1. Scope of Supply
This specification covers the following for Single Phase 240 V, 10A-60 A Static Watt hour smart
meters of accuracy class 1.0 with plug in communication modules (RF mesh only and RF + Cellular
technology) and integrated load control switches.
A. Design, manufacture, testing at manufacturer works before dispatch, packing, delivery and
submission of all documentation.
B. Any accessories / hardware required for installation and operation for the meter.
0,5 S, 1 and 2)
DLMS- Yellow
2.34 Conformance testing process
Book
2.35 IEEE 802.15.4 Standard for Local and metropolitan area networks.
Standard for Local and metropolitan area networks (Use of the 865
2.36 IEEE 802.15.4u
MHz to 867 MHz Band in India)
Order of precedence between different standards shall be as follow:
i Indian Standards Issued By BIS
ii IEC standard
Iii Other standards like CBIP, DLMS etc.
3. Service Conditions
SN Item Description
Operation range: -10 Deg C to 55 Deg C
3.1 Temperature Range Limit range of operation: -25 to 60 Deg C
Limit range of storage / transport : -25 to 70 Deg C
3.2 Relative Humidity 0 to 96 %
6. Construction Feature
SN Item Description
6.1 General Construction of meters shall confirm to the IS 16444 (Part 1)
Material - Opaque and UV stabilized polycarbonate of grade
6.2 Base Body LEXAN 143/ 943 or Equivalent with V0 inflammability
level.
a. Material – Transparent/Opaque and UV stabilized
polycarbonate of grade LEXAN 143/ 943 or
6.3 Top Cover
Equivalent with V0 inflammability level.
b. Top cover and base should be
Ultrasonically/Chemically welded.
c. Mechanism shall be provided to log event in case of
top cover is opened. Bidder shall explain its
mechanism.
a. Material - Flame retardant glass filled polycarbonate
of grade 500 R or equivalent.
b. Terminal block shall be capable of passing the tests
6.4 Terminal Block as per ISO-75 for a temperature of 135 Deg C and
pressure of 1.8MPa. The terminals shall be designed
so as to ensure adequate and durable contact such that
there is no risk of loosening or undue heating.
a. Meter Type 1: The terminal cover shall be extended
type with 2 no’s holes of minimum 30 mm in
diameter for cable entry.
Meter Type 2: Short terminal cover with U cut
suitable for entry of 2CX25 Sqmm Cable.
b. Material - UV stabilized transparent/Opaque
polycarbonate cover.
c. Provision of sealing through sealing screws.
d. The sealing screws shall be held captive in the
terminal cover.
6.5 Terminal cover e. Terminal cover should have provision for cable entry
from bottom.
f. Baffle wall shall be provided above the cable entry
base wall so that access to the terminals is not
possible (even with thin metallic wire) without
breaking the seal.
g. Diagram of external connections should be embossed
on terminal cover. Sticker is not acceptable.
h. Mechanism shall be provided to record an event with
occurrence and restoration in case of terminal cover
is opened. Bidder shall explain its mechanism.
a. Terminals shall be suitable upto 25 Sqmm aluminium
stranded cable.
b. Two no’s flat head screws and washers per terminal
shall be provided
6.6 Terminals c. Material of terminals, screws and washers should be
brass or tinned copper. Terminals shall be tested for
continuous current of 150 % Imax.
d. Terminals shall be clearly marked for phase / neutral
/ outgoing etc.
meter rating.
a. Utilization category of the load switch shall be UC2
Performance requirement
6.13.1 as per clause no. 4.6.6.2 of IS 15884.
for load switching
b. All load switches shall operate simultaneously.
Meter shall have an optical port with a rust resistance coated
metal ring to hold magnet of downloading probe. Optical
6.14 Optical port
port shall comply with hardware specifications provided in
IEC-62056-21.
a. Meter should have the provision for 01 no’s plug in
communication module for connectivity. The same
interface shall be compatible with both Cellular and
RF communication technologies interchangeable in
field.
b. Interface shall support data transfer between meter
and network interface card over UART/ RS232.
Communication Module Bidder shall explain its pin out and standard in detail.
6.15
Interface c. Meter shall have mechanism to log communication
module removal as an event in its memory with date
and time stamp.
d. Meter Vendor shall work with BRPL designated RF
provider to integrate their module in the meter as per
integration requirement mentioned in annexure ‘C’.
e. Preferred location of communication card module
shall be on top of meter.
a. Smart meter shall have 01 no’s plug-in type
communication modules/ Network Interface card
(NIC) for connectivity of meter to HES from
following options as per tender requirement:
i. Communication Module/ NIC Type 1: RF
based suitable for communication Network of
BRPL designated RF canopy provider.
Communication modules ii. Communication Module/ NIC Type 2: RF and
6.15.1
(NIC) cellular communication module (LTE 4G
with 3G and 2G fall back as per Indian
Telecom Standards).
b. Meter shall have separate indications on display/ for
remote and local communication.
c. Communication module shall held in a casing which
can be directly plugged in the meter. Sealing screw
shall be provided.
7. Functional Requirement
SN Item Description
Smart meter comply with D1 category of IS 15959 (Part
7.1 Meter category
2).
It should be possible to configure meters in following
modes of metering:
a. Forwarded Only: In this mode any export active
energy shall be treated as import energy and shall
be recorded in forward only register. Apparent
energy calculation shall be as per KVAH
calculation mentioned in clause '7.4'
7.2 Mode of metering
b. Bidirectional: Both Import and export energy
recording shall be applicable in this mode of
metering and relevant registers shall be updated.
Any change in metering mode shall be logged in events
with date and time stamp.
Default mode of metering shall be forwarded only until
specified otherwise.
It should be possible to configure meter in following
modes of payment:
a. Post payment mode
b. Prepayment Mode
7.3 Payment Mode Any change in payment mode shall be logged in events
with date and time stamp.
Prepayment facility shall be achieved by server / HES.
Default mode of metering shall be post payment until
specified otherwise.
value.
c. All the parameters mentioned in table Table
‘A27’ of IS 15959 (Part 2) shall be supported by
meters.
8. Meter Display
SN Item Description
8.1 LCD Type STN Liquid crystal with backlit
Minimum 160 Degree.
8.2 Viewing angle The display visibility should be sufficient to read the Meter
mounted at height of 0.5 m as well as at the height of 2 m.
