Risk and Opportunity Assessment 1564904566
Risk and Opportunity Assessment 1564904566
Risk and Opportunity Assessment 1564904566
of strategic KPIs / Project benefits will Key Account customer Civil action, refer Financial external provider, procured outside the stakeholders.
not be achieved. Inability to deliver shutdowns. Performance. Projects > 40 % of different from existing in- country Sustained state and national
critical processes/ services or project No impact in the enhancement Not related to any Compliance budget house external provider adverse media/ social media
schedule elements. of Obligation coverage.
No relevance Strategic Direction of product or service quality or MD Intervention
COMPANY customer satisfaction
Multiple Strategic initiatives /Project Customer/Community Regulator issues notices, Corporate Financial Action will require Raw material/ equipment/ Medium term (01 month) loss of
outcomes will not be achieved. disruption >10 hours. corrective action order and/or losses 0.5 million. additional local external service needs to be confidence among key
Breach of multiple strategic KPIs / Project Individual Key Account penalties, common law provider, different from procured within the stakeholders.
MAJOR (4)
benefits. customer shutdown. liability confirmed. Projects > 20% -40% of existing in-house external country Short term state and/or national
Disruption to multiple critical Indirect effect in the Order to stop work. budget provider adverse media/ social coverage.
processes/services or Project schedule enhancement of customer Prohibition notice. MD Intervention
elements. satisfaction/ product and/ or Breach of Code of Conduct
Relevant to one (01) of COMPANY’s service quality resulting in dismissal.
Strategic Direction
One specific Strategic initiative/ Project Customer/Community Regulator/ external auditor Corporate Financial Action will require Raw material/ equipment/ Short term (01 week) loss of
MODERATE (3)
outcome will not be achieved. disruption >5 hours. issues improvement notice, losses AED 0.1 million. additional in-house service needs to be confidence among some key
Breach of Strategic KPI/ Project benefit. No Key Account customer multiple manpower resources procured locally stakeholders.
Disruption to individual critical disruption. non-conformances or PNC. Projects >10% -20% of Adverse widespread community
process/service or Project schedule Direct impact in the Systemic breach of internal budget. Concern
element. enhancement of product or obligation, procedure or Short-term local adverse media/
Relevant to two (02) of the COMPANY’s service quality or customer policy. social media coverage.
strategic directions satisfaction GM Intervention
Impairment in achieving Strategic Customer/Community Regulator/external auditor Corporate Financial Action will make use Raw material/ equipment/ Minimal stakeholder interest/
initiative/ Project outcome. disruption >1 hour. ‘nonconformance’ losses AED 0.05 of existing in-house service is concern.
Strategic KPI / Project benefit impacted - No Key Account customer or request for further million. manpower resources currently available in the Adverse localized community
MINOR (2)
initiative / Project outcome. disruption expected. Financial losses. manpower resources is material/ equipment/ Notification of potential adverse
No material impact or breach of event < 1 hour. Individual breach of internal required service is required media/ social media coverage.
(1)
Strategic KPIs/ Project benefit. Direct impact in the policy or procedure. Staff Intervention
No material disruption expected. enhancement of product or No civil action expected.
service quality and customer
satisfaction
IMPACT
OPPORTUNITIES RISKS
LIKELIHOOD EXTREME MAJOR MODERATE MINOR INCIDENTAL INCIDENTAL MINOR MODERATE MAJOR EXTREME
FREQUENT (5)
LIKELY (4)
POSSIBLE (3)
UNLIKELY (2)
RARE (1)
TABLE 5: Occurrence of the Risk Event and/ or the Severity of Consequences (Degree of Control)
OCCURRENCE RATING
ALMOST DEGREE OF CONTROL SEVERITY RATING
RARE (1) UNLIKELY (2) POSSIBLE (3) LIKELY (4)
CERTAIN (5)
1 2 3 4 5 AVOIDABLE (1)
2 4 6 8 10 HIGH CONTROLLABLE (2)
3 6 9 12 15 MODERATELY CONTROLLABLE (3) INCIDENTAL (1)
4 8 12 16 20 UNCONTROLLABLE (4)
5 10 15 20 25 HIGHLY UNCONTROLLABLE (5)
2 4 6 8 10 AVOIDABLE (1)
MINOR (2)
4 8 12 16 20 HIGH CONTROLLABLE (2)
6 12 18 24 30 MODERATELY CONTROLLABLE (3)
8 16 24 32 40 UNCONTROLLABLE (4)
10 20 30 40 50 HIGHLY UNCONTROLLABLE (5)
3 6 9 12 15 AVOIDABLE (1)
6 12 18 24 30 HIGH CONTROLLABLE (2)
9 18 27 36 45 MODERATELY CONTROLLABLE (3) MODERATE (3)
12 24 36 48 60 UNCONTROLLABLE (4)
15 30 45 60 75 HIGHLY UNCONTROLLABLE (5)
4 8 12 16 20 AVOIDABLE (1)
8 16 24 32 40 HIGH CONTROLLABLE (2)
12 24 36 48 60 MODERATELY CONTROLLABLE (3) MAJOR (4)
16 32 48 64 80 UNCONTROLLABLE (4)
20 40 60 80 100 HIGHLY UNCONTROLLABLE (5)
5 10 15 20 25 AVOIDABLE (1)
10 20 30 40 50 HIGH CONTROLLABLE (2)
15 30 45 60 75 MODERATELY CONTROLLABLE (3) EXTREME (5)
20 40 60 80 100 UNCONTROLLABLE (4)
25 50 75 100 125 HIGHLY UNCONTROLLABLE (5)
EXCELLENT A1 B1 C1
OPPORTUNITY ASSESSMENT
FAIR A2 B2 C2
(60-89) Low-Risk/Fair Opportunity Moderate Risk/Fair Opportunity High-Risk/Fair Opportunity
POOR A3 B3 C3
(30-59) Low-Risk/ Poor Opportunity Moderate Risk/Poor Opportunity High-Risk/Poor Opportunity
RISK ASSESSMENT
LEGENDS:
A1 - Pursue opportunity, no RTAP required
A2 - Top Management to decide whether to pursue opportunity, no RTAP required
A3 - Do not pursue opportunity, no RTAP required
B1 - Pursue opportunity but needs RTAP aimed at least to reduce likelihood of the risk event occurring and/ or mitigate the adverse impact
B2 - RTAP required and Top Management to decide whether to pursue opportunity
B3 - Do not pursue opportunity but needs RTAP aimed at least to reduce likelihood of the risk event occurring and/ or mitigate the adverse impact
C1 - Pursue opportunity but implement RTAP aimed at avoiding the risk/ eliminating the risk source
C2 - RTAP required aimed at avoiding the risk/ eliminating the risk source and Top Management to decide whether to pursue opportunity
C3 - Do not pursue opportunity but implement RTAP aimed at avoiding the risk/ eliminating the risk source
GREEN - 1
(OR ≥ 90) – Excellent Opportunity shall be pursued immediately
Opportunity
ORANGE - 2
Management to decide whether to pursue opportunity
(60 < OR < 89) – Fair Opportunity
RED - 3
(30 < OR < 59) – Poor Opportunity shall not be pursued
Opportunity