT TO THE FIRE SHUTTERS. ELECTRICAL DOOR LOCKING DEVICES ARE PROVIDED IN EACH TOWER. THESE LOCKING
DEVICES SHALL BE CAPABLE OF AUTOMATIC RELEASE UPON ACTUATION OF THE TOWER'S
17. LININGS RESPECTIVE FIRE DETECTION SYSTEM OR OPERATION OF THE TOWER'S RESPECTIVE MANUAL
ALARM SYSTEM. UPON POWER FAILURE, THE ELECTRICAL DOOR LOCKING DEVICE SHALL BE
17.1 ALL LININGS FOR ACOUSTIC AND THERMAL INSULATION PURPOSES IN DUCTINGS AND RELEASED AUTOMATICALLY.
CONCEALED LOCATION SHALL BE OF CLASS 1 OR 2 RATE OF SURFACE SPREAD OF FLAME AS
31
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

23. PHASE COMPLETION OF THE DEVELOPMENT

THE DEVELOPMENT WILL BE COMPLETED IN PHASES:


PHASE 1: NORTH TOWER AND BASEMENT FLOORS
PHASE 2: SOUTH TOWER (G/F TO TR/F)

ALL FS PLANT ROOMS, FIRE CONTROL CENTRE FOR PHASE 1 ARE ALL LOCATED IN THE
PHASE 1 AREA.

32
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX F

Location of street fire hydrant

33
4.5kg DB F.A.L.
AT H/L

RAMP DN
CO2F.E.

1 : 20
10.582 S.M.

EXISTING STREET FIRE HYDRANT


17.974 M. < 18 M.
MASTER WATER
S.L.6.850 METER ROOM
FOR F.S. /
F.S. POTABLE WATER
FIRE CONTROL OCTOPUS
4.5kg
CO 2F.E. CONTROL PANEL MACHINE

ADJACENT TO THE WKGO SITE


DB CENTRE H.R. S.L.6.600
S.L.6.850
S-9 S.L.6.850
ADDITIONAL

1:200@A3
DK DK DK
DB ROLLER SHUTTER E.A.L.
AT H/L

150

150

150
300mm SURFACE CHANNEL PLANTER
DN24R S.L.6.850
DK
150
S.L.6.850
W./ 2 NOS DRAINAGE OUTLETS
S.L.6.550
S-8 E.V.A.
(30 TONNE LOADING HARDSTANDING)

150
E.A.L. EXISTING STREET FIRE HYDRANT
AT H/L SPRINKLER F.S. DK 4.5M. MIN. HEADROOM
INLET INLET
(YELLOW) TO BE RELOCATED FOR

FA
CONSTRUCTION OF THE NEW EVA

LL
1:
1100H. SECURITY
C.L.

21
GATE
SHROFF
2/F BUILDING COUNTER
300mm COVER CHANNEL
F.S.A.P. W./ 2 NOS DRAINAGE OUTLETS LINE ABOVE

F.D.
PLANTER

CD
RUN IN/OUT

=9
300mm COVER CHANNEL
W./ 2 NOS DRAINAGE OUTLETS

5.0
7
0M
LAY-BY 2

.
(PUBLIC)
PLANTER
5000 x 3500 x 5100

V7

SMOKE OUTLET
(FOR B2/F)
F.D.
GLASS CANOPY

HO
LAY-BY 1
(PUBLIC)
IT
IN
100mm H. G
RO
5000 x 3500 x 5100

PLANTER CURB
PLANTER GUARD
C.L.
BOOTH AD

PLANTER
TAXI LAY-BY 4 PLANTER

COACH LAY-BY 2
(PUBLIC)
500

FLOOR TYPE
SMOKE VENT
0
x3

(FOR B2/F)
120
500

V8 00
x3
500
x5

300mm COVER CHANNEL x5


FLOOR TYPE 100
100

W./ 2 NOS DRAINAGE OUTLETS SMOKE VENT


TAXI LAY-BY3
(FOR B1/F)
COACH LAY-BY 1
(DH)
TAXI LAY-BY 1
TAXI LAY-BY 2

2/F BUILDING
500 LINE ABOVE
0 x3
500 120
x5 00
100 F.D. x3
F.D. 500
5000 x 3500 x 5100 5000 x 3500 x 5100 x5
100
GLASS CANOPY 2/F BUILDING
ABOVE LINE ABOVE

