I.D.P Work (22.1.23)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

Summary

A Maerials 64,078,113

B Labour 19,813,635

Total Material + Labor 83,891,748

83.892 Million
Abstract of Cost

No. Particular Unit Quantity Rate Per Amount Remark

1 Earthwork in excavation in foundation cft 3969.50 595,400 cft 150

2 Hardcore Filling cft 699.00 3,428,533 cft 4,905

3 (1:3:6) lean concrete work cft 233.00 2,435,404 cft 10,452

4 Brick work for plinth with (1:1:6) composite motor cft 805.00 5,325,089 cft 6,615

5 Plastering work plinth with (1:1:6) composite motor (1/2" tk) sft 596.00 454,854 sft 763

6 (1:2:4) cement concrete work up to plinth cft 570.72 5,120,109 cft 8,971

7 Hardcore filling work cft 2457.00 144,345 cft 59

8 4'' tk (1:3:6) Lean concrete work cft 293.33 2,481,469 cft 8,460

9 1 1\2" tk (1:2:4) Cement concrete work for floor topping sft 110.00 139,167 sft 1,265

10 (1:2:4) Cement concrete work for superstructure cft 1829.28 15,743,893 cft 8,607

11 1st Class brick work with (1:1:6) cement motor for superstructure (4 1/2'' tk) cft 1270.31 8,395,134 cft 6,609

12 1/2'' tk plastering work with (1:1:6) composite motor for superstructure sft 7836.00 5,979,686 sft 763

13 1 1/2'' tk (1:2:4) cement concrete work for floor topping sft 2449.50 3,096,672 sft 1,264

