Pre-commissioning Checks:
Pre-commissioning Activities
All the automatic controls including the furnace drafts, drum level,
the steam temperature should be put into operation progressively.
Combustion regime adjustments should be taken up at this stage for
optimizing the boiler performances. The furnace must be visually
checked for proper combustion at regular intervals.