225mm SURFACE CHANNEL


W./ 2 NOS DRAINAGE OUTLETS
PLANTER
F.L.6.750

S.L.6.700
5m 10m 15m 20m
F.L.6.750 F.L.6.400
225mm SURFACE CHANNEL FALL
W./ 2 NOS DRAINAGE OUTLETS S.L.6.700 S.L.6.350
EXIT ART GALLERY 1/F BUILDING 1 : 21
LINE ABOVE
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX G

Preliminary Schedule of quantity and dimension of all building services plant rooms

35
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

SCHEDULE OF FIRE SERVICES PLANTROOM

PLANTROOM LOCATION AREA HEADROOM REMARK

NORTH TOWER
A 36 m cu. R.C FS Water Tank is provided on 1/F in adjacent area (tank area ~ 33 m sq.)
FH/HR PUMP & BOOSTER PUMP ROOM
1/F 55 m sq. 3.8m
(NORTH TOWER) Equipment:
2 Nos. Fixed Fire Pumps, 2 Nos. Intermediate Booster Pump and 1 Nos. Jockey are provide inside

A 124 m cu. R.C Sprinkler Tank is provided in adjacent area (tank area ~ 65.5 m sq.)

SPRINKLER PUMP ROOM (NORTH TOWER) 1/F 345 m sq. 3.8m


Equipment:
2 Nos. Sprinkler Pumps and 2 Nos. Jockey are provide inside

FIRE CONTROL CENTRE (NORTH TOWER) G/F 12 m sq. 4m Control Console of North Tower AVAS inside
SOUTH TOWER
A 36 m cu. R.C FS Water Tank is provided in adjacent area (tank area ~ 20.2 m sq.)
FH/HR PUMP & BOOSTER PUMP ROOM
B2/F 36 m sq. 3.4m
(SOUTH TOWER) Equipment:
2 Nos. Fixed Fire Pumps, 2 Nos. Intermediate Booster Pump and 1 Nos. Jockey are provide inside
A 134 m cu. R.C Sprinkler Tank is provided in adjacent area (tank area ~ 63 m sq.)

SPRINKLER PUMP ROOM (SOUTH TOWER) B1/F 76.5 m sq. 3.8m


Equipment:
4 Nos. Sprinkler Pumps and 3 Nos. Jockey are provide inside
FIRE CONTROL CENTRE (SOUTH TOWER) G/F 7.5 m sq. 4m Control Console of South Tower AVAS inside

36
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX H

Preliminary Schedule of operation and maintenance requirements and facilities of each equipment

37
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

SCHEDULE OF OPERATION AND MAINTENANCE REQUIREMENT FOR FIRE SERVICES EQUIPMENT

DESIGNATION LOCATION PUMP OPERATION AND MAINTENANCE REQUIREMENT

NORTH TOWER

FP-NT-01 & FP-NT-02 1/F FIXED FIRE PUMP (DUTY & STANDBY) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS

FJP-NT-01 1/F F.S. JOCKEY PUMP WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
F.S. INTERMEDIATE BOOSTER PUMP (DUTY &
FIP-NT-01 & FIP-NT-02 1/F WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
STANDBY)
SPRINKLER PUMP (OH3) (DUTY & STANDBY)
SP-NT-01 & SP-NT-02 1/F ALSO SERVE AS SPRINKLER INTERMEDIATE WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
BOOSTER PUMP
SJP-NT-01 1/F SPRINKLER JOCKEY PUMP (OH3 - LOW ZONE) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
SJP-NT-02 1/F SPRINKLER JOCKEY PUMP (OH3 - HIGH ZONE) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
SOUTH TOWER
FP-ST-01 & FP-ST-02 B2/F FIXED FIRE PUMP (DUTY & STANDBY) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
FJP-ST-01 B2/F F.S. JOCKEY PUMP WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
F.S. INTERMEDIATE BOOSTER PUMP (DUTY &
FIP-ST-01 & FIP-ST-02 B2/F WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
STANDBY)
SPRINKLER PUMP (OH3) (DUTY & STANDBY)
SP-ST-01 & SP-ST-02 B1/F ALSO SERVE AS SPRINKLER INTERMEDIATE WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
BOOSTER PUMP
SP-ST-03 & SP-ST-04 B1/F SPRINKLER PUMP (OH4) (DUTY & STANDBY) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
SJP-ST-01 B1/F SPRINKLER JOCKEY PUMP (OH3 - LOW ZONE) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
SJP-ST-02 B1/F SPRINKLER JOCKEY PUMP (OH3 - HIGH ZONE) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS
SJP-ST-03 B1/F SPRINKLER JOCKEY PUMP (OH4) WORKING CLEARANCE OF 1M WIDE IS PROVIDED ADJACENT TO THE PUMPS

