Front Elevation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FRONT ELEVATION

0.60
0.15 SLAB BEAM

4.00 4.00

P.LVL
G.LVL
0.45 0.45
FRONT ELEVATION SECTION A-A'
0.45
1.10 v 1.00 12.00

1.00
BATTERY &

CABLE TRENCH CHARGER


11 KV BUS COUPLER

DC/DB
11KV OUTGOING
11KV OUTGOING

0.50
11KV OUTGOING

11KV OUTGOING
11KV OUTGOING

11KV INCOMER
11KV INCOMER

AC/DB PANEL

1.80
33KV T/F C&R 33KV T/F C&R

1.80
v 5.60
33KV FEEDER
C&R

D2 10.00
10.00
3.00x3.50m

T/B ROOM
2.00X3.00

RAMP
RS

D1
W JE ROOM
D1

3.00X4.00 DWG NO.- S/S_SHIMLA_BANUTI_01


STORE AND PANTRY
2.00X3.00 v Date:03-07-2019
0.45 w D3 w LOA
HPSEBL.CE(MM)/Tenders/DDUGJY/Pkg-1(Shimla)LoA(Supply)2017-18-17307
HPSEBL.CE(MM)/Tenders/DDUGJY/Pkg-1(Shimla)LoA(Erection)2017-18-17308

4.20 3.201.00 Prepared P.P.C.P.L.J.V


4.20 0.45
TERRACE PLAN By
Deen Dayal Upadhaya Gram Jyoti Yojana (DDUGJY)
Project
GROUNDFLOOR PLAN HPSEBL/CE(MM)/DDUGJY/PKG-01/SHIMLA

Title General Layout Plan Of Proposed 33/11 KV


Substation at Banuti
1. All dimensions are in metre unless otherwise mentioned.
Notes
2. Tolerance in Dimensions of + 1.5% if not specified in standards