8.3 Size of LCD Minimum 10 mm X 6 mm
8.4 LCD Digits Total 6 +1 digits
8.5 LCD language English
Following parameters should be displayed in Auto scroll
with programmable interval
Order Parameter Display time
1 LCD Test 5 Sec
Meter Sr. No.(8
2 digits) 5 Sec
3 Date 5 Sec
4 Time 5 Sec
5 Cumulative kWh 30 Sec
6 Current month MD 5 Sec
8.6 Display mode
Instantaneous
7 Voltage 5 Sec
Instantaneous
8 Current 5 Sec
9 Power Factor 5 Sec
10 Frequency 5 Sec
Instantaneous Load
11 KW 5 Sec
Signal Strength (RF/
12 GSM) 5 Sec
13 Temperature 5 Sec
14 kVARh 5 Sec
15 kVAH 5 Sec
Meter with push button for manual display shall not be
acceptable.
Appropriate indications/flags for all tampers and self
8.7 Display indications
diagnostic features should be provided.
14. Deviations
a. Deviations from this specification can· be acceptable, only
where the Seller has listed in his quotation the requirements
he cannot, or does not, wish to comply with and which
deviations the Buyer has agreed to in writing, before any
14.1 Deviations
order is placed.
b. In the absence of any list of deviations from the Seller, it
will be assumed by the Buyer that the Seller complies with
the Specification fully.
Dispatch
16. Delivery
Despatch of Material: Vendor shall despatch the material, only
after the Routine Tests/Final Acceptance Tests (FAT) of the
16.1 Delivery
material witnessed/waived by the Purchaser, and after receiving
written Material Despatch Clearance (MDC) from the Purchaser.
Bidder shall furnish the GTP format with all details against each clause of this specification.
Bidder shall not change the format of GTP or clause description.
Bidder to submit duly filled GTP in hard copy format with company seal.
Integration requirements with communication provider of BRPL/ any other agency designated
by BRPL for other components of AMI.
a. Bidder(s) must share the meter security keys, all level encryption, and password
information along with asset information in a format with the buyer / communication
provider of BRPL so that during AMI business flow, the device and data can be
authenticated all the time.
b. Bidder(s) must share the details of meter communication specifically programmed
protocols.
c. Bidder(s) must share the meter configuration source code to the BRPL/ communication
provider of BRPL.
d. Bidder (s) must share the meter interface touch points for external applications/ systems.
e. Bidder(s) must share the required APIs including but not limited to reading APIs,
configuration APIs and Functional APIs with the System Integrator for execution of
business flow (Installation, reading, configuration).
f. Bidder(s) must share the data storage and retrieval details.
g. Bidder(s) must configure the devices to be upgraded remotely (OTA) and share the
required firmware source code (with updates over the project life) with system integrator
as and when it is required in case of feature request or fault correction.
h. Bidder(s) must follow and conduct Utility’s sample and periodic test program, including
(but not limited to) the selection of a sample population of meters, sharing of sample test
results as reported by the meter testing systems with the system Integrator.
i. Bidder(s) must share the information related to communication module for the
authorization purpose at to BRPL/ communication provider of BRPL.
Note:
1. Event ID’s shall be defined as per BRPL specification/ IS 155959 (part 2).
Approval shall be taken from BRPL prior to manufacturing for Event ID’s
2. Programming of threshold values should be possible from remote via proper
authentications.
3. Logics of tampers can be changed/ upgraded via firmware up gradation from
remote via proper authentication.
4. All the programming changes/ firmware up gradations shall be logged along-with
date and time stamp in meter as well as on HES.
Index
Record of Revision
1. Scope of Supply
This specification covers the following for Three Phase 240 V, 20A-100A Static Watt hour smart
meters of accuracy class 1.0 with plug in communication modules (RF mesh only and RF +
Cellular technology) and integrated load control switches.
A. Design, manufacture, testing at manufacturer works before dispatch, packing, delivery and
submission of all documentation.
B. Any accessories / hardware required for installation and operation for the meter.
2.18 IEC 62056-3-1:2013 Use of local area networks on twisted pair with carrier signalling
2.19 IEC 62056-4-7:2014 DLMS/COSEM transport layer for IP networks
2.20 IEC 62056-5-3:2017 DLMS/COSEM application layer
2.21 IEC 62056-6-1:2017 Object Identification System (OBIS)
3. Service Conditions
SN Item Description
Operation range: -10 Deg C to 55 Deg C
3.1 Temperature Range Limit range of operation: -25 to 60 Deg C
Limit range of storage / transport : -25 to 70 Deg C
3.2 Relative Humidity 0 to 96 %
voltage
5.13 Short time over current As per clause no. 5.5.3 of IS 15884
Immunity to phase and
5.14 As per clause no. 9.6 of IS 13779
earth fault
Influence of Self
5.15 As per IS 5.5.4 of IS 15884
Heating
5.16 Influence of Heating As per IS 5.5.5 of IS 15884
a. Meter shall remain immune to electrostatic discharge
(upto and including 35KV), electromagnetic HF field and
fast transient burst.
b. The meter shall be designed in such a way that conducted
Electromagnetic or radiated electromagnetic disturbances as well as
5.17
compatibility electrostatic discharge do not influence the meter.
c. Meter shall be type tested for electromagnetic
compatibility.
d. Meter shall comply requirement of clause no. 5.5 and 5.5
of IS 15884
Meter shall work within guaranteed accuracy as per IS 13779/
IEC62053-21/ CBIP325 (most stringent standard to be followed)
under and after influence of following :-
a. Current Variation
b. Ambient Temperature variation
c. Voltage variation
d. Frequency variation
e. 10% third harmonic in current
f. Reversed phase sequence
g. Voltage unbalance
h. Harmonic components in current and voltage circuit
i. DC and even harmonics in AC current circuit
Limits of error due to
5.18 j. Odd harmonics in AC current circuit.
influence quantities
k. Sub harmonics in AC current circuit
l. Continuous (DC) “stray” magnetic induction of 67mT+/-
5%.
m. Continuous (DC) “abnormal” magnetic induction of
0.27T+/-5%.
n. Alternating (AC) “stray’ magnetic induction of 0.5mT+/-
5%
o. Alternating (AC) “abnormal’ magnetic induction of
10mT.
p. External magnetic field 0.5 T
q. Electromagnetic HF fields
r. Radio frequency interference
s. DC immunity test
Note: BRPL reserves the right to formulate any other test method
to check magnetic immunity/ logging of meter. Meter with
logging provision will be preferred.
