L B H
1 Site Cleaning 1x 1 50 30 1500 Sft
1500 Sft

2 Earthwork Excavation
1x 3 30 2 2.5 450 Cft
1x 2 20 2 2.5 200 Cft
650 Cft

3 1:3:6 Lean concrete


1x 3 30 2 0.5 90 Cft
1x 2 20 2 0.5 40 Cft
130 Cft

4 1:2:4 concrete work


Footing 1x 12 1.5 1.5 3.5 94.5 Cft
Lintel & Sill Beam 1x 2 100 0.417 0.5 41.7 Cft
Ground Beam 1x 1 130 0.75 0.5 48.75 Cft
184.95 Cft

5 M.S Rod cutting, bending & fixing work


Ground beam
GB1(9"x6") 12 mm Ø
1x 1 130 130 Rft

Stirrup (6.5 mm Ø ties @ 6" c/c )


GB1 (9"x6") 6.5 mm Ø
1x 261 3.67 957.87 Rft

Lintel & Sill Beam


10 mm Ø
2x 2 130 520 Rft

Stirrup (6.5 mm Ø ties @ 6" c/c )


Ground Floor 6.5 mm Ø
Sr Measurement Deduct-
Particular No Content Total
No ion
L B H
2x 261 0.67 349.74 Rft
12 mmØ 130 Rft
10 mm Ø 520 Rft
6.5 mm Ø 1307.61 Rft
6 Form Work
Ground beam
GB1(9"x6") 1x 2 130 0.5 130 Sft

Lintel & Sill Beam


2x 2 130 0.5 260 Sft
390 Sft

7 Brick Work 1:3 cement motor


Retaining Wall
30' Span 1x 3 30 1.125 1 101.25 Cft
1x 2 20 1.125 1 45 Cft
1x 3 30 0.75 1.5 101.25 Cft
1x 2 20 0.75 1.5 45 Cft
Footing 1x 12 1.5 1.5 2.5 67.5
225 Cft

8 Sand Filling 1x 1 20 30 0.5 300 Cft


300 Cft

9 4 - 1/2" thick Brick Wall work with (1:3) C.M


2(30+20)
2(50) 1x 1 100 12 1200 Sft
Door ( 1 ) 1x 1 2.6 7 18.2
Door ( 2 ) 1x 2 3 7 42
Window 1x 5 3 3.5 52.5
112.7
1087.3 Sft
10 4"x2" Chowket Work
Sr Measurement Deduct-
Particular No Content Total
No ion
L B H
D1 1x 1 16.5 16.5 Rft
D2 1x 2 17 34 Rft
Window 1x 5 13 65 Rft
115.5 Rft

11 Door & Window Work


D1 1x 1 2.6 7 18.2 Sft
D2 1x 2 3 7 42 Sft
Window 1x 5 3 3.5 52.5 Sft
112.7 Sft

12 1/4" thick plastering work 1:3 cement


Up to plinth 1x 1 100 1 100 Sft
Brick wall ( As item 6) 1087.3 Sft
1187.3 Sft

13 Plastic Emulsion Paint Work


1x 2 As Item No ( 9 ) 2374.6 Sft
2374.6 Sft

14 Wood Work
5" x 5" timber post 1x 6 0.417 0.417 12 12.52 Cft
4" x 4" timber post 1x 6 0.333 0.333 12 7.98 Cft
5" x 2" Tie Beam 1x 4 20 0.417 0.17 5.67 Cft
1x 3 30 0.417 0.17 6.38 Cft
5" x 2" Rafter 2x 5 18 0.417 0.17 12.7602 Cft
3"x 1/2" Purlin 2x 7 22 0.25 0.125 9.625 Cft
54.94 Cft

15 6"x 1" Eave Board Work


1x 2 22 44 Rft
1x 2 18 36 Rft
80 Rft

16 Roofing work
1x 2 22 18 792 Sft
792 Sft
Sr Measurement Deduct-
Particular No Content Total
No ion
L B H
17 Ridging work
1x 1 22 22 Rft
22 Rft