38
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX I

Estimate of maintenance cost

39
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

Estimate of Maintenance Cost for Fire Services Installations 2 Gaseous Extinguisher Systems

Quantity Annual Routine Quarterly / Final Inspection


Item Equipment / System HK$
Inspection Inspection

1 Fire Detection and Alarm System 3 1 80,000.00 Check the electrical components, including cables, detectors, relays, alarm panel and bells,
batteries
Check the automatic / manual release mechanism shall be serviced.
2 Gaseous Extinguisher Systems 3 1 120,000.00
Check the pipes and fittings for leakage and corrosion and repaired or painted as necessary.
Check the valve freedom of operation and nozzles shall be cleaned.
3 Fixed Fire Protection System 3 1 160,000.00 All cyinders containing the chemical extinguishing agents shall be checked to ensure that the contents
are up to specified standard
4 Protable Fire Extinguisher 3 1 20,000.00 Check the warning notice and operation instructions shall be fixed in the proper position
Check the time delay and lock-off devices in correct working condition
Total Amount: 380,000.00 Check the proper function by actuating detectors of two separate zones
Check all ancillary functions of the system

Remarks: The above estimated maintenance cost is only including the works of system functional test 3 Fixed Fire Protection Systems
and visual inspection.
Routine Quarterly Inspection
Description of the Maintenance Service Work for Fire Services Installation
Check the electrical components, including cables, detectors, relays, alarm panel and bells, batteries
1 Fire Detection and Alarm System Check the automatic / manual release mechanism shall be serviced.
Check the valve freedom of operation and nozzles shall be cleaned.
Routine Quarterly / Final Inspection Check the sprinkler heads are maintained in good working condition.
Check the pressure gauages are in good condition and then ensure that correct pressures are maintained
Check the condition of the wiring, controls and indicating equipment of zone circuits are in Alarm test the sprinkler system by opening the test valve and the time taken to sound the alarm gong
good working order noted.
Check the alarm condition of zone will activate the common alarm circuits. Grease the valves, the bearing and other relevant mechanical parts of pumps and motors.
Check the condition of fire alarm direct line. Check the flow switches are good condition and correct funtioning.
Check the common alarm ciruits will result in the starting / stopping of the fire booster pump
Check the detectors at random with at least one unit in each zone
Check the batteries and chargers shall be examined and test to ensure they are in good and
proper serviceable condition.

40
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

3 Fixed Fire Protection Systems (Con't)

Final / Annual Inspection

Check the electrical components, including cables, detectors, relays, alarm panel and bells, batteries
Check the automatic / manual release mechanism shall be serviced.
Check the valve freedom of operation and nozzles shall be cleaned.
Check the sprinkler heads are maintained in good working condition.
Check the pressure gauages are in good condition and then ensure that correct pressures are maintained.
Alarm test the sprinkler system by opening the test valve and the time taken to sound the alarm gong
noted.
Grease the valves, the bearing and other relevant mechanical parts of pumps and motors.
Check the flow switches are good condition and correct funtioning.
Functional test (Flow and pressure test) of hydrant and hosereel system
Check the length of hose are in good condition
Testing the each water supply to the sprinkler installation individually.

4 Portable Fire Extinguisher

Routine Quarterly / Final Inspection

Check the portable fire extinguishers and appliances are in good condition.
Check the all equipment reaching expiry date of service life or not.
Check the fire extinguishers and appliances for leakage and corrosion and repaired or painted as
necessary.

41
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

DESIGN AND CONSTRUCTION FOR

WEST KOWLOON GOVERNMENT OFFICES

APPROVAL IN PRINCIPLE (AIP) SUBMISSION

FOR FIRE SERVICES INSTALLATION

(Ref. : DSF/BS/FS/AIP/001)

APPENDIX J

Compliance Check List of ER/BS05 - Particular Requirements for Fire Service Installation

42
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

APPENDIX J- Compliance Check List of ER/BS05 - Particular Requirements for Fire Service Installation