14 Scaffolding work ( for two Layer) sft 4092.00 1,931,920 sft 472

15 Carpentary work sft 7695.08 5,460,903 sft 710

16 Chowket work(6''x3'') Rft 206.00 665,275 Rft 3,229


Bill of Quantity

No. Particular Unit Quantity Rate Per Amount Remark

A Maerials

1 Cement Bag 695.83 12,000 Bag 8,349,908

2 1st Class brick No 28016.72 250 No 7,004,180

3 16 mm MS rod Ton 5.83 1,500,000 Ton 8,742,815

4 10 mm MS rod Ton 3.81 1,500,000 Ton 5,710,985

5 8 mm MS rod Ton 1.35 1,500,000 Ton 2,022,455

6 Timber scantling (3 times used) Cft 5.01 219,760 Cft 1,100,960

7 Hard wood Rft 206.00 3,229 Rft 665,275

8 Bamboo No 454.67 3,000 No 1,364,010

9 8' x 4' Plywood (3 times used) sheet 36.01 18,000 sheet 648,146

10 Rubble stone cft 904.46 3,500 cft 3,165,555

11 Stone Chippings cft 2208.00 3,900 cft 8,610,919

12 Stone Ballast cft 505.28 4,200 cft 2,122,090

13 Stone Aggregate cft 294.34 4,200 cft 1,236,178

14 Sand cft 2448.27 4,000 cft 9,792,748

15 Coir Yarn Viss 32.68 665 Viss 21,723

16 Fuel Gals 61.98 13,166 Gals 816,029

17 Lime Bag 368.75 6,000 Bag 2,212,479

18 Nail and spikes Lbs 90.18 1,495 Lbs 134,821

19 Plastic cone for seperators No 3005.89 No -

20 Seperators No 1502.95 No -

21 Binding wire Lbs 205.86 1,496 Lbs 307,952

22 Wire nail Lbs 32.68 1,496 Lbs 48,887

64,078,113
Bill of Quantity

No. Particular Unit Quantity Rate Per Amount Remark

B Labour

1 Mason No 259.48 16,500 No 4,281,420

2 Carpenter No 180.35 16,500 No 2,975,775

3 Smith No 215.46 16,500 No 3,555,090

4 Worker No 819.67 10,000 No 8,196,700

5 Digger No 59.54 10,000 No 595,400

6 Machine Driver No 15.50 13,500 No 209,250

19,813,635

Total 83,891,748

83.892 million
Builder's Estimate

No. Particular Unit Quantity Rate Per Amount Remark

1 Earthwork in excavation in foundation Cft 3969.5

Digger No 59.54 10,000 No 595,400

595,400

2 Hardcore Filling Cft 699

Rubble stone Cft 873.75 3,500 Cft 3,058,063

Mason No 13.98 16,500 No 230,670

Worker No 13.98 10,000 No 139,800

3,428,533

3 (1:3:6) lean concrete work Cft 233

Cement Bag 29.96 12,000 Bag 359,486

Sand Cft 111.84 4,000 Cft 447,344

Stone Ballast Cft 223.68 4,200 Cft 939,418

Mason No 2.33 16,500 No 38,445

Worker No 41.94 10,000 No 419,400

Machine Driver No 3.50 13,500 No 47,250

Fuel Gal 13.98 13,166 Gal 184,061

2,435,404

4 Brick work for plinth with (1:1:6) composite motor Cft 805

1st Class brick No 10867.50 250 No 2,716,875

Cement Bag 26.74 12,000 Bag 320,850

Lime Bag 79.36 6,000 Bag 476,132

Sand Cft 199.24 4,000 Cft 796,932

Mason No 32.20 16,500 No 531,300

Worker No 48.30 10,000 No 483,000

5,325,089

5 Plastering work plinth with (1:1:6) composite motor (1/2" tk)

Sft 596 -

Cement Bag 3.99 12,000 Bag 47,893

Lime Bag 11.70 6,000 Bag 70,226

Sand Cft 29.8 4,000 Cft 119,196

Mason No 5.96 16,500 No 98,340

Worker No 11.92 10,000 No 119,200

454,854
Builder's Estimate

No. Particular Unit Quantity Rate Per Amount Remark

6 (1:2:4) cement concrete work up to plinth Cft 570.72

Cement Bag 105.48 12,000 Bag 1,265,780

Stone Chippings Cft 525.06 3,900 Cft 2,047,667

Sand Cft 262.53 4,000 Cft 1,050,083

Fuel Gal 11.41 13,166 Gal 150,224

Mason No 17.12 16,500 No 282,480

Worker No 28.54 10,000 No 285,400

Machine Driver No 2.85 13,500 No 38,475

5,120,109

7 Hardcore filling work Cft 2457

Rubble stone Cft 30.71 3,500 Cft 107,492

Sand Cft 9.21 4,000 Cft 36,854

144,345

8 4'' tk (1:3:6) Lean concrete work Sft 293.33

Cement Bag 37.71 12,000 Bag 452,571

Stone Ballast cft 281.6 4,200 cft 1,182,672

Sand cft 140.8 4,000 cft 563,180

Mason No 2.93 16,500 No 48,345

Worker No 23.47 10,000 No 234,700

2,481,469

9 1 1\2" tk (1:2:4) Cement concrete work for floor topping

sft 110

Cement Bag 2.54 12,000 Bag 30,525

Stone Aggregate cft 12.65 4,200 cft 53,128

Sand cft 6.33 4,000 cft 25,319

Mason No 0.83 16,500 No 13,695

Worker No 1.65 10,000 No 16,500

139,167

10 (1:2:4) Cement concrete work for superstructure Cft 1829.28

Cement Bag 338.09 12,000 Bag 4,057,077

Stone Chippings cft 1682.94 3,900 cft 6,563,252

Sand cft 841.47 4,000 cft 3,365,761

Mason No 36.59 16,500 No 603,735

Worker No 54.88 10,000 No 548,800


Builder's Estimate

No. Particular Unit Quantity Rate Per Amount Remark

Machine Driver No 9.15 13,500 No 123,525

Fuel Gals 36.59 13,166 Gals 481,744

15,743,893

11 1st Class brick work with (1:1:6) cement motor for superstructure (4 1/2'' tk)

