GROUP 4 MECHATRONICS SYSTEM

1. ALL ACTUATORS SPEED ARE SLOW


ö Boom, Arm, Bucket, Swing and travel speed are slow, but engine speed is good.
ö Spec : P-mode 1950 Ü 50 rpm S -mode 1750 Ü 50 rpm E-mode 1600 Ü 50 rpm
ö Before carrying out below procedure, check all the related connectors are properly inserted and
fault code on the cluster.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective
YES Check pressure hydraulic system
at EPPR valve
NO Check electric Defective Replace
current at EPPR SPEC : 5~20 kgf/cm2
NO
EPPR valve
valve See TEST 3

SPEC : 100~700 mA
See TEST 2
Defective MCU Replace
Check if HCESPN NO
140 active fault
display on the LCD YES
Short circuit or Check & repair
poor connection wire harness or
between CN-53 between CN-53
Check resistance
YES at EPPR valve -CN-75 -CN-75

SPEC : 15~25̫(20ÁC) Defective EPPR Replace


See TEST 1 NO
valve

Wiring diagram

MCU
FUSE
4
NO.10
8

14 PUMP EPPR VALVE

7 1

18 8 2

CN-53 CN-1 CN-75

21096MS01

6-40
2) TEST PROCEDURE SPEC : 15~25̫(20˚C)
(1) Test 1 : Check resistance at connector
CN-75. CN-75
Η Starting key OFF.
Θ Disconnect connector CN-75 from EPPR Multimeter
valve at main hydraulic pump.
Ι Check resistance between 2 lines as
figure.
EPPR valve

Main pump

2107A5MS15

(2) Test 2 : Check electric current at EPPR Spec : 100~700 mA


valve.
Adapter(P/no.:21Q6-50410)
Η Disconnect connector CN-75 from EPPR
valve. CN-75
Multimeter
Θ Insert the adapter to CN-75 and install
multimeter as figure.
Ι Start engine.
Κ Set S-mode and cancel auto decel
EPPR valve
mode.
Λ Position the accel dial at 10.
Μ If tachometer show approx 1750Ü50 rpm
disconnect one wire harness from EPPR Main pump
valve.
Ν Check electric current at bucket circuit
relief position. 21095MS21

(3) Test 3 : Check pressure at EPPR valve. Spec : 2~25 kgf/cm2 (30~350 psi)
Η Remove plug and connect pressure
gauge as figure.
Pressure adjusting
ÂGauge capacity : 0 to 50 kgf/cm2 screw locknut
Pilot pressure
(0 to 710 psi) CN-75
supply line
Θ Start engine.
Ι Set S-mode and cancel auto decel
mode.
Κ Position the accel dial at 10.
EPPR valve
Λ If tachometer show approx 1750Ü50 rpm
check pressure at relief position of bucket
circuit by operating bucket control lever. Main pump
Μ If pressure is not correct, adjust it.
Ν After adjust, test the machine. 2107A5MS13

6-41
2. ENGINE STALL
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Not enough Check engine
engine power fault
YES Check pressure Contact cummins
at EPPR valve

SPEC:5~20 kgf/cm2 Defective EPPR Replace


See TEST 5 NO
Check electric valve
current at EPPR
valve
YES
Short circuit or Check and repair
SPEC : 100~700 mA poor connection wire harness
See TEST 4
Check resistance between
between CN-53 - CN-75
NO at EPPR valve

SPEC : 15~25̫(20˚C)
See TEST 1
NO
Defective EPPR Replace
valve

Wiring diagram

MCU
FUSE
4
NO.10
8

14 PUMP EPPR VALVE

7 1

18 8 2

CN-53 CN-1 CN-75

21096MS01

6-42
2) TEST PROCEDURE SPEC : 100~700 mA
(1) Test 4 : Check electric current at EPPR Adapter(P/no.:21Q6-50410)

valve at S-mode CN-75


Η Install multimeter as figure. Multimeter
Θ Start engine.
Ι Set the accel dial at "10" (max)
Κ Set S-mode with 1750Ü50 rpm.
ΛCheck electric current. EPPR valve