6. Construction Feature
SN Item Description
6.1 General Construction of meters shall confirm to the IS 16444 (Part 1)
Material - Opaque and UV stabilized polycarbonate of grade
6.2 Base Body LEXAN 143/ 943 or Equivalent with V0 inflammability
level.
a. Material: Transparent/Opaque and UV stabilized
polycarbonate of grade LEXAN 143/ 943 or
6.3 Top Cover Equivalent with V0 inflammability level.
b. Top cover and base should be
Ultrasonically/Chemically welded.
a. Material - Flame retardant glass filled polycarbonate
of grade 500 R or equivalent.
b. Terminal block shall be capable of passing the tests
6.4 Terminal Block as per ISO-75 for a temperature of 135C and pressure
of 1.8MPa. The terminals shall be designed so as to
ensure adequate and durable contact such that there is
no risk of loosening or undue heating.
a. Material - UV stabilized transparent/Opaque
polycarbonate cover
b. Provision of sealing at two points through sealing
screw.
c. The sealing screws shall be held captive in the
terminal cover.
d. The terminal cover shall be extended type with baffle
wall above the cable entry base wall so that access to
6.5 Terminal cover
the terminals is not possible (even with thin metallic
wire) without breaking the seal. Terminal cover
should have provision for cable entry from bottom.
e. Diagram of external connections should be embossed
on terminal cover. Sticker is not acceptable.
f. Mechanism shall be provided to record an event with
occurrence and restoration in case of meter enclosure/
terminal cover is opened.
7. Functional Requirement
SN Item Description
Smart meter shall comply D2 category of IS 15959
7.1 Meter category
(Part 2).
It should be possible to configure meters in following
modes of metering:
a. Forwarded Only: In this mode any export active
energy shall be treated as import energy and
shall be recorded in forward only register.
Apparent energy calculation in this mode shall
be as per clause no. 6.5.
7.2 Mode of metering
b. Bidirectional: Both Import and export energy
recording shall be applicable in this mode of
metering and relevant registers shall be updated.
Any change in metering mode shall be logged in events
with date and time stamp.
Default mode of metering shall be forwarded only untill
specified in tender requirement otherwise.
It should be possible to configure meter in following
modes of payment:
a. Post payment mode
b. Prepayment Mode
7.3 Payment Mode Any change in payment mode shall be logged in events
with date and time stamp.
Prepayment facility shall be achieved by server / HES.
Default mode of metering shall be post payment untill
specified in tender requirement otherwise.
Lag only: KVAh is computed based on KVArh and
7.4 KVAH Calculation
KWH value. If PF=1, or leading, then KVAh = KWH.
i. B Phase Voltage
j. Three Phase Power factor
k. Cumulative energy- kWh
8. Meter Display
SN Item Description
8.1 LCD Type STN Liquid crystal with backlit
a. Minimum 120 Degree.
b. The display visibility should be sufficient to read
8.2 Viewing angle
the Meter mounted at height of 0.5 m as well as at
the height of 2 m.
8.3 Size of LCD Minimum 10X5mm
8.4 LCD Digits Total 6+1 digits
8.5 LCD language English
a. Auto Mode
b. Manual Mode
8.6 Display modes c. Sub active mode
Display list shall be finalized during detailed engineering
in the event of order.
Appropriate indications/flags for all tampers and self
8.7 Display indications
diagnostic features should be provided.
Inspection Hold-
12.3 To be mutually identified, agreed and approved in Quality Plan.
Points
a. The meter shall be of type tested quality including all tests
specified in this specification which are beyond IS / IEC or
CBIP.
b. Type test conducted from CPRI/ ERDA/ or any other lab
specified by BIS/ CEA for smart meter testing will be
treated as valid.
12.4 Type Tests
c. Type test certificate should be submitted along with offer
for scrutiny.
d. Any other component supplied in addition to meter shall
also be type tested as per IS /IEC if applicable.
e. Complete type test as per IS 16444 (Part 1) shall be carried
out on sample selected from BRPL lot.
12.5 Routine tests All test marked “R” as per table 20 of IS 13779.
a. All tests marked “A” as per table 20 of IS 13779.
b. Smart meter functional tests as per IS 16444 Table 1
c. Test of load switch as per clause 10.4 of IS 16444 (Part 1)
d. Test for data exchange protocol as per clause 10.5 of IS
16445.
e. Test for Smart meter communicability as per clause no. 10.6
of IS 16444 (Part 1).
f. All the routine and acceptance tests shall be carried out as
per relevant standards.
g. Following tests in addition to IS shall be conducted during
lot inspection.
12.6 Acceptance Tests
I) Dimensional and drawing verification.
II) Display parameters/ sequence.
III) Data Downloading from CMRI and PC.
IV) Tamper/ fraud detection/logging features as per
approved documents. Tamper conditions will be
simulated at varying load up to Imax. Accuracy will
also be checked during tamper simulation.
V) Burn in chamber test.
VI) Component verifications.
h. Purchaser reserves the right to formulate any other test
method to verify guaranteed parameters of Meter.
ESD and Magnetic ESD and magnetic interference test will be conducted at Samir
12.7
Interference test lab, Chennai or CPRI.
12.8 Inspection a. Purchaser reserves the right to inspect /witness all tests on
14. Deviations
a. Deviations from this specification can· be acceptable, only
where the Seller has listed in his quotation the requirements
14.1 Deviations he cannot, or does not, wish to comply with and which
deviations the Buyer has agreed to in writing, before any
order is placed.
instructions
19 As Built Drawing Required Required
Operation and maintenance Instruction as well as
20 Required Required
trouble shooting charts/ manuals
Inspection and test reports, carried out in
21 Required
manufacturer’s works
22 Routine Test certificates Required
23 Test certificates of all bought out items Required
24 Meter Seal data Required
25 Mapping of meter serial no to Communication card. Required
16. Delivery
Despatch of Material: Vendor shall despatch the material, only
after the Routine Tests/Final Acceptance Tests (FAT) of the
16.1 Delivery
material witnessed/waived by the Purchaser, and after receiving
written Material Despatch Clearance (MDC) from the Purchaser.
Bidder shall furnish the GTP format with all details against each clause of this specification.
Bidder shall not change the format of GTP or clause description.
Bidder to submit duly filled GTP in hard copy format with company seal.