Cft 1270.31

1st Class brick No 17149 250 No 4,287,305

Cement Bag 42.19 12,000 Bag 506,310

Lime Bag 123.90 6,000 Bag 743,399

Sand cft 314.40 4,000 cft 1,257,555

Mason No 50.81 16,500 No 838,365

Worker No 76.22 10,000 No 762,200

8,395,134

12 1/2'' tk plastering work with (1:1:6) composite motor for superstructure

Sft 7836

Cement Bag 52.47 12,000 Bag 629,679

Lime Bag 153.79 6,000 Bag 922,722

Sand cft 391.8 4,000 cft 1,567,145

Mason No 78.36 16,500 No 1,292,940

Worker No 156.72 10,000 No 1,567,200

5,979,686

13 1 1/2'' tk (1:2:4) cement concrete work for floor topping

sft 2449.50

Cement Bag 56.64 12,000 Bag 679,737

Stone Aggregate cft 281.69 4,200 cft 1,183,050

Sand cft 140.85 4,000 cft 563,380

Mason No 18.37 16,500 No 303,105

Worker No 36.74 10,000 No 367,400

3,096,672

14 Scaffolding work ( for two Layer) sft 4092

Bamboo No 454.67 3,000 No 1,364,010

Coir Yarn Viss 32.68 665 Viss 21,723

Wire nail Lbs 32.68 1,496 Lbs 48,887

Worker No 49.73 10,000 No 497,300

1,931,920
Builder's Estimate

No. Particular Unit Quantity Rate Per Amount Remark

15 Carpentary work sft 7695.08

Timber scantling (3 times used) Ton 5.01 219,760 cft 1,100,960

8' x 4' Plywood (3 times used) sheet 36.01 18,000 sft 648,146

Nail and spikes Lbs 90.18 1,495 Lbs 134,821

Seperators No 1502.95 - No -

Plastic cone for seperators No 3005.89 - No -

Carpenter No 180.35 16,500 No 2,975,775

Worker No 60.12 10,000 No 601,200

5,460,903

16 Reinforcing Work

For Sub-structure

Footing

For 16 mm MS rod Lbs 1301.66

16 mm MS rod Ton 0.62 1,500,000 Ton 930,184

Binding Wire Lbs 11.62 1,496 Lbs 17,383

Smith No 8.72 16,500 No 143,880

Worker No 8.72 10,000 No 87,200

Column

For 16 mm MS rod Lbs 1627.08

16 mm MS rod Ton 0.78 1,500,000 Ton 1,162,725

Binding Wire Lbs 14.53 1,496 Lbs 21,736

Smith No 14.53 16,500 No 239,745

Worker No 14.53 10,000 No 145,300

Beam

For 16 mm MS rod Lbs 1439.34

16 mm MS rod Ton 0.69 1,500,000 Ton 1,028,569

Binding Wire Lbs 12.85 1,496 Lbs 19,223

Smith No 9.64 16,500 No 159,060

Worker No 9.64 10,000 No 96,400

Slab

For 10 mm MS rod Lbs 91.37

10 mm MS rod Ton 0.04 1,500,000 Ton 65,295

Binding Wire Lbs 0.82 1,496 Lbs 1,227


Builder's Estimate

No. Particular Unit Quantity Rate Per Amount Remark

Smith No 0.82 16,500 No 13,530

Worker No 0.82 10,000 No 8,200