Main pump

21095MS21

(2) Test 5 : Check pressure at EPPR valve at SPEC : 2~25 kgf/cm2 (30~350 psi)
S-mode Pressure adjusting
Η Connect pressure gauge at EPPR valve. Pilot pressure
screw locknut
CN-75
supply line
Θ Start engine.
Ι Set the accel dial at "10" (max)
Κ Set S-mode with 1750Ü50 rpm.
Λ Operate bucket lever completely push or
pull. EPPR valve
Μ Hold arm lever at the end of stroke.
ΝCheck pressure at relief position.
Main pump

2107A5MS13

6-43
3. MALFUNCTION OF CLUSTER OR MODE SELECTION SYSTEM
· Fault code : HCESPN 840, FMI 2
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
No power supply to Check fuse No.3
See if all lamps the MCU
YES off in the MCU
case YES
Y R G MCU failure Replace
Y R G
See if HCESPN
840 active fault NO
display on the LCD
NO Y R G

NO

OK
Check connection Cluster failure Replace
between CN-51
ⓐ (33) - CN-56(4) or
CN-51(23) -
CN-56(8) No connection Check and repair
NO
KEY OFF

Wiring diagram

CLUSTER MCU
BATT. 24V
SIG_3
GND
TX 4 1 33
IG 24V 8 2 23
SIG_2
CN-56 CN-5 2
CAMERA SIG
RX CN-51

FUSE

NO.3
21096MS03

6-44
4. MALFUNCTION OF ACCEL DIAL
· Fault code : HCESPN 714, FMI 3 or 4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

YES
Open circuit or Replace or repair
poor connection
YES Check voltage between CN-16
between CN-16
(2) -CN-52 (21)
(2)-GND
Check voltage
between YES Check voltage Spec : actuator operating
NO
Open circuit or Replace or repair
CN-52(21)-GND between 1~5V poor connection
CN-7(15)-GND between CN-7
Spec : actuator operating (15) -CN-16 (2)
1~5V Spec : actuator operating
1~5V YES
See TEST 6 Check resistance Defective accel Replace
between dial
NO CN-142(B)- CN-52
Check voltage CN-7(15) Open circuit or Replace or repair
NO
between Spec : 0Ω poor connection
NO between CN-142 21
CN142(A)-(C)
(B) -CN-7 (15)
Spec : 5V
YES
Open circuit or Replace or repair
poor connection MCU
between CN-142
(A) -CN-7 (14) or ACCEL DIAL
Check voltage CN-142 (C )- + A 14 3 6
between CN-7 (16) B
NO CN-7(14)-(16) S 15 2 7
YES
- C 16 1
Open circuit or Replace or repair
Spec : 5V poor connection CN-142
between CN-7 CN-7 CN-16 CN-51
Check voltage (14) -CN-16 (3) or
NO
between CN-16 CN-7 (16 )-
(1)-(3) CN-16 (1)
Spec : 5V
Open circuit or Replace or repair
NO poor connection
between CN-16
(3) -CN-51 (6) or
CN-16 (1 )-
CN-51 (7)

21096MS04

6-45
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 6 : Check voltage at CN-52(21) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper.
MCU
Θ Insert prepared pin to rear side of PIN
connectors : One pin to (21) of CN-52. CN-51 CN-52 CN-53

Ι Starting key ON.


Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
30 21

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter
21096MS04A

6-46
5. AUTO DECEL SYSTEM DOES NOT WORK
· Fault code : HCESPN 105, FMI 0~4 (work pressure sensor)
HCESPN 108, FMI 0~4 (travel oil pressure sensor)
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Defective travel Replace
Check voltage
NO pressure switch
between CD-6(A)
and (C)
Short circuit or poor Replace or repair
NO
Check voltage SPEC : connection
between CN-52 Key ON : 24±2V between CN-51(4)-
(26)-GND and CD-6(A) and / or
CN-52(35)-GND CN-51(5)-CD-6(C)
(fault code 108
SPEC :
Actuator operating : 1~5V
displayed)
See TEST 7, 8 YES
Defective work Replace
Check voltage
pressure sensor
between CD-7(A)
NO and (C)
Short circuit or poor Replace or repair
NO
SPEC : connection
Key ON : 24±2V between CN-51(4)-
CD-7(A) and / or
CN-51(5)-CD-7(C)
(fault code 105
displayed)

Wiring diagram

CN-51
CD-6
4 A SUPPLY
B SIG
5 C RETURN
TRAVEL PRESSURE SENSOR
MCU

26 CD-7
A SUPPLY
35 B SIG
C RETURN
CN-52 WORK PRESSURE SENSOR

21096MS05

6-47
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 7 : Check voltage at CN-52(26) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
MCU
copper.
PIN
Θ Insert prepared pin to rear side of CN-51 CN-52 CN-53

connectors : One pin to (26) of CN-52.