Integration requirements with communication provider of BRPL/ any other agency designated by
BRPL for other components of AMI.
a. Bidder(s) must share the meter security keys, all level encryption, and password information
along with asset information in a format with the buyer / communication provider of BRPL
so that during AMI business flow, the device and data can be authenticated all the time.
b. Bidder(s) must share the details of meter communication specifically programmed protocols.
c. Bidder(s) must share the meter configuration source code to the BRPL/ communication
provider of BRPL.
d. Bidder (s) must share the meter interface touch points for external applications/ systems.
e. Bidder(s) must share the required APIs including but not limited to reading APIs,
configuration APIs and Functional APIs with the System Integrator for execution of business
flow (Installation, reading, configuration).
f. Bidder(s) must share the data storage and retrieval details.
g. Bidder(s) must configure the devices to be upgraded remotely (OTA) and share the required
firmware source code (with updates over the project life) with system integrator as and when
it is required in case of feature request or fault correction.
h. Bidder(s) must follow and conduct Utility’s sample and periodic test program, including (but
not limited to) the selection of a sample population of meters, sharing of sample test results
as reported by the meter testing systems with the system Integrator.
i. Bidder(s) must share the information related to communication module for the authorization
purpose at to BRPL/ communication provider of BRPL.
Current Reverse/ R
Meter should log the event
Phase Current
of reversal of C.C polarity.
Reverse (occurrence/
Meter should register
Restoration) Occurrence: If Ip = -ve
energy consumed correctly
Y Phase Current direction Occurrence: 5 Min
with any one, two or all
Reverse (occurrence/ Restoration: If Ip=+ve Restoration: 5 Min
three current coils reversed.
Restoration) direction
This event shal not be valid
B Phase Current
in bidirectional mode of
Reverse (occurrence/
metering.
Restoration)
R Phase Current
Open (Occurrence/
Vector
Restoration) Meter should log the event
Sum(IR+IY+IB+IN)>20%
Y Phase Current of current coil open.
Ib and I<10% Ib Occurrence: 5 Min
Open (Occurrence/ Threshold value of current
Vector Restoration: 5 Min
Restoration) should be programmable at
Sum(IR+IY+IB+IN)>20%
B Phase Current factory end.
Ib
Open (Occurrence/
Restoration)
Current Unbalance
(Occurrence/
Restoration)
Vector
Meter should log the event
Sum(IR+IY+IB+IN)>20%
of current coil
Current Bypass Ib and I (any Phase) >5%
shorting/bypass. Threshold
(Occurrence/ Ib
value of current should be
Restoration Vector
programmable at factory
Sum(IR+IY+IB+IN)>10%
end.
Ib
If the current in any phase
Over current exceeds the specified
Occurrence: If Ip>Imax Occurrence: 5 Min
(occurrence/ threshold current, meter
Restoration: If Ip<=Imax Restoration: 5 Min
restoration) should log over current
event.
R Phase high Current Meter should log
Harmonics occurrence of high current
Occurrence: If % THD in
R Phase high Current harmonic event when %
IP>5% of fundamental. Occurrence: 5 Min
Harmonics THD in current of phase
Restoration: If % THD in Restoration: 5 Min
will be more than threshold
R Phase high Current IP <5% of fundamental.
value. Threshold value
Harmonics
should be factory
3. Power Related Events:
(occurrence/ circuit.
restoration)
Meter shall able to detect
and log the low PF event if
power factor of the load
found between 0.2 to 0.5 for
a load above than a %
thershold value for a
Low Power Factor
thershould time value.
Event shall restore if PF
factor of load remain out of
range 0.2 to 0.5 for a load
ablove than % thershould
value for
Plug in Meter should log the
Communication removal of communication
module removal card. Meter should also log
(Occurrence/ insertion of communication
Restoration) card. By NC switch/ sensor
Configuration
change to post-paid Meter should log the change
mode/ pre-paid in payment mode
mode configuration.
Configuration
change to
“Forwarded” only" Meter should log the change
mode/ “Import and in metering mode
Export” mode configuration.
Overload
(Occurrence/ Meter should able to log the
Restoration) status of overload in KW
Meter with communication
HV Spark card should be immune or
(Occurrence/ log the event in the case of Immediately NA
restoration)/ Jammer application of ESD upto and
including 35 KV.
Meter should log event of
Occurrence: If IN > 50%
high neutral current if
of average phase current Occurrence: 5 Min
High neutral Current measured neutral current
Restoration: If IN < 50% Restoration: 5 Min
should be more than
of average phase current
predefined threshold value.
Distorted PF Meter shall log the event if Occurrence: 5 Min
Note:
1. Event ID’s shall be defined as per BRPL specification/ IS 155959 (part 2).
Approval shall be taken from BRPL prior to manufacturing for Event ID’s
2. Programming of threshold values should be possible from remote via proper
authentications.
3. Logics of tampers can be changed/ upgraded via firmware up gradation from
remote via proper authentication.
4. All the programming changes/ firmware up gradations shall be logged along-with
date and time stamp in meter as well as on HES.
Index
Record of Revision
Item/Clause Reason of
Change in Specification Approved By Rev
No. Change
1. Scope of Supply
This specification covers the following for Three Phase 240 V, 5A-10A AC Static transformer
operated Watt hour and Var Hour smart meters of accuracy class 0.5s with plug in communication
module (RF mesh only and RF + Cellular technology).
Design, manufacture, testing at manufacturer works before dispatch, packing, delivery and
A.
submission of all documentation.
B. Any accessories / hardware required for installation and operation for the meter.
Book
DLMS- Green
2.34 Architecture and protocols to transport the model
Book
DLMS- Yellow
2.35 Conformance testing process
Book
2.36 IEEE 802.15.4 Standard for Local and metropolitan area networks.
Standard for Local and metropolitan area networks (Use of the 865 MHz
2.37 IEEE 802.15.4u
to 867 MHz Band in India)
Order of precedence between different standards shall be as follow:
i Indian Standards Issued By BIS
ii IEC standard
Iii Other standards like CBIP, DLMS etc.
3. Service Conditions
SN Item Description
Operation range: -10 Deg C to 55 Deg C
3.1 Temperature Range Limit range of operation: -25 to 60 Deg C
Limit range of storage / transport : -25 to 70 Deg C
3.2 Relative Humidity 0 to 96 %
voltage.
6. Construction Feature
SN Item Description
Material - Opaque and UV stabilized polycarbonate of grade
6.1 Base Body LEXAN 143/ 943 or Equivalent with V0 inflammability
level.
a. Material: Transparent/Opaque and UV stabilized
polycarbonate of grade LEXAN 143/ 943 or Equivalent
6.2 Top Cover with V0 inflammability level.
b. Top cover and base should be Ultrasonically/Chemically
welded.
than 10 minutes.
7. Functional Requirement
SN Item Description
Smart meter comply with D3 category of IS 15959
7.1 Meter category
(Part 3).