Stirrup & Tie

For 8 mm MS rod Lbs 243.38

8 mm MS rod Ton 0.12 1,500,000 Ton 173,922

Binding Wire Lbs 2.17 1,496 Lbs 3,246

Smith No 4.35 16,500 No 71,775

Worker No 4.35 10,000 No 43,500

For Superstructure

Column

For 16 mm MS rod Lbs 3579.58

16 mm MS rod Ton 1.71 1,500,000 Ton 2,557,997

Binding Wire Lbs 31.96 1,496 Lbs 47,810

Smith No 31.96 16,500 No 527,340

Worker No 31.96 10,000 No 319,600

Beam

For 16 mm MS rod Lbs 4286.73

16 mm MS rod Ton 2.04 1,500,000 Ton 3,063,342

Binding Wire Lbs 38.27 1,496 Lbs 57,249

Smith No 28.71 16,500 No 473,715

Worker No 28.71 10,000 No 287,100

Slab

For 10 mm MS rod Lbs 7900.38

10 mm MS rod Ton 3.76 1,500,000 Ton 5,645,690

Binding Wire Lbs 70.54 1,496 Lbs 105,523

Smith No 70.54 16,500 No 1,163,910

Worker No 70.54 10,000 No 705,400

Stirrup & Tie

For 8 mm MS rod Lbs 2586.77

8 mm MS rod Ton 1.23 1,500,000 Ton 1,848,532

Binding Wire Lbs 23.1 1,496 Lbs 34,556

Smith No 46.19 16,500 No 762,135

Worker No 46.19 10,000 No 461,900

22,493,896
Builder's Estimate

No. Particular Unit Quantity Rate Per Amount Remark

17 Chowket work(6''x3'') Rft 206

Hard wood Rft 206 3,229 Rft 665,275

665,275

Total 83,891,748

83.892 million
Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

1 Earthwork in excavation in foundation

F1 5 4' 0'' 4' 0'' 8' 0'' 640

F2 2 4' 0'' 4' 0'' 8' 0'' 256

F3 6 3' 0'' 6' 0'' 8' 0'' 864

F4 2 4' 0'' 7' 0'' 8' 0'' 448

Septic Tank 1 9' 0'' 9' 0'' 4' 0'' 324

Retaining wall (long wall) 3 40' 0'' 2' 6'' 2' 6'' 750

Retaining wall (Short wall) 5 22' 0'' 2' 6'' 2' 6'' 687.5

3969.5 3969.5 cft

2 Hardcore Filling

F1 5 4' 0'' 4' 0'' 0' 9'' 60

F2 2 4' 0'' 4' 0'' 0' 9'' 24

F3 6 3' 0'' 6' 0'' 0' 9'' 81

F4 2 4' 0'' 7' 0'' 0' 9'' 42

Septic Tank 1 9' 0'' 9' 0'' 0' 9'' 60.75

Retaining wall (long wall) 3 40' 0'' 2' 6'' 0' 9'' 225

Retaining wall (Short wall) 5 22' 0'' 2' 6'' 0' 9'' 206.25

699 699 cft

3 (1:3:6) lean concrete work

F1 5 4' 0'' 4' 0'' 0' 3'' 20

F2 2 4' 0'' 4' 0'' 0' 3'' 8

F3 6 3' 0'' 6' 0'' 0' 3'' 27

F4 2 4' 0'' 7' 0'' 0' 3'' 14

Septic Tank 1 9' 0'' 9' 0'' 0' 3'' 20.25

Retaining wall (long wall) 3 40' 0'' 2' 6'' 0' 3'' 75

Retaining wall (Short wall) 5 22' 0'' 2' 6'' 0' 3'' 68.75

233 233 cft

4 Brick work for plinth with (1:1:6) composite motor

Retaining wall (long wall) 3 40' 0'' 0' 9'' 4' 8'' 420