Ι Starting key ON.
Κ Check voltage as figure.
(2) Test 8 : Check voltage at CN-52(35)and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
10 9 8 7 6 5 4 3 2 1
copper CN-52
Θ Insert prepared pin to rear side of 20
26
11 Female
30 21
connectors : One pin to (35) of CN-52.
40 39 38 37 36 34 33 32 31
Ι Starting key ON.
Κ Check voltage as figure. GROUND

Multimeter

10 9 8 7 6 5 4 3 2 1
CN-52
20 11 Female
30 21
35

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter
21096MS05A

6-48
6. MALFUNCTION OF PUMP 1 PRESSURE SENSOR
· Fault code : HCESPN 120, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(3)-GND (29)-CN-1(3)
Check voltage SPEC : Detective P1 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(29) - GND YES between Short circuit or Replace or repair
SPEC : CD-42(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(3)-
See TEST 9 SPEC :
Key ON : 24±2V CD-42(B)

Check voltage Short circuit or Replace or repair


NO
between poor connection
NO CN-1(2)-(4) between
CD-42(A)-CN-1(2)
SPEC :
Key ON : 24±2V
or CD-42(C)-
CN-1(4)

Short circuit or Replace or repair


NO poor connection
between CN-1(2)-
CN-51(4) or CN-1
(4) - CN-51(5)

Wiring diagram

CN-51
CD-42
4 2 A SUPPLY
3 B SIG
5 4 C RETURN
PUMP 1 PRESSURE SENSOR
CN-1
MCU

29

CN-52

21096MS06

6-49
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 9 : Check voltage at CN-52(29) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (29) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
29
30 21

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS06A

6-50
7. MALFUNCTION OF PUMP 2 PRESSURE SENSOR
· Fault code : HCESPN 121, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(1)-GND (38)-CN-1(1)
Check voltage SPEC : Detective P2 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(38) - GND YES between Short circuit or Replace or repair
SPEC : CD-43(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(1)-
See TEST 10 SPEC :
Key ON : 24±2V CD-43(B)

Check voltage Short circuit or Replace or repair


NO
between poor connection
NO CN-1(2)-(4) between
CD-43(A)-CN-1(2)
SPEC :
Key ON : 24±2V
or CD-43(C)-
CN-1(4)

Short circuit or Replace or repair


NO poor connection
between CN-1(2)-
CN-51(4) or CN-1
(4) - CN-51(5)

Wiring diagram

CN-51
CD-43
4 2 A SUPPLY
1 B SIG
5 4 C RETURN
PUMP 2 PRESSURE SENSOR
CN-1
MCU

38

CN-52

21096MS07

6-51
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 10 : Check voltage at CN-52(38) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (38) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
30 21
38

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS07A

6-52
8. MALFUNCTION OF PUMP 3 PRESSURE SENSOR
· Fault code : HCESPN 125, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(5)-GND (36)-CN-1(5)
Check voltage SPEC : Detective P3 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(36) - GND YES between Short circuit or Replace or repair
SPEC : CD-44(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(5)-
See TEST 11 SPEC :
Key ON : 24±2V CD-44(B)

Check voltage Short circuit or Replace or repair


NO
between poor connection
NO CN-1(2)-(4) between
CD-44(A)-CN-1(2)
SPEC :
Key ON : 24±2V
or CD-44(C)-
CN-1(4)

Short circuit or Replace or repair


NO poor connection
between CN-1(2)-
CN-51(4) or CN-1
(4) - CN-51(5)

Wiring diagram

CN-51
CD-44
4 2 A SUPPLY
5 B SIG
5 4 C RETURN
PUMP 3 PRESSURE SENSOR
CN-1
MCU

36

CN-52

21096MS08

6-53
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 11 : Check voltage at CN-52(36) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (36) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
30 21
36