Compliance (ix) Pressurization of staircases system if required


(Yes/No/
Comment) (x) Audio visual advisory system;
5.1 Scope of Works
A. The fire services works shall include the design, supply, installation, testing, YES (xi) Portable fire extinguishers, fixed sprayer unit and other portable
adjustment, commissioning, and maintenance of all the fire service approved fire fighting appliances;
installation, related fire service installation and related fire service provisions (xii) Provisions for dangerous goods stores and fuel storage rooms;
for the building to the satisfaction of Fire Services Department and this ER.
B. The fire services works shall comply with FS General Specification, the latest YES (xiii) Exit signs and directional signs;
Codes of Practice for Minimum Fire Service Installations and Equipment and
Inspection, Testing and Maintenance of Installations and Equipment (xiv) Emergency lighting and associated battery systems shall be
(hereinafter referred to as the FSDCOP) issued by the Fire Services provided by the Contractor under electrical installation;
Department, Hong Kong (hereinafter referred to as FSD), FSD’s Circular (xv) Emergency generator shall be provided by the Contractor under
Letters and notices, and other requirements of the FSD and the Building emergency generator installation;
Authority. The Contractor shall be responsible for statutory submissions and (xvi) Performance based fire engineering evaluation, studies and
arrangement of fire service inspections to the satisfaction of FSD and any analysis if required for the completion of the installation and for
other relevant statutory authorities.. determining the adequacy of all necessary fire safety provisions
C. The scope of fire service systems to be provided shall comprise, but not YES (both passive and active means) to the satisfaction of the SO. The
limited to, the following: studies should be carried out by the fire engineering specialist
(i) Fire hydrant and hose reel system including manual fire alarm except for (iii) designer under the Building Services Designer;
system and visual fire alarm; & (xvi). (xvii) Pipework and fittings;
(ii) Automatic sprinkler system;
For (iii), (xviii) Fire service inlets;
(iii) Automatic pre-action recycling sprinkler system; Type A
Pre-action (xix) Fire pumps and tanks;
(iv) Clean agent gaseous extinguishing system or other approved sprinkler to
gaseous extinguishing system BS EN 12845 (xx) Fixed automatically operated appliances; and
(v) Fire detection and automatic fire alarm system; shall be used
instead (xxi) All other fire service installations, related fire service installation and
(vi) Ventilation and air-conditioning control; related fire services provisions required by the FSD / Building
For (xvi), Fire Authority and/or stipulated in the Schedule of Accommodation,
(vii) Automatic actuating devices; Engineering is Room Data Sheets, detailed requirements and/or other parts of the
not required ER.
(viii) Fire alarm control system and fire control centre in this project.

43
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

5.2 Overall System Design F. Provide alarm repeater panels in areas where specified including but not YES.
A. The design of the fire service installations shall base on the approved building YES limited to Building Management Office, fire service control room, CCMS room Please be
plans, FSDCOP, FS General Specification and the ER to satisfy both the and each building block. The main fire alarm control and indication panel advised that
FSD’s requirements and the additional fire service requirements in this shall be placed inside the fire service control room. The alarm repeater panels Fire Service
Contract. shall be provided with all the control functions such as alarm muting, alarm Control
reset, alarm sounding, pump on, etc. as in the mater fire alarm control and Room has
B. The Contractor shall provide additional fire service installation exceeding the YES indicating panel. Separate zoning and alarm for each individual building block been
statutory requirements where they are stipulated in the detailed requirements, with corresponding cross-building signal interlink shall be provided to cater for renamed as
schedule of accommodation and other parts of the ER such as additional different operation and management need of each block (if more than one Fire Control
portable fire extinguisher, additional gaseous total flooding extinguishing building block is built and irrespective of the presence of connection floor or Centre in the
system in various areas, etc. carpak). latest GBP.

C. The whole fire service installation shall be connected to the main fire alarm YES Repeater
control and indication panel and associated repeater panels as well as the Panels will
CCMS (Central Control & Monitoring System) to give indication of fire alarm, be provided
warning signals, monitoring data, water levels for all fire service tanks, low in both
level alarms for all fire service tanks, water flow in all floor distribution pipes, Tower's Fire
alarm for closure of normal open valves, etc. Control
Centre,
D. The Contractor shall use addressable multi-sensor detectors approved by the YES Building
FSD in place of all point type smoke detectors unless the multi-sensor Managemen
detectors are not approved by the FSD at some locations. The Contractor t Room and
shall submit and obtain approval from the FSD on the use of multi-sensor Control
detectors at an early stage. Room

Notwithstanding the above, addressable heat detectors shall be used in all The System
building services plant rooms where practicable unless otherwise specified. demarcation
For basement and smoke extraction system, addressable multi-sensor of the
detectors shall be used unless otherwise required by the FSD. Additional development
multi-sensor detectors wired in two coincidence zones shall be provided for will be as
the gaseous fire extinguishing system. following: I.)
North Tower
E. The fire alarm systems shall be of analogue addressable type or better and/or YES and
as approved by the SO. Basement
Floors & II.)
South
Tower.
44
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

(b) “PUMP RUN”, “PUMP STOPPED”, “OVERLOAD” & “PUMP FAULT”