Retaining wall (short wall) 5 22' 0'' 0' 9'' 4' 8'' 385

805 805 cft


Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

5 Plastering work plinth with (1:1:6) composite motor (1/2" tk)

Retaining wall (long wall) 2 40' 0'' 3' 0'' 240

Retaining wall (short wall) 2 22' 0'' 3' 0'' 132

Septic Tank 4 8' 0'' 7' 0'' 224

596 596 sft

6 (1:2:4) cement concrete work up to plinth

F1 5 4' 0'' 4' 0'' 0' 12'' 80

F2 2 4' 0'' 4' 0'' 0' 12'' 32

F3 6 3' 0'' 6' 0'' 0' 12'' 108

F4 2 4' 0'' 7' 0'' 0' 12'' 56

Column 15 0' 12'' 0' 12'' 9' 0'' 135

GB 3 40' 0'' 0' 10'' 0' 10'' 83.3

5 22' 0'' 0' 10'' 0' 10'' 76.4

570.7 570.7 cft

7 Hardcore filling work

1 21' 0'' 39' 0'' 3' 0'' 2457

2457 2457 cft

8 4'' tk (1:3:6) Lean concrete work

1 22' 0'' 40' 0'' 0' 4'' 293.33

293.33 293.33 cft

9 1 1\2" tk (1:2:4) Cement concrete work for floor topping

1 22' 0'' 40' 0'' 110

110 110 sft

10 (1:2:4) Cement concrete work for superstructure

Column

C1 13 0' 12'' 0' 12'' 22' 0'' 286

C2 2 0' 12'' 0' 12'' 25' 0'' 50

C3 9 0' 12'' 0' 12'' 11' 0'' 99


Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

Beam (for first floor)

FB1

For 12' span 3 11' 0'' 0' 10'' 0' 14'' 32.1

For 11' span 5 10' 0'' 0' 10'' 0' 14'' 48.6

For 10' span 8 9' 0'' 0' 10'' 0' 14'' 70

For 9' span 3 8' 0'' 0' 10'' 0' 14'' 23.3

For 8' span 2 7' 0'' 0' 10'' 0' 14'' 13.6

FB2

1 39' 0'' 0' 10'' 0' 12'' 32.5

Beam (for second floor)

FB1

For 12' span 3 11' 0'' 0' 10'' 0' 14'' 32.1

For 11' span 5 10' 0'' 0' 10'' 0' 14'' 48.6

For 10' span 8 9' 0'' 0' 10'' 0' 14'' 70

For 9' span 3 8' 0'' 0' 10'' 0' 14'' 23.3

For 8' span 2 7' 0'' 0' 10'' 0' 14'' 13.6

FB2

1 39' 0'' 0' 10'' 0' 12'' 32.5

Beam (for roof floor)

FB1

For 12' span 3 11' 0'' 0' 10'' 0' 14'' 32.1

For 11' span 3 10' 0'' 0' 10'' 0' 14'' 29.2

For 10' span 3 9' 0'' 0' 10'' 0' 14'' 26.25

For 8' span 3 7' 0'' 0' 10'' 0' 14'' 20.4

FB2

3 4' 6'' 0' 10'' 0' 12'' 11.25

1 22' 0'' 0' 10'' 0' 12'' 18.3

Slab

First slab 1 40' 0'' 23' 0'' 0' 4'' 306.7

Second slab 1 40' 0'' 23' 0'' 0' 4'' 306.7

Roof slab 1 23' 0'' 26' 6'' 0' 4'' 203.2

1829.3 1829.3 cft


Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

11 1st Class brick work with (1:1:6) cement motor for superstructure (4 1/2'' tk)
Ground floor
For 12' span 3 11' 0'' 0' 4.5'' 10' 0'' 123.8