It should be possible to configure meters in following
modes of metering:
a. Forwarded Only: In this mode any export active
energy shall be treated as import energy and
shall be recorded in forward only register.
Apparent energy calculation in this mode shall
be as per clause no. 6.4.
7.2 Mode of metering
b. Bidirectional: Both Import and export energy
recording shall be applicable in this mode of
metering and relevant registers shall be updated.
Any change in metering mode shall be logged in events
with date and time stamp.
Default mode of metering shall be forwarded only untill
specified in tender requirement otherwise.
Lag only: KVAh is computed based on KVArh and
7.3 KVAH Calculation KWH value. If PF=1, or leading, then KVAh = KWH.
At no instance KVAh < KWh.
profile parameters.
8. Meter Display
SN Item Description
8.1 LCD Type STN Liquid crystal with backlit
a. Minimum 120 Degree.
b. The display visibility should be sufficient to read
the Meter mounted at height of 0.5 m as well as at
8.2 Viewing angle the height of 2 m.
8.3 Size of LCD Minimum 10X5mm
8.4 LCD Digits Total 6+1 digits
8.5 LCD language English
a. Auto Mode
8.6 Display modes b. Manual Mode
c. Sub active mode
deviations.
d. Manufacturer should have
complete tracking of material
used in meter. BRPL reserve the
right to carry out audit of
inventory/ manufacturing
process at manufacturer’s works
and sub vendor’s work.
13.4 Test reports Routine test report to be provided with each meter
The seller shall be responsible for all transit damage due to
13.5 Shipping
improper packing.
Manufacturer instruction shall be followed. Detail handling &
Handling and
13.6 storage instruction sheet /manual to be furnished before
Storage
commencement of supply.
14. Deviations
a. Deviations from this specification can· be acceptable, only
where the Seller has listed in his quotation the requirements
he cannot, or does not, wish to comply with and which
deviations the Buyer has agreed to in writing, before any
14.1 Deviations
order is placed.
b. In the absence of any list of deviations from the Seller, it
will be assumed by the Buyer that the Seller complies with
the Specification fully.
16. Delivery
Despatch of Material: Vendor shall despatch the material, only
after the Routine Tests/Final Acceptance Tests (FAT) of the
16.1 Delivery
material witnessed/waived by the Purchaser, and after receiving
written Material Despatch Clearance (MDC) from the Purchaser.
Integration requirements with communication provider of BRPL/ any other agency designated
by BRPL for other components of AMI.
a. Bidder(s) must share the meter security keys, all level encryption, and password
information along with asset information in a format with the buyer / communication
provider of BRPL so that during AMI business flow, the device and data can be
authenticated all the time.
b. Bidder(s) must share the details of meter communication specifically programmed
protocols.
c. Bidder(s) must share the meter configuration source code to the BRPL/ communication
provider of BRPL.
d. Bidder (s) must share the meter interface touch points for external applications/
systems.
e. Bidder(s) must share the required APIs including but not limited to reading APIs,
configuration APIs and Functional APIs with the System Integrator for execution of
business flow (Installation, reading, configuration).
f. Bidder(s) must share the data storage and retrieval details.
g. Bidder(s) must configure the devices to be upgraded remotely (OTA) and share the
required firmware source code (with updates over the project life) with system
integrator as and when it is required in case of feature request or fault correction.
h. Bidder(s) must follow and conduct Utility’s sample and periodic test program,
including (but not limited to) the selection of a sample population of meters, sharing of
sample test results as reported by the meter testing systems with the system Integrator.
i. Bidder(s) must share the information related to communication module for the
authorization purpose at to BRPL/ communication provider of BRPL.
R Phase high
Current
Meter should log occurrence of
Harmonics
high voltage harmonic event Occurrence: If % THD in Occurrence:
R Phase high
when % THD in voltage of IP>5% of fundamental. 5 Min
Current
phase will be more than Restoration: If % THD in IP Restoration:
Harmonics
threshold value. Threshold <5% of fundamental. 5 Min
R Phase high
value should be factory
Current
Harmonics
3. Power Related Events:
Description of Logic Expression/ Persistence
Logic Of Event
event Threshold values Time
Meter shall detect power OFF if
all phase voltages are absent.
Power OFF
This event shall be recorded at
(occurrence/
the time of each power OFF. At
restoration)
the same time power ON event
shall be recorded.
If meter micro detect power off
Abnormal whereas phase voltage is Occurrence: If voltages at
Power Off present than abnormal power meter power supply<10%
NA
(Occurrence/ will be recorded. Meter sall Vref and Vp>20% vref.
restoration) continue to record energy as per Restoration:
phase voltage and current.
4. Other Events:
Description of Logic Expression/ Persistence
Logic Of Event
event Threshold values Time
a. Meter should either be
immune or should log the
events of attempt of tampering
by external magnetic
Abnormal field as per relevant IS14697/
External CBIP 325 with latest
Magnetic amendments. As per IS
As per IS 14697/ CBIP 325
Influence b. If the working of meter gets 14697
(Occurrence/ affected under the
Restoration) influence of external magnetic
field, meter should
record energy at Imax. Meter
should not compute
MD during this period. The
Index
Record of Revision
Item/Clause Reason of
Change in Specification Approved By Rev
No. Change
1. Scope of Supply
This specification covers the following for Three Phase 63.5 V, AC Static transformer operated
Watt hour and Var Hour smart meters of accuracy class 0.5s/ 0.2s with plug in communication
module (RF mesh only and RF + Cellular technology).
A. Design, manufacture, testing at manufacturer works before dispatch, packing, delivery and
submission of all documentation.
B. Any accessories / hardware required for installation and operation for the meter.
Book
DLMS- Green
2.34 Architecture and protocols to transport the model
Book
DLMS- Yellow
2.35 Conformance testing process
Book
2.36 IEEE 802.15.4 Standard for Local and metropolitan area networks.
Standard for Local and metropolitan area networks (Use of the 865 MHz
2.37 IEEE 802.15.4u
to 867 MHz Band in India)
Order of precedence between different standards shall be as follow:
i Indian Standards Issued By BIS
ii IEC standard
iii Other standards like CBIP, DLMS etc.