5.3 Fire Hydrant and Hose Reel System indicating light for each pump
A. The Contractor shall design, supply and install fire hydrant and hose reel YES.
(c) “DUTY MODE” indicating light for each pump
systems for the building in accordance with the FSDCOP, FS General FSD has no
Specification and the ER. The systems shall be to the acceptance of FSD and objection on (d) Duty-standby selector switch
Water Supplies Department (hereinafter referred to as W.S.D.). using the
(e) Auto-off-manual selector switch
existing
The Contractor shall liaise with FSD at the preliminary design stage to Street Fire (f) On/off control switch for each pump
confirm whether in-complex street fire hydrant system is required for the Hydrant
(g) Indicating lights for “LOW WATER LEVEL ALARM” AND “HIGH
building development. The system, if required, shall satisfy FSD and WSD (yellow)
WATER LEVEL ALARM” of the FS tank
requirements. The Contractor shall conduct site measurement with WSD at adjacent to
preliminary design stage to verify whether the water pressure and water flow the site as (h) No flow indication
are adequate. The Contractor shall provide water tanks, street fire hydrant the provision
(i) Anti-condensation heater for control panel completed with on/off
pumps and associated facilities as required for a complete street fire hydrant of Street Fire
control and indicator
system to the approval of the FSD. Hydrant for
the (j) All indicating lights shall be of LED type.
development
(k) Any other provisions as indicated elsewhere in the ER
.
B. Hose reel
Hose reel shall be of swing out type or fixed type, unless otherwise specified YES 5.4 Automatic Sprinkler System
or to suit the actual site/statutory requirements, and shall be as specified in A. The Contractor shall design, supply and install automatic wet pipe sprinkler YES
the FS General Specification. The Contractor shall also provide guide rings system for the building in accordance with the L.P.C. Rules for Automatic
for the easy and proper operation of hose reel. Sprinkler Installations, (hereinafter referred to as the L.P.C. Rules), the
requirements of FSD, FS General Specification and the ER. The Contractor
C. Valves shall be responsible to check and design the system to fulfil the hazard
Automatic air relief valves with a suitable working pressure shall be fitted YES classification in accordance with the L.P.C. Rules.
where necessary or indicated for removal of air from the fire hydrant and B. All drain pipes and drain points for testing of the sprinkler system shall be YES
hosereel system. Drain valves shall be fitted on all low points of pipework neatly integrated in the building envelope.
where necessary for the water drainage of the system.
C. Sprinkler Control Valve Set
D. Pump Control Panels The control valve set comprising the associated pressure gauges, valves, YES.
`(i) In the local pump control panels for the fire pumps, jacking/jockey pump, and YES alarm devices, water motor gongs, testing facilities, retarding chambers, etc. Except that
transfer pumps, the following LED indicating lights and control switches shall shall be in accordance with the L.P.C. Rules and the FS General Specification separate
be provided, as the minimum: and subject to FSD’s approval. Drain pipes connecting to the system shall be Control
(a) “POWER ON” indicating lights with colour matching the corresponding led to conspicuous positions as approved by the SO and comply with the Valve Seat
phase requirements of WSD. Separate control valve sets for each individual building will not be

45
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

block and carpark shall be provided (if more than one building block is built provided for
and irrespective of the presence of connection floor or carpak). the Carpark
areas on
B1/F & B2/F
as the two
floors also
consist area
for other
purposes
such as (ii) Electric monitoring isolating valves shall also be provided and installed YES.
Loading/Unl by the Contractor complete with the associated wirings, conduits and
oading Area other associated electrical works for the sprinkler system, for sending
and E/M signals back to the addressable fire alarm control and indicating
plant rooms. panels (hereinafter referred to as fire alarm and control panels), to
indicate the open/close status of sprinkler pipes, in accordance with
Sprinkler the latest requirements of L.P.C. Rules, FSD, FS General Specification
head for and the ER. A 13A fused spur unit shall be installed by the Contractor
these near each flow switch.
carpark
areas will be E. Sprinkler Head
connected to (i) Sprinkler head shall be of semi-recess type finished to polyester white YES.
the Sprinkler colour and matching with the false ceiling colour. The white colour
Control sprinklers shall be coated and finished with paints in a factory
Valves Set approved by relevant authorities and local paint spray to change the
for North colour of the sprinkler heads will not be accepted.
Tower Low
Zone. (ii) Additional layer of sprinklers above false ceiling and within raised floor YES.
D. Subsidiary Stop Valves and Drains shall also be provided complying with the FSD requirements. except
(i) Separate drain riser connecting to G/F drain shall be provided for the YES. Exemption
subsidiary stop valves at every floor distribution pipe. Any future Except that for Raised
modification of the sprinkler layout will only be required to drain off the four Floor void
sprinklers in one floor. monitored sprinkler
subsidiary heads will be
Each subsidiary valve shall be monitored and complete with a flow valves will applied to
switch, a drain valve, a test valve and a drain pipe etc. as required by not be FSD for
L.P.C. Separate drain riser connecting to drainage system shall be provided on approval.

