Compare-9 15-14 15-45 18-50 18
Compare-9 15-14 15-45 18-50 18
Compare-9 15-14 15-45 18-50 18
6.1 Actions to address risks and opportunities 6.1 Actions to address risks and opportunities 6.1 Actions to address risks and opportunities 6.1 Actions to address risks and opportunities
6.1.1 .. Consider issues of 4.1 and requirements of 4.2 .. 6.1.1 General 6.1.1 General
6.1.2 .. Actions to address risks and opportunities 6.1.2 Environmental aspects 6.1.2 Hazard identification and assessment of risks and opportunities
6.1.3 Compliance obligations 6.1.3 Determination of legal requirements and other requirements
6.1.4 Planning action 6.1.4 Planning action
6.2 Quality objectives and planning to achieve them 6.2 Environmental objectives and planning to achieve them 6.2 OH&S objectives and planning to achieve them 6.2 Objectives, energy targets and planning to achieve them
6.2.1 .. Quality objectives at relevant functions .. 6.2.1 Environmental objectives 6.2.1 OH&S objectives
6.2.2 .. Determine what, who, when, how .. 6.2.2 Planning actions to achieve environmental objectives 6.2.2 Planning to achieve OH&S objectives.
6.3 Planning of changes 6.3 Energy review
6.4 Energy performance indicators
6.5 Energy baseline
6.6 Planning for collection of energy data
7 Support 7 Support 7 Support 7 Support
7.1 Resources 7.1 Resources 7.1 Resources 7.1 Resources
7.1.1 General
7.1.2 People
7.1.3 Infrastructure
7.1.4 Environment for the operation of processes
7.1.5 Monitoring and measuring resources * 9.1.1 Operational control - Monitoring, measuring equipment
7.1.5.1 General
7.1.5.2 Measurement traceability
7.1.6 Organizational knowledge
7.2 Competence 7.2 Competence 7.2 Competence 7.2 Competence
7.3 Awareness 7.3 Awareness 7.3 Awareness 7.3 Awareness
7.4 Communication 7.4 Communication 7.4 Communication 7.4 Communication
7.4.1 General 7.4.1 General
7.4.2 Internal communication 7.4.2 Internal communication
7.4.3 External communication 7.4.3 External communication
7.5 Documented information 7.5 Documented information 7.5 Documented information 7.5 Documented information
7.5.1 General 7.5.1 General 7.5.1 General 7.5.1 General
7.5.2 Creating and updating 7.5.2 Creating and updating 7.5.2 Creating and updating 7.5.2 Creating and updating
7.5.3 Control of documented information 7.5.3 Control of documented information 7.5.3 Control of documented information 7.5.3 Control of documented information
7.5.3.1 .. Documented information controlled ..
7.5.3.2 .. Activities for control of information ..
8 Operation 8 Operation 8 Operation 8 Operation
8.1 Operational planning and control 8.1 Operational planning and control 8.1 Operational planning and control 8.1 Operational planning and control
8.1.1 General
8.1.2 Eliminating hazards and reducing OH&S risks
8.1.3 Management of change
8.1.4 Procurement
8.2 Requirements for products and services 8.2 Emergency preparedness and response 8.2 Emergency preparedness and response
8.2.1 Customer communication
8.2.2 Determining the requirements for products and services
8.2.3 Review of the requirements for products and services
8.2.3.1 .. Ensure ability to meet requirements ..
8.2.3.2 .. Retain documented information ..
8.2.4 Changes to requirements for products and services
8.3 Design and development of products and services *8.1 Operational control - Design and development 8.2 Design
8.3.1 General
8.3.2 Design and development planning
8.3.3 Design and development inputs
8.3.4 Design and development controls
8.3.5 Design and development outputs
8.3.6 Design and development changes
8.4 Control of externally provided processes, products and services *8.1 Operational control- External providers 8.3 Procurement
8.4.1 General
8.4.2 Type and extent of control
8.4.3 Information for external providers
8.5 Production and service provision
8.5.1 Control of production and service provision *8.1 Operational control-Provision of production and service
8.5.2 Identification and traceability
8.5.3 Property belonging to customers or external providers
8.5.4 Preservation
8.5.5 Post-delivery activities *8.1 Operational control - Delivery and post delivery
8.5.6 Control of changes
8.6 Release of products and services
8.7 Control of nonconforming outputs
9 Performance evaluation 9 Performance evaluation 9 Performance evaluation 9 Performance evaluation
9.1 Monitoring measurement, analysis and evaluation 9.1 Monitoring measurement, analysis and evaluation 9.1 Monitoring, measurement, analysis and performance evaluation 9.1 Monitoring, measurement, analysis and evaluation of energy performance and the
EnMS.
9.1.1 General 9.1.1 General 9.1.1 General 9.1.1 General
9.1.2 Customer satisfaction
9.1.3 Analysis and evaluation 9.1.2 Evaluation of compliance 9.1.2 Evaluation of compliance 9.1.2 Evaluation of compliance with legal requirements and other requirements
9.2 Internal audit 9.2 Internal audit 9.2 Internal audit 9.2 Internal audit
9.2.1 .. Conduct internal audits at planned intervals .. 9.2.1 General 9.2.1 General
9.2.2 .. Plan, establish, implement and maintain audit program .. 9.2.2 Internal audit program 9.2.2 Internal audit programme
9.3 Management review 9.3 Management review 9.3 Management review 9.3 Management review
9.3.1 General
9.3.2 Management review inputs
9.3.3 Management review outputs
10 Improvement 10 Improvement 10 Improvement 10 Improvement
10.1 General 10.1 General 10.1 General
10.2 Nonconformity and corrective action 10.2 Nonconformity and corrective action 10.2 Incident, nonconformity and corrective action 10.1 Nonconformity and corrective action
10.2.1 .. When a nonconformity occurs ..
10.2.2 .. Retain documented information ..
10.3 Continual improvement 10.3 Continual improvement 10.3 Continual improvement 10.2 Continual improvement