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS08A

6-54
9. MALFUNCTION OF NEGATIVE 1 PRESSURE SENSOR
· Fault code : HCESPN 123, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective N1 Replace or repair
(37) - GND pressure sensor
SPEC : Short circuit or Replace or repair
Actuator operating: 1~5V Check voltage poor connection
See TEST 12 between CD-70 between CN-52
NO (A)-(C) (37)-CD-70 (B)
SPEC :
Key ON : 24±2V
Short circuit or Replace or repair
NO
poor connection
between CD-70
(A)-CN-51(4) or
CD-70(C)- CN-51
(5)

Wiring diagram

CN-51
CD-70
4 A SUPPLY
B SIG
5 C RETURN
NEGATIVE 1 PRESSURE SENSOR
MCU

37

CN-52

21096MS09

6-55
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 12 : Check voltage at CN-52(37) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (37) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
30 21
37

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS09A

6-56
10. MALFUNCTION OF NEGATIVE 2 PRESSURE SENSOR
· Fault code : HCESPN 124, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective N2 Replace or repair
(27) - GND pressure sensor
SPEC : Short circuit or Replace or repair
Actuator operating: 1~5V Check voltage poor connection
See TEST 13 between CD-71 between CN-52
NO (A)-(C) (27)-CD-71 (B)
SPEC :
Key ON : 24±2V
Short circuit or Replace or repair
NO
poor connection
between CD-71
(A)-CN-51(4) or
CD-71(C)- CN-51
(5)

Wiring diagram

CN-51
CD-71
4 A SUPPLY
B SIG
5 C RETURN
NEGATIVE 2 PRESSURE SENSOR
MCU

27

CN-52

21096MS10

6-57
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 13 : Check voltage at CN-52(27) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (27) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 27 11
30 21

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS10A

6-58
11. MALFUNCTION OF SWING PRESSURE SENSOR
· Fault code : HCESPN 135, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective swing Replace or repair
(24) - GND pressure sensor
SPEC : Short circuit or Replace or repair
Actuator operating: 1~5V Check voltage poor connection
See TEST 14 between CD-24 between CN-52
NO (A)-(C) (24)-CD-24 (B)
SPEC :
Key ON : 24±2V
Short circuit or Replace or repair
NO
poor connection
between CD-24
(A)-CN-51(4) or
CD-24(C)- CN-51
(5)

Wiring diagram

CN-51
CD-24
4 A SUPPLY
B SIG
5 C RETURN
SWING PRESSURE SENSOR
MCU

24

CN-52

21096MS11

6-59
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 14 : Check voltage at CN-52(24) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (24) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
24
30 21

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS11A

6-60
12. MALFUNCTION OF ARM IN/OUT & BUCKET IN PRESSURE SENSOR
· Fault code : HCESPN 133, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective arm in/ Replace or repair
(25) - GND out & bucket in
SPEC : pressure sensor
Actuator operating: 1~5V Check voltage Short circuit or Replace or repair
See TEST 15 between CD-35 poor connection
NO (A)-(C) between CN-52
(25)-CD-35 (B)
SPEC :
Key ON : 24±2V
Short circuit or Replace or repair
NO
poor connection
between CD-35
(A)-CN-51(4) or
CD-35(C)- CN-51
(5)

Wiring diagram

CN-51
CD-35
4 A SUPPLY
B SIG
5 C RETURN
ARM IN/OUT & BUCKET IN
PRESSURE SENSOR
MCU

25

CN-52

21096MS12

6-61
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 15 : Check voltage at CN-52(25) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (25) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
25
30 21

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS12A

6-62
13. MALFUNCTION OF BOOM UP PRESSURE SENSOR
· Fault code : HCESPN 127, FMI 0~4
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective boom up Replace or repair
(23) - GND pressure sensor
SPEC : Short circuit or Replace or repair
Actuator operating: 1~5V Check voltage poor connection
See TEST 16 between CD-32 between CN-52
NO (A)-(C) (23)-CD-32 (B)
SPEC :
Key ON : 24±2V
Short circuit or Replace or repair
NO
poor connection
between CD-32
(A)-CN-51(4) or
CD-32(C)- CN-51
(5)