3. Service Conditions
SN Item Description
Operation range: -10 Deg C to 55 Deg C
3.1 Temperature Range Limit range of operation: -25 to 60 Deg C
Limit range of storage / transport : -25 to 70 Deg C
3.2 Relative Humidity 0 to 96 %
6. Construction Feature
SN Item Description
6.1 General Construction should be in accordance with IS 16444 (Part 2)
Material - Opaque and UV stabilized polycarbonate of grade
6.2 Base Body LEXAN 143/ 943 or Equivalent with V0 inflammability
level.
a. Material: Transparent/Opaque and UV stabilized
polycarbonate of grade LEXAN 143/ 943 or Equivalent
6.3 Top Cover
with V0 inflammability level.
b. Top cover and base should be Ultrasonically/Chemically
welded.
on top cover.
c. Seals will be issued to manufacturer free of cost.
d. 02 no's polycarbonate seals shall be provided for
communication module.
7. Functional Requirement
SN Item Description
Smart meter comply with D3 category of IS 15959
7.1 Meter category
(Part 3).
a. It should be possible to configure meters in
following modes of metering:
i. Forwarded Only: In this mode any export
active energy shall be treated as import
energy and shall be recorded in forward only
register. Apparent energy calculation in this
7.2 Mode of metering
mode shall be as per clause no. 7.4.
ii. Bidirectional: Both Import and export
energy recording shall be applicable in this
mode of metering and relevant registers
shall be updated.
b. Any change in metering mode shall be logged in
8. Meter Display
SN Item Description
8.1 LCD Type STN Liquid crystal with backlit
a. Minimum 120 Degree.
b. The display visibility should be sufficient to read
the Meter mounted at height of 0.5 m as well as at
8.2 Viewing angle the height of 2 m.
8.3 Size of LCD Minimum 10 X 6mm
8.4 LCD Digits Total 6+1 digits
8.5 LCD language English
a. Auto Mode
b. Manual Mode
Display modes c. Sub active mode
Display list shall be finalized during detailed engineering
8.6 in the event of order.
Appropriate indications/flags for all tampers and self
8.7 Display indications diagnostic features should be provided.
elements.
The Measurement or computing
Analog Devices, Cyrus
Measurement or chips used in the Meter should be
11.2 Logic, Atmel, Phillips,
computing chips with the Surface mount type along
SAMES ,NEC,TEXAS
with the ASICs.
The memory chips should not be Atmel, National
affected by the external parameters Semiconductors, Texas
11.3 Memory chips
like sparking, high voltage spikes or Instruments, Phillips,
electrostatic discharges. ST, Hitachi, Compiled
a. The display modules should
be well protected from the
external UV radiations.
b. The construction of the Hongkong: Genda
modules should be such that Singapore: Bonafied
the displayed quantity should technologies
11.4 Display modules
not disturbed with the life of Korea: Advantek
display (PIN Type). China: Success
c. It should be STN type Japan: Hitachi, Sony
industrial grade with
extended temperature range
min 70 ºC.
The mechanical construction of the USA: National
port should facilitate the data Semiconductors, HP
11.5 Optical port
transfer. Communication shall not Holland/ Korea: Phillips
disturbed by external light. Japan: Hitachi, Ligitek
The power supply should be with the
capabilities as per the relevant
standards. The power supply unit of
the meter should not be affected in
11.6 Power Supply SMPS Type
case the maximum voltage of the
system appears to the terminals due
to faults or due to wrong
connections.
The active & passive components
USA: National
should be of the surface mount type
Semiconductors, Atmel,
& are to be handled & soldered by
Phillips, Texas
Electronic the state of art assembly processes.
11.7 Instruments.
components The PTH components should be
Japan: Hitachi, Oki,
positioned such a way that the leads
AVX or Ricoh
of components should not be under
Korea: Samsung
stress and not touching the internal
wires.
LED Everlight, Agillent
a) The internal electrical
components should be of electrolytic
copper & should be protected from
corrosion, rust etc.
11.8 Mechanical parts
b) The other mechanical components
should be protected from rust,
corrosion etc. by suitable
plating/painting methods.
Lithium with guaranteed life of 15 Texcell, SAFT, Varta,
11.9 Battery
years Tedirun, Sanyo
USA: Philips, Dallas
RTC & Micro The accuracy of RTC shall be as per Atmel, Motorola,
11.10
controller relevant IEC / IS standards Microchip, TEXAS,
Japan: NEC, Oki
Glass Epoxy, fire resistance grade
11.11 P.C.B. FR4, with minimum thickness 1.6 (BBT test is must)
mm
a. The components used by
manufacturer shall have
“Minimum Life” more than the
10 years.
b. Incase vendor want to use other
make components; same shall be
approved by BRPL before use.
c. Even for existing supplier –
11.12 Note fresh approval is needed for all
deviations.
d. Manufacturer should have
complete tracking of material
used in meter. BRPL reserve the
right to carry out audit of
inventory/ manufacturing
process at manufacturer’s works
and sub vendor’s work.
Plan (QP)
Sampling Method for quality checks shall be as per relevant IS/
12.2 Sampling Method IEC/ CBIP guidelines and Purchaser's prior approval shall be
taken for the same.
Inspection Hold-
12.3 To be mutually identified, agreed and approved in Quality Plan.
Points
a. The meter shall be of type tested quality including all tests
specified in this specification which are beyond IS / IEC or
CBIP.
b. Type test conducted from CPRI/ ERDA/ or any other lab
specified by BIS/ CEA for smart meter testing will be
treated as valid.
12.4 Type Tests
c. Type test certificate should be submitted along with offer
for scrutiny.
d. Any other component supplied in addition to meter shall
also be type tested as per IS /IEC if applicable.
e. Complete type test as per IS 16444 (Part 3) shall be carried
out on sample selected from BRPL lot.
12.5 Routine tests All test marked “R” as per table 20 of IS 13779.
a. All tests marked “A” as per table 20 of IS 13779.
b. Smart meter functional tests as per IS 16444 Part 2
c. Test of load switch as per clause 10.4 of IS 16444 (Part 2)
d. Test for data exchange protocol as per clause 10.5 of IS
16444.
e. Test for Smart meter communicability as per clause no. 10.6
of IS 16444 (Part 2).
f. All the routine and acceptance tests shall be carried out as
per relevant standards.
g. Following tests in addition to IS shall be conducted during
lot inspection.
12.6 Acceptance Tests
I) Dimensional and drawing verification.
II) Display parameters/ sequence.
III) Data Downloading from CMRI and PC.
IV) Tamper/ fraud detection/logging features as per
approved documents. Tamper conditions will be
simulated at varying load up to Imax. Accuracy will
also be checked during tamper simulation.
V) Burn in chamber test.
VI) Component verifications.
h. Purchaser reserves the right to formulate any other test
method to verify guaranteed parameters of Meter.