46
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

F. Pipework
Test legs with close shut off gate valves shall be provided at the end of each YES
(xi) Any other provisions as indicated elsewhere in the ER and FS General
pipe run
Specification
branching off from the main riser and at the end of each zone distribution
pipe.
5.5 Automatic Pre-action Recycling Sprinkler System
The test legs shall each consist of 32 mm open pipe section with a 32 mm A. Pre-action sprinkler system, if required in the RDS, shall be of Type A, YES.
stop valve complying with BS EN 12845. Separate rooms shall be provided to house the
and a brass plug cap. pre-action valve and associated equipment. Proper drainage shall be
provided for the Pre-action Sprinkler Valve Rooms.

G. Pump Control Panels B. As the preaction sprinkler system shall constitute a part of the complete YES.
The construction of the panels shall be stainless steel complying with FS YES. sprinkler installation for this project, all the relevant requirements as indicated
General Specification, with 1.6mm in thickness or proprietary approved in this part of Requirement, with particular attention to the last section, shall
product accepted by the SO. In all sprinkler pump, jockey pump and transfer be fully complied with as applicable.
pump control panels, the Contractor shall provide, but not limited to, the
following indications and accessories: C. The whole system shall be FSD and L.P.C. approved and supplied from a YES.
(i) “POWER ON” indicating lights with colour matching the corresponding proprietary manufacturer specialized in the manufacture of the system, and
phase the system installation shall also comply with the recommendations of the
manufacturer unless otherwise specified.
(ii) “PUMP RUN”, “PUMP STOPPED”, “OVERLOAD” & “PUMP FAULT”
indicating light for each sprinkler pump
D. The automatic preaction recycling sprinkler system shall be provided to YES.
(iii) “DUTY MODE” indicating light for each sprinkler pump Building Management Office, the CCMS room and other locations specified in Except for
ER. CCMS room
(iv) Duty-standby selector switch
as the room
(v) Auto-off-manual selector switch is not
provided on
(vi) On/off control switch for each pump
the latest
(vii) Indicating lights for “LOW WATER LEVEL ALARM” AND “HIGH GBP.
WATER LEVEL ALARM” of the sprinkler tank The
preaction
(viii) No flow indication
system has
(ix) Anti-condensation heater for control panel completed with on/off been
control and indicator clarified to
be of Type
(x) All indicating lights shall be of LED type.
A, complying

47
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

with BS EN
12845.
5.6 Clean Agent Gaseous Extinguishing System
(i) The Contractor shall design, supply, install and carry out all necessary YES.
testing and commissioning of the clean agent gaseous extinguishing
except the
systems (total flooding gaseous extinguishing systems) to the
approval of the SO and FSD, each of which shall include all necessary agent being
components and accessories required for a complete functional used is not B. The whole fire alarm and control system shall be a proven proprietary system YES
system. The system shall be provided to: FM200 as and approved by the FSD. The fire alarm equipment shall have proven
per shown in record of reliability with no false/unwanted alarm or have extra-built-in
(a) Server Rooms;
RDS as features to avoid unwanted alarm. Details shall be submitted to the SO for
(b) Network Rooms and Network Distribution Rooms; FM200 approval. Equipment without the proven record of reliability or extra-built-in
agentl features to avoid unwanted alarm as required above will not be accepted.
(c) TBE rooms, PABX room and rooms as stipulated in the room data
sheets, schedule of accommodation, and other parts of the ER. cannot fulfil The Contractor shall be required to demonstrate the compliance with the
the Global above requirements to the approval of the SO.
(ii) The Contractor shall use the same gas cylinder size for the clean Warming
agent in all rooms where possible and practicable to ease Potential C. All fire detection and alarm equipment, control and materials for the system YES
maintenance problems. The Contractor shall also provide permanently requirement shall be of analogue addressable type and supplied by a single manufacturer
connected duty and standby banks of filled gas cylinders for large in Clause iv. to ensure uniformity in standards and compatibility, unless otherwise
clean agent gaseous extinguishing installation (more than 2 cylinders) Novec accepted by the SO. The Contractor shall provide technical information and
to cater for the continued operation of the rooms in the event of 1230 is used confirmation on the full compatibility of all components offered to the SO for
accidental discharge. instead. consideration.

