• FABRICATOR is to fully test and commission the Grout Packer Inflation System, Pile Gripper
System together with air lines, grout lines and flooding lines and flooding
lines at the yard and to be witnessed by the CONTRACTOR.
• The Quick Connect Panel (QCP) for the grout packer & pile gripper inflation should
be accessible by the walkway on jacket sea deck to jacket leg B3.
BOAT LANDING
• Check boatlanding pre-installed rigging make-up, arrangement, ID and tie-down (if
any)
5
• Check any potential interference when installing boatlanding to jacket.
• Boat landing trail fit shall be performed by FABRICATOR and witnessed by
CONTRACTOR.
6 BOAT LANDING-POST LOADOUT
• Witness MPI padeyes and shackles after lifting (if required)
• Check for damages during loadout.
• Check and inspect lifting riggings after lifting.
7 JACKET POST LOADOUT
• Check all sea fastenings.