ESD and Magnetic ESD and magnetic interference test will be conducted at Samir
12.7
Interference test lab, Chennai or CPRI.
a. Purchaser reserves the right to inspect /witness all tests on
the meters at Seller’s works at any time, prior to dispatch, to
verify compliance with the specification/ standards.
b. Manufacturer should have all the facilities/ equipments to
conduct all the acceptance tests as per clause 14.3 relevant
12.8 Inspection
standards and tampers logics as per approved GTP. All the
equipments including tamper logs kits/ jigs should be
calibrated.
c. In-process and / or final inspection call intimation shall be
given in advance to purchaser.
14. Deviations
a. Deviations from this specification can· be acceptable, only
where the Seller has listed in his quotation the requirements
he cannot, or does not, wish to comply with and which
deviations the Buyer has agreed to in writing, before any
14.1 Deviations
order is placed.
b. In the absence of any list of deviations from the Seller, it
will be assumed by the Buyer that the Seller complies with
the Specification fully.
16. Delivery
Despatch of Material: Vendor shall despatch the material, only
after the Routine Tests/Final Acceptance Tests (FAT) of the
16.1 Delivery
material witnessed/waived by the Purchaser, and after receiving
written Material Despatch Clearance (MDC) from the Purchaser.
Bidder shall furnish the GTP format with all details against each clause of this specification.
Bidder shall not change the format of GTP or clause description.
Bidder to submit duly filled GTP in hard copy format with company seal.
High harmonic in
Meter should occurrence of
R Phase Voltage Occurrence: If %THD in Occurrence: 5
high harmonic in voltage if %
High harmonic in Voltage>=5% Min
THD in voltage of any phase
Y Phase Voltage Restoration: If %THD in Restoration: 5
shall be more than a threshold
High harmonic in Voltage<5% Min
value.
in B Phase
Voltage
4. Other Events:
Description of Logic Expression/ Threshold Persistence
Logic Of Event
event values Time
Operation
(occurrence/
Restoration)
Plug in
Communication Meter should log the removal
module removal of communication card. Meter
(Occurrence/ should also log insertion of
Restoration) communication card. By NC switch/ sensor
Configuration
change to post- Meter should log the change
paid mode/ pre- in payment mode
paid mode configuration.
Configuration
change to
“Forwarded” only" Meter should log the change
mode/ “Import and in metering mode
Export” mode configuration.
Overload
(Occurrence/ Meter should able to log the
Restoration) status of overload in KW
HV Spark
(Occurrence/ On detection of HV spark
restoration)
Meter should log the
Terminal Cover
occurrence and restoration of By NC switch/ sensor
Open
terminal cover.
Meter should log the event if
Occurrence: 5
difference between
Min
Distorted PF displacement PF and actual
Restoration: 5
PF is more than a threshold
Min
value
Meter should log voltage,
Time based event current, PF and energy
As per predefined time NA
stamp consumption on a predefined
time
Event Description
Occurrence of cover open
Detail of Transaction
Real Time Clock- Date and Time
Demand Integration Period
Profile Capture Period
Single Action schedule for billing date
Activity calendar for time zones
New firmware activated
Load Limit (Kw) Set
Enable Load Limit Function
Disable load limit function
LLS secret (MR) change
HLS key (US) change
HLS key (FW) change
Global key change
ESWF change
MD reset
Note:
1. Event ID’s shall be defined as per BRPL specification/ IS 155959 (part 2).
Approval shall be taken from BRPL prior to manufacturing for Event ID’s
2. Programming of threshold values should be possible from remote via proper
authentications.
3. Logics of tampers can be changed/ upgraded via firmware up gradation from
remote via proper authentication.
4. All the programming changes/ firmware up gradations shall be logged along-with
date and time stamp in meter as well as on HES.
Index
Record of Revision
Item/Clause Reason of
Change in Specification Approved By Rev
No. Change
1. Scope of Supply
This specification covers the following for Three Phase 240 V, 5A-10A AC Static transformer
operated Watt hour and Var Hour smart meters of accuracy class 0.5s with plug in communication
module (RF mesh only and RF + Cellular technology).
Design, manufacture, testing at manufacturer works before dispatch, packing, delivery and
A.
submission of all documentation.
B. Any accessories / hardware required for installation and operation for the meter.
DLMS- Green
2.34 Architecture and protocols to transport the model
Book
DLMS- Yellow
2.35 Conformance testing process
Book
2.36 IEEE 802.15.4 Standard for Local and metropolitan area networks.
Standard for Local and metropolitan area networks (Use of the 865 MHz
2.37 IEEE 802.15.4u
to 867 MHz Band in India)
Order of precedence between different standards shall be as follow:
i Indian Standards Issued By BIS
ii IEC standard
iii Other standards like CBIP, DLMS etc.
3. Service Conditions
SN Item Description
Operation range: -10 Deg C to 55 Deg C
3.1 Temperature Range Limit range of operation: -25 to 60 Deg C
Limit range of storage / transport : -25 to 70 Deg C
3.2 Relative Humidity 0 to 96 %
0.5mT+/-5%
o. Alternating (AC) “abnormal’ magnetic induction of
10mT.
p. External magnetic field 0.5 T
q. Electromagnetic HF fields
r. Radio frequency interference
s. DC immunity test
Note: BRPL reserves the right to formulate any other test
method to check magnetic immunity/ logging of meter.
Meter with logging provision will be preferred.
6. Construction Feature
SN Item Description
Material - Opaque and UV stabilized polycarbonate of grade
6.1 Base Body LEXAN 143/ 943 or Equivalent with V0 inflammability
level.
a. Material: Transparent/Opaque and UV stabilized
polycarbonate of grade LEXAN 143/ 943 or Equivalent
6.2 Top Cover with V0 inflammability level.
b. Top cover and base should be Ultrasonically/Chemically
welded.
a. Material - Flame retardant glass filled polycarbonate of
grade 500 R or equivalent.
b. Terminal block shall be capable of passing the tests as per
6.3 Terminal Block ISO-75 for a temperature of 135C and pressure of
1.8MPa. The terminals shall be designed so as to ensure
adequate and durable contact such that there is no risk of
loosening or undue heating.
a. Material - UV stabilized transparent/Opaque
polycarbonate cover
b. Provision of sealing at two points through sealing screw.
c. The sealing screws shall be held captive in the terminal
cover.
d. The terminal cover shall be extended type with baffle wall
6.4 Terminal cover
above the cable entry base wall so that access to the
terminals is not possible (even with thin metallic wire)
without breaking the seal. Terminal cover should have
provision for cable entry from bottom.
e. Diagram of external connections should be embossed on
terminal cover. Sticker is not acceptable.
