RA BILL NO.: 01
To
PRISM PROCON PRIVATE LIMITED
Auraiya Phulpur Pipeline Project, Section - II
GSTIN - 09AAFCP7545K1ZV
ABSTRACT OF PAYMEN
SOR UNIT
S.O.R ITEM NO. BRIEF DESCRIPTION OF WORKS % UNIT AMOUNT
QUANTITY RATE
10 Completion of site
development,stacking,clearing & grading of 10% Mtr ### 150.00 5,250,000.00
ROU,
20 Completion of
fabrication,alignment,stringing,field 30% Mtr ### 450.00 ###
welding,radiography NDT (Radiography)
RA BILL NO.: 01
To
PRISM PROCON PRIVATE LIMITED
Auraiya Phulpur Pipeline Project, Section - II
GSTIN - 09AAFCP7545K1ZV
RA BILL NO.: 01
To
PRISM PROCON PRIVATE LIMITED
Auraiya Phulpur Pipeline Project, Section - II
GSTIN - 09AAFCP7545K1ZV
ILL NO.: 01
OF PAYMENT (INR)
QUANTITY CERTIFIED AMOUNT (Rs)
PREVIOUS CUMULATIVE REMARKS
THIS BILL PREVIOUS BILL THIS BILL CUMULATIVE BILL
BILL BILL
ILL NO.: 01
- - - - - -
- - - - - -
- - - - - -
- 10,146,444.90 10,146,444.90
- 913,180.04 913,180.04
913,180.04 913,180.04
For SC For CIPL
NE PROJECT ,(SECTIONI-II 24" DIA X 50 KM)
ILL NO.: 01
- 11,972,804.98 11,972,804.98
- 507,322.25 507,322.25
- 11,465,482.74 11,465,482.74
13 Copy of registration certificate of TIN /Tan of concerned state in which WOT is deducted Enclosed Arrange by Account department
&deposited
Notes :-
1)- There will be signature of concerned contractor ,PMC & GAIL representative in place.
2)- Cenvatable Invoice , Memorandum of Payment to be signed by GAIL Section In charge & GAIL Construction In charge
3)- Abstract of payment ,measurement sheets are to be signed by GAIL section in charge/his representative .
4)- GAIL Spread in- Charge /construction in-charge may also require to sign any other relevant documents as applicable from case to case.
5)- NOC from sub-contractor ,if any (deployed after getting approval from GAIL/PMC) regarding receipt of payment.
6)-In case of final bill contractor shall be required to submit NOC and Indemnity bond and also NOC from sub contractor about receipt of full payment from contractor.
7)- Copy of hindrance register from the specific period (RA Bill Period ) dully signed by contractor /PMC/GAIL to be submitted along with RA bill.
Payment Terms :-5%-Supply 40 mm permanent Lub. Tele HDPE Duct-Order Placement and
Note- Certified that the work is done as per drawings and specifications. Quantities mentioned above are checked and certified
FOR MECON/GAIL
Sign
Name
Date
Payment Terms :-65%-Supply 40 mm permanent Lub. Tele HDPE Duct-receipt & accepatcne at site
Note- Certified that the work is done as per drawings and specifications. Quantities mentioned above are checked and certified
FOR MECON/GAIL
Sign
Name
Date