(iii) Where approved by FSD, fixed sprayer units using clean agent can be D. The addressable fire alarm control and indicating panel shall offer functions YES
used in these rooms for room volume less than 42 m3. including LCD display for addresses and commands, built-in diagnostics check
to ensure the system is operating correctly, monitoring and compensating for
(iv) The gaseous clean agent for fixed gaseous extinguishing installation
contamination in each detector and allowing manual selection of sensitivity
shall have a Global Warming Potential (GWP) of not more than 1, and
level of detectors and response time.
Ozone Depletion.

E. The addressable fire alarm control and indicating panel shall be of either floor YES
5.7 Fire Alarm and Control System
standing type or wall mounted type provided inside the fire control centre.
A. The Contractor shall design, supply and install a complete fire alarm and YES. The panel shall be housed in a 1.6 mm thick stainless steel waterproof cabinet
control system for the building together with the fire detection and automatic Except
of uniform width, and depth throughout, and with the integrated battery
fire alarm system. The fire alarm and control system shall be able to Repeater
compartment separately located on the lower part of the cabinet with a lockable
communicate with CCMS. Repeater panels shall be provided in the Building Panels will front door or as in approved proprietary design. The upper part of the cabinet
Management Office and CCMS Room. be provided
where the panel is installed shall be completed with a lockable hinged front
in the BMO
double leaves door with clear Perspex windows suitably sized that even when
and Control

48
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

the door is closed, all the indications and switches on the panel can still be (iii) Automatic detector fire alarm visual indication for each zone in red
clearly visible. The buzzer alarm signal on the panel shall also be clearly
audible when the front door is closed. The hinges of the door shall be so (iv) Manual alarm system fault warning visual indication for each zone in
arranged that the door can be opened up to a 180 degrees to facilitate the amber
access and maintenance to the panel and its internal circuitry and cause no
obstruction to the passage way where the panel is located. (v) Fire hydrant, sprinkler tanks low and overflow water levels in red

F. The central fire alarm and control panel shall be completed with a 1.6 mm thick YES (vi) Alarm indication for energisation and operation of system in red
stainless steel front panel on which the indication and control devices are
positioned. The front panels shall be suitably reinforced to avoid buckling and (vii) Sprinkler pumps and jacking pump power failure, respectively in red
shall be arranged as a hinged door to the housing cabinet with cylinder-type
lock and keys. The front cover shall be capable of open up to 180 degrees to (viii) Fire services pumps and jacking pump power failure, respectively in red
facilitate maintenance and access to the internal wiring. The functions of all
indication and control device shall be properly marked with engraved English (ix) Fire station link failure in red
and Chinese on the front cover. All lines and mimic diagrams shall be engraved
on the front cover with coloured paints to outline the zoning arrangements and (x) Closing of subsidiary stop valves in red
suitable visual indications shall also be provided on the mimic diagrams to
indicate the alarm zones. (xi) Fire station link triggered in red
G. All control shall be hard wirings. All control modules for control and monitoring YES
of local field devices of fire service installation shall be enclosed by a control This (xii) Generator fault in red
panel with built-in anti-condensation of heater. arrangement
will be (xiii) Fault warning visual indication in amber for:
provided
adjacent to (a) Main power failure
each
Tower's Fire (b) Battery failure
Alarm Panel
only. (c) Battery charger failure
H. The addressable fire alarm control and indicating panel shall have, but not YES
limited to, the following indications and functions: (d) Sprinkler system failure

(i) Sprinkler fire alarm visual indication for each zone in red (e) Automatic detector system fault warning visual indication for each
zone
(ii) Manual fire alarm visual indication for each zone in red
(f) System isolated in amber, with buzzer

49
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

I. Batteries and Chargers panels, and one set of properly labelled key set shall be provided in each box
(i) Separate and independent batteries and charger system shall be YES for opening the doors of the corresponding compartments of the cabinets and
provided for each of the addressable fire alarm control and indicating for the operation of the key switches on the panels. The other four sets of the
panel, and other panels such as pump control panels, installed keys for each building as well as that for the key boxes shall be provided to
concealed from view at locations to be accepted by the SO. the SO before the completion of the Contract.