18 Scaffolding Work
1x 2 20 18 720 Sft
1x 3 30 18 1620 Sft
2340 Sft

19 Oil Painting (3 Coats)


Door & Window 1x 2 112.7 225.4 Sft

Chowket 1 x 0.75 115.5 86.625 Sft


312.025 Sft
Sr No Particular Quantity Unit Rate Per Amount

1 Site Cleaning
1500 Sft
Worker 3.75 Nos 5000 Nos 18750

2 Earthwork Excavation
650 Cft
Worker 13 Nos 5000 Nos 65000

3 1:3:6 Lean concrete


130 Cft
Cement 16.71 Bag 5500 Bag 91920.62
Sand 0.63 Sud 15000 Sud 9450.00
Chipping 1.2 Sud 25000 Sud 30000.00
Mason 1.3 Nos 7000 Nos 9100.00
Worker 10.4 Nos 5000 Nos 52000.00
192470.62

4 1:2:4 concrete work


184.95 Cft
Cement 34.18 Bag 5500 Bag 188007.05
Sand 0.851 Sud 15000 Sud 12765.00
Chipping 1.70 Sud 25000 Sud 42517.12
Mason 3.70 Nos 7000 Nos 25888.69
Worker 27.74 Nos 5000 Nos 138716.90
407894.76

5 M.S Rod cutting, bending & fixing work


12 mmØ 130 Rft
10 mm Ø 520 Rft
6.5 mm Ø 1307.61 Rft
12 mmØ 0.06 Ton 750000 Ton 45000.00
10 mmØ 0.102 Ton 750000 Ton 76500.00
6.5 mm Ø 0.104 Ton 750000 Ton 78000.00
Binding Wire 10.26 Lb 1100 Lb 11290.27
Steel fixer 9.56 Nos 7000 Nos 66932.85
Sr No Particular Quantity Unit Rate Per Amount

Worker 9.56 Nos 5000 Nos 47809.18


325532.30

6 Form Work (3 times use)


390 Sft
Jungle wood 0.52 Ton 650000 Ton 338000.00
5-Ply wood 4.67 Sheet 15000 Sheet 70086.14
Wire Nails 11.70 Lb 1100 Lb 12870.77
Carpenter 23.40 Nos 7000 Nos 163800.00
Worker 7.80 Nos 5000 Nos 39000.00
623756.91

7 Brick Work 1:3 cement motor


225 Cft
Brick 3037.49 Nos 90 Nos 273374.44
Sand 0.59 Sud 15000 Sud 8850.00
Cement 15.67 Bag 5500 Bag 86188.44
Mason 9.00 Nos 7000 Nos 63003.50
Worker 13.50 Nos 5000 Nos 67503.75
498920.13

8 Sand Filling
300 Cft
Sand 3.75 Sud 15000 Sud 56231.52
Worker 3.00 Nos 5000 Nos 14995.07
71226.59

9 4 - 1/2" thick Brick Wall work with (1:3) C.M


1087.3 Sft
Brick 5980.15 Nos 90 Nos 538213.69
Cement 28.83 Bag 5500 Bag 158577.62
Sand 1.09 Sud 15000 Sud 16350.00
X-Met 1250.40 Rft 70 Rft 87527.72
Mason 21.75 Nos 7000 Nos 152236.70
Worker 32.62 Nos 5000 Nos 163100.25
Sr No Particular Quantity Unit Rate Per Amount

1116005.98
10 4"x2" Chowket Work
115.5 Rft
Hard wood 7.38 Ton 850000 Ton 6273382.50
Wire Nail 2.31 Lb 1100 Lb 2541.00
Carpenter 4.62 Nos 7000 Nos 32340.00
6308263.50