Wiring diagram

CN-51
CD-32
4 A SUPPLY
B SIG
5 C RETURN
BOOM UP PRESSURE SENSOR
MCU

23

CN-52

21096MS13

6-63
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 16 : Check voltage at CN-52(23) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (23) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
23
30 21

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS13A

6-64
14. MALFUNCTION OF POWER MAX
· Fault code : HCESPN 166, FMI 5 or 6
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Short circuit or poor Repair or replace
connection between
YES Check resistance CN-88(1)-CN-52 (7)
between CN-88
(1)-(2)
Defective power
NO
YES Check resistance SPEC: 15-35Ω max. solenoid valve Repair or replace
between CN-53 See TEST 18 Check hydraulic
(30)-GND
system

Is voltage between Short circuit or poor Repair or replace


NO
CN-88(2)-GND connection between
SPEC : Power max button pressed ON : 0Ω
normal? Power max button released OFF : ∞ Ω CN-53(30)-CS-29
SPEC
KEY ON : 24±1V
KEY OFF : 0V Short circuit or poor Repair or replace
See TEST 17 NO
connection between
CN-88(2)-
Fuse No. 28

Wiring diagram

MCU
CN-88
7 1

2
CN-52
POWER MAX SOLENOID

30 5
FUSE
6
NO.28
CN-53 CN-4
CS-29
1
2

POWER MAX SWITCH

21096MS14

6-65
2) TEST PROCEDURE SPEC : Key ON : 24Ü1V
Key OFF : 0V
(1) Test 17:
17 Check voltage between connector
CN-88(2) - GND.
Η Disconnect connector CN-88 from power
max solenoid valve. Power max switch
Θ Start key ON.
Ι Check voltage as figure.

LH RCV-lever
CN-88

Power max
solenoid valve
2 1
1 2

GROUND

Multimeter

21096MS14A

(2) Test 18:


18 Check resistance of the solenoid SPEC : 15~35̫
valve between CN-88(1)-(2).
Η Starting key OFF.
Power max switch
Θ Disconnect connector CN-88 from power
max solenoid valve.
Ι Check resistance as figure.

LH RCV-lever
CN-88

Power max 2 1
solenoid valve
1 2

Multimeter
21096MS14B

6-66
15. MALFUNCTION OF BOOM PRIORITY EPPR VALVE
· Fault code : HCESPN 141, FMI 5 or 6
ö Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Short circuit or poor Repair or replace
connection between
CN-53(19)-CN-133
Check resistance (1) or CN-53(9)-
between CN-133(2)
CN-133(1)-(2)
SPEC : 20~30V
KEY : ON
Defective EPPR Repair or replace
NO
valve

Wiring diagram

MCU

19

CN-133

9 2

BOOM PRIORITY
EPPR VALVE
CN-53

21096MS15

6-67
16. MALFUNCTION OF ARM REGENERATION SOLENOID
· Fault code : HCESPN 170, FMI 5 or 6
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

YES Check voltage


YES
between CN-52 Short circuit or Replace or repair
(1)-GND
poor connection
Check resistance between CN-52
SPEC :
KEY ON 24±2V between arm
Check voltage NO (1)-CN-135 (1)
See TEST 19 regen solenoid
between CN-135(2)
- GND SPEC : 15~35Ω Defective Replace
NO
SPEC : solenoid valve
KEY ON : 20~30V

Open circuit Replace or repair


NO
between CN-135
(2)-Fuse No. 28

Wiring diagram

MCU
CN-135
1 1

ARM REGENERATION SOLENOID

FUSE

NO.28
CN-52

21096MS16

6-68
2) TEST PROCEDURE SPEC : Key ON : 24±2 V
(1) Test 19 : Check voltage at CN-52(1) and
ground.
Η Prepare 1 piece of thin sharp pin, steel or
copper. MCU
Θ Insert prepared pin to rear side of PIN
CN-51 CN-52 CN-53
connectors : One pin to (1) of CN-52.
Ι Starting key ON.
Κ Check voltage as figure.

CN-52 Female
10 9 8 7 6 5 4 3 2 1

20 11
30 21

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter

21096MS16A

6-69