7. Functional Requirement
SN Item Description
Smart meter comply with D4 category of IS 15959
7.1 Meter category
(Part 3).
Mode of metering shall be bidirectional i.e. both import
and export recording shall be done.
7.2 Mode of metering
No change in metering mode shall be possible either by
remote or local.
7.3 KVAH Calculation Lag+Lead
Block / sliding window with default demand integration
period of 1800 s configurable to 900 s as per
requirement. Meter should be configurable for block/
7.4 MD calculation
sliding window at the time of manufacturing. This
change should not be possible in the field. Extended
register shall be used for MD recording.
a. Meter shall be capable of doing TOD metering
in minimum 4 tariff rate registers programmable
for minimum 8 time zones and 4 seasonal
profiles.
b. TOU metering shall be implemented by the
activity colander method of IS 15959 Part 1
clause 9/ DLMS UA-1000-1
c. Special Day table shall be defined as per IEC/
7.5 TOU Metering
DLMS UA-1000-1
d. Default TOU programming shall be as per latest
DERC guidelines. Prior approval shall also be
taken from BRPL for the same.
e. Tariff rate registers shall be as follow
R1: Rate register for Peak
R2: Rate register for Normal
R3: Rate Register for Off Peak
a. GPS coordinates.
7.10.2.1 Association rights As per Clause no. 26.2 of IS 15959 (Part 3).
a. Smart meter is able to automatically notify data,
event, and messages to a destination client
system in an unsolicited manner (without a
request from a client) as per clause no 6 of IS
15959 (Part 2).
b. Randomization: Data from different endpoints
shall be pushed intelligently on the network in
order to avoid excessive traffic on the network
for example in case all the endpoints will push
load survey data simultaneously, then it may
result in network choking or inefficient
performance. Therefore with the help of
intelligent techniques such field scenarios shall
7.10.3 Push Services
be handled effectively.
c. It shall also be possible to configure push
services for all profiles i.e instantaneous, billing,
load survey, daily energy and events. Bidder
should explain its capability to configure push
services. However following push services shall
be available by default.
i. Load survey profile data at after every 4
hours configurable to any predefined
interval.
ii. Mid night data at 00:00 hrs of every day.
iii. Billing profile data on occurrence of
billing.
a. Meter shall be able to push instantaneous
parameters to HES at predefined intervals.
Parameters required for push shall be intimated
during detailed engineering in the vent of order.
Periodic push (Smart meter to
7.10.3.1 b. Other attributes as per IS 15959 (Part 3) i.e.
HES)
Send Destination, Communication window,
Randomization time interval, number of retries
and repeat delay shall be decided in the event of
manufacturing.
8. Meter Display
SN Item Description
8.1 LCD Type STN Liquid crystal with backlit
a. Minimum 120 Degree.
b. The display visibility should be sufficient to read
Viewing angle
the Meter mounted at height of 0.5 m as well as at
8.2 the height of 2 m.
8.3 Size of LCD Minimum 10X5mm
8.4 LCD Digits Total 6+1 digits
8.5 LCD language English
b. Name of purchaser’s
c. Communication technology with carrier frequency
d. Manufacturing year and month.
e. Warranty period.
connections.
14. Deviations
SN Item Description
a. Deviations from this specification can· be acceptable, only
where the Seller has listed in his quotation the requirements
he cannot, or does not, wish to comply with and which
deviations the Buyer has agreed to in writing, before any
14.1 Deviations
order is placed.
b. In the absence of any list of deviations from the Seller, it
will be assumed by the Buyer that the Seller complies with
the Specification fully.
16. Delivery
Despatch of Material: Vendor shall despatch the material, only
after the Routine Tests/Final Acceptance Tests (FAT) of the
16.1 Delivery
material witnessed/waived by the Purchaser, and after receiving
written Material Despatch Clearance (MDC) from the Purchaser.
Bidder shall furnish the GTP format with all details against each clause of this specification.
Bidder shall not change the format of GTP or clause description.
Bidder to submit duly filled GTP in hard copy format with company seal.
Integration requirements with communication provider of BRPL/ any other agency designated
by BRPL for other components of AMI.
a. Bidder(s) must share the meter security keys, all level encryption, and password
information along with asset information in a format with the buyer / communication
provider of BRPL so that during AMI business flow, the device and data can be
authenticated all the time.
b. Bidder(s) must share the details of meter communication specifically programmed
protocols.
c. Bidder(s) must share the meter configuration source code to the BRPL/
communication provider of BRPL.
d. Bidder (s) must share the meter interface touch points for external applications/
systems.
e. Bidder(s) must share the required APIs including but not limited to reading APIs,
configuration APIs and Functional APIs with the System Integrator for execution of
business flow (Installation, reading, configuration).
f. Bidder(s) must share the data storage and retrieval details.
g. Bidder(s) must configure the devices to be upgraded remotely (OTA) and share the
required firmware source code (with updates over the project life) with system
integrator as and when it is required in case of feature request or fault correction.
h. Bidder(s) must follow and conduct Utility’s sample and periodic test program,
including (but not limited to) the selection of a sample population of meters, sharing of
sample test results as reported by the meter testing systems with the system Integrator.
i. Bidder(s) must share the information related to communication module for the
authorization purpose at to BRPL/ communication provider of BRPL.
Plug in
Communication Meter should log the removal
module of communication card.
removal Meter should also log
(Occurrence/ insertion of communication
Restoration) card. By NC switch/ sensor
Configuration
change to post- Meter should log the change
paid mode/ pre- in payment mode
paid mode configuration.
Configuration
change to
“Forwarded”
only" mode/ Meter should log the change
“Import and in metering mode
Export” mode configuration.
Overload
(Occurrence/ Meter should able to log the
Restoration) status of overload in KW
Meter with communication
HV Spark
card should be immune or
(Occurrence/
log the event in the case of Immediately NA
restoration)/
application of ESD upto and
Jammer
including 35 KV.
Meter shall log DO alarms as
DO alarms NA NA
configured by user
Meter shall log the event if
Occurrence: 5
difference between
Min
Distorted PF displacement PF and actual
Restoration: 5
PF is more than a predefined
Min
value
Meter shall log voltage,
Time Based current, PF and energy
As per predefined time NA
Event Stamp consumption on a predefined
time
5. Non Roll over events:
Event Description