11 Door & Window Work


112.7 Sft
Ready made door leaves 64.66 Sft 6500 Sft 420299.32
Ready made window leaves 48.19 Sft 5500 Sft 265050.88
Carpenter 2.68 Nos 7000 Nos 18788.42
704138.62

12 1/2" thick plastering work 1:3 cement


1187.3 Sft
Cement 15.90 Bag 5500 Bag 87459.84
Sand 0.59 Sud 15000 Sud 8850.00
Mason 11.87 Nos 7000 Nos 83118.05
Worker 23.75 Nos 5000 Nos 118730.00
298157.88

13 Plastic Emulsion Paint Work


2374.6 Sft
Plastic Emulsion Paint 23.75 Gal 10000 237450.62
Roller 5.94 Nos 1000 5937.20
Painter 23.75 Nos 7000 166215.43
409603.25

14 Wood Work
54.94 Cft
Pyingado 30.22 Cft
Nails & Spikes 7.69 Lb 1100 8460.84
Carpenter 6.59 Nos 7000 46150.03
Sr No Particular Quantity Unit Rate Per Amount

15 6"x 1" Eave Board Work


80 Rft
6"x1" Plank 4.168 Rft 450 1875.60
1.6 Nos
1.6 Nos 5000 8000.00

16 Roofing work
792 Sft
4 Angle Aluzinc Colour Sheet 364.32 Rft 1000 Rft 364322.16
Roofing Nail 11.88 Lb 1100 Lb 13069.78
Carpenter 11.88 Nos 7000 Nos 83171.34
Worker 7.92 Nos 5000 Nos 39605.40
500168.68

17 Ridging work
22 Sft
Color Plain Sheet Ridging 24.64 Rft 1000 Rft 24640.00
Roofing Nail 0.332 Lb 1100 Lb 365.20
Carpenter 0.73 Nos 7000 Nos 5110.00
30115.20

18 Scaffolding Work (3 times use)


2340 Sft
Bamboo 86.66 Nos 500 Nos 43332.16
Coin Yarn 6.23 Viss 3000 Viss 18688.38
Wire Nail 6.23 Lb 1100 Lb 6852.41
Worker 28.44 Nos 5000 Nos 142191.89
211064.84

19 Oil Painting (3 Coats)


312.025 Sft
Ready mixed paint 23.40 Lb Lb
Putty 1.25 Gal 6000 Gal 7488.60
Painter 3.12 Nos 7000 Nos 21841.75
Worker 3.12 Nos 5000 Nos 15601.25
Sr No Particular Quantity Unit Rate Per Amount
Sr No Particular Quantity Unit Rate Per Amount
5438 130
1578 520
5532 1307.61
12548 1957.61
2774.5

14572.41

1079.44

1156.38

14240.88

2589.25
77.68
51.79
100
6.39
2
4

369.5
212
158
8.8

5898.5
79
2.95
58.99
117.97

6327.25
63.27 1
15.82
63.27 1

55
14
12
5.21
2
2

1833.75
843.53
27.51
18.34

45
50.4
0.68
1.5

2220
82.22
5.91
5.91
26.98

1019.88
7.42 1000
0.4 75
10.2 4
10
10
Sr No Particular Quantity Per Rate Per Amount

1 Cement
2 Sand
3 Chipping
4 12 mmØ
5 10 mmØ
6 6.5 mm Ø
7 Binding Wire
8 Jungle wood
9 5-Ply wood
10 Wire Nails
11 Brick
12 X-Met
13 Hard wood
14 Ready made door leaves
15 Ready made window leaves
16 Plastic Emulsion Paint
17 Roller
18 Pyingado
19 6"x1" Plank
20 4 Angle Aluzinc Colour Sheet
21 Color Plain Sheet Ridging
22 Bamboo
23 Coin Yarn
24 Ready mixed paint
25 Putty
Sr No Particular Quantity Per Rate Per Amount
Sr No Particular Quantity Per Rate Per Amount