(ii) Batteries and charger system shall comply with the FS General YES M. Fire alarm and control repeater panels shall be provided in the Building YES.
Specification. Each cabinet housing the batteries and charger, current Management Office, and CCMS Room. The repeater panels or the fire Repeater
meter, voltmeter, and the relevant indications shall be of robust alarm panels shall give clear indication of position of fire alarm in a mimic Panels and
construction made from 1.6 mm thick stainless steel sheet and shall panel having LED indication lights and the building section in a 2mm thick Mimic
be well ventilated, corrosion proof and of wall mounted cubicle type. stainless steel panel. PC terminal based repeater fire alarm panel with Panels will
The battery compartment shall be properly segregated by earthed appropriate system software for animation display of graphical layout of fire be provided
stainless steel partition from the charger compartment. Label with alarm can be considered for replacement of hard wire mimic panel. in the BMO
engraved wordings "Batteries and Charger Cabinet" and other labels and Control
for meters and indications, in both English and Chinese shall be Room of
clearly and legibly fixed on the cabinet by positive means, other than each Tower,
by adhesive. CCMS room
is not
J. All control panels and their connected alarm detection and control devices YES provided in
shall be arranged for continuous monitoring of all alarm circuits, including the latest GBP.
wiring and the alarm signalling devices connected thereto, and complete with N. The Contractor shall provide a direct fire alarm telephone link to a remote YES
fault warning facilities such as indications and buzzer. The unauthorized FSD’s approved centre for the automatic fire alarm system following the FS
removal of any detectors, fire alarm call points and faults etc. shall activate General Specification, complete relevant parts of the telephone connection
the fault warning facilities. for the activation of direct fire alarm telephone link for fire service testing and
commissioning work and for inspection by FSD and maintain the direct fire
alarm telephone links for the whole Maintenance Period including the
payment of all fees and charges.
K. All addressable fire alarm control and indicating panels shall have sufficient YES
numbers of provisions and zones for the connection of all the detection, O. The High level interface shall be provided for interfacing and connection to YES
control, indication and alarm facilities as mentioned in the ER. The Contractor the CCMS so that fire alarm signals and other warning signals and status
shall also allow a spare provision of at least 20 zones in the main fire alarm data can be displayed on the CCMS stations. The CCMS shall only display
control and indication panel for any possible future expansion. and monitor the fire alarm and status signals and shall not affect the operation
of the fire alarm and control system. Layout and graphic shall be incorporated
L. The Contractor shall supply and install a locked key box with labelled key set YES for display.
for each of the main fire alarm and control panel and the FS repeater panels.
A lockable key box with glass front shall be installed next to each of these

50
Contract No.: SS C502 (Programme No.: 074KA)
Design and Construction of West Kowloon Government Offices

P. The Contractor shall provide dry contact signal of fire alarm per zone for YES will be
Security Systems and Card Access Control System interface. The FAP of provide with
each Tower a high level
will be interfacing
provided point for
with 24V connection
D.C. dry to CCMS.
contact for 5.11 Testing and Commissioning Requirements
interfacing A. The Contractor shall carry out testing and commissioning for the whole fire Yes
with the service installation (including all the fire service installations and fire service
Tower's related installations/facilities provided by the Contractor under various
respective building services installations of the Works) following relevant Testing and
Security and Commissioning Procedures issued by Building Services Branch of
Card Access Architectural Services Department; as required by FSD; and in compliance
Control with the FS General Specification in conjunction with all involved parties to
System. the satisfaction of the SO and FSD. The Contractor shall provide all
Q. Fire alarm bells shall not be exposed to view in office area. YES necessary apparatus, accessories, fuels, gas agents, materials, equipment
and personnel for conducting the full testing and commissioning procedures
R. Manual call points at outdoor and basement shall be of weatherproof type to YES as required in the Contract and as required by the FSD. Should the tests
IP65. show failure in complying with the Contract and FSD’s requirements, the
Contractor shall arrange rectification works and arrange full re-testing as
5.8 Electrical Works required by the SO and FSD at Contractor’s own expenses.
All electrical works shall comply with the FS General Specification and the YES B. Besides carrying out the final testing and commissioning in the presence of Yes
General Specification for Electrical Installation. FSD personnel, the Contractor shall arrange full testing and commissioning
covering all fire service installation for the SO and/or his representatives
5.9 Audio Visual Advisory System showing that the fire service installation is in order and complies with FSD
The Contractor shall design, supply and install the audio visual fire advisory YES requirements before requesting FSD inspection. The Contractor shall carry
alarm system for the building to satisfy the FSD’s requirements. The audio out additional tests when required if any part of the test fails.
visual advisory fire alarm system shall also comply with the the requirements
of the “Design Manual: Barrier Free Access 2008” or the latest version of the
Buildings Department.

5.10 Interfacing with CCMS


The whole fire service installation shall be provided with the high level YES.
interface for interfacing and connection to the CCMS. The FAP of
each tower

51