For 11' span 2 10' 0'' 0' 4.5'' 10' 0'' 75

For 10' span 5 9' 0'' 0' 4.5'' 10' 0'' 168.8

For 9' span 3 8' 0'' 0' 4.5'' 10' 0'' 90

For 8' span 2 7' 0'' 0' 4.5'' 10' 0'' 52.5

1 6' 0'' 0' 4.5'' 10' 0'' 22.5

532.5 cft
Doors and windows deduction
MD 1 5' 0'' 0' 4.5'' 9' 0'' 16.9

D2 1 2' 6'' 0' 4.5'' 6' 6'' 6.1

W1 7 4' 0'' 0' 4.5'' 6' 0'' 63

W2 1 2' 0'' 0' 4.5'' 6' 0'' 4.5

W3 1 6' 0'' 0' 4.5'' 6' 0'' 13.5

F1 1 2' 0'' 0' 4.5'' 1' 6'' 1.1

F2 2 3' 0'' 0' 4.5'' 1' 6'' 3.4

108.5 cft
First Floor
For 12' span 3 11' 0'' 0' 4.5'' 10' 0'' 123.8

For 11' span 3 10' 0'' 0' 4.5'' 10' 0'' 112.5

For 10' span 8 9' 0'' 0' 4.5'' 10' 0'' 270

For 9' span 3 8' 0'' 0' 4.5'' 10' 0'' 90

For 8' span 2 7' 0'' 0' 4.5'' 10' 0'' 52.5

1 6' 0'' 0' 4.5'' 10' 0'' 22.5

671.3 cft

Doors and windows deduction

D1 3 5' 0'' 0' 4.5'' 9' 0'' 50.6

D2 2 2' 6'' 0' 4.5'' 6' 6'' 12.2

D3 1 3' 0'' 0' 4.5'' 9' 0'' 10.1

W1 7 4' 0'' 0' 4.5'' 6' 0'' 63

W2 1 2' 0'' 0' 4.5'' 6' 0'' 4.5

W3 1 6' 0'' 0' 4.5'' 6' 0'' 13.5

F1 3 2' 0'' 0' 4.5'' 1' 6'' 3.4

157.3 cft
Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

Second Floor

For 12' span 2 11' 0'' 0' 4.5'' 10' 0'' 82.5

For 11' span 3 10' 0'' 0' 4.5'' 10' 0'' 112.5

For 10' span 3 9' 0'' 0' 4.5'' 10' 0'' 101.25

For 8' span 2 7' 0'' 0' 4.5'' 10' 0'' 52.5

1 13' 0'' 0' 4.5'' 10' 0'' 48.8

2 19' 0'' 0' 4.5'' 3' 0'' 42.8

440.25 cft

Doors and windows deduction

D1 1 5' 0'' 0' 4.5'' 9' 0'' 16.9

D2 1 2' 6'' 0' 4.5'' 6' 6'' 6.1

D3 1 3' 0'' 0' 4.5'' 9' 0'' 10.1

W1 3 4' 0'' 0' 4.5'' 6' 0'' 27

W2 1 2' 0'' 0' 4.5'' 6' 0'' 4.5

W3 1 6' 0'' 0' 4.5'' 6' 0'' 13.5

W4 2 4' 0'' 0' 4.5'' 9' 0'' 27.0

F1 1 2' 0'' 0' 4.5'' 1' 6'' 1.1

F2 1 3' 0'' 0' 4.5'' 1' 6'' 1.7

107.9 cft

1644.0 373.7 1270.3 cft

12 1/2'' tk plastering work with (1:1:6) composite motor for superstructure


Ground floor
For 12' span 6 11' 0'' 10' 0'' 660

For 11' span 4 10' 0'' 10' 0'' 400

For 10' span 10 9' 0'' 10' 0'' 900

For 9' span 6 8' 0'' 10' 0'' 480

For 8' span 4 7' 0'' 10' 0'' 280

2 6' 0'' 10' 0'' 120


First Floor
For 12' span 6 11' 0'' 10' 0'' 660

For 11' span 6 10' 0'' 10' 0'' 600

For 10' span 16 9' 0'' 10' 0'' 1440

For 9' span 6 8' 0'' 10' 0'' 480

For 8' span 4 7' 0'' 10' 0'' 280


2 6' 0'' 10' 0'' 120
Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

Second Floor

For 12' span 4 11' 0'' 10' 0'' 440

For 11' span 6 10' 0'' 10' 0'' 600

For 10' span 6 9' 0'' 10' 0'' 540

For 8' span 4 7' 0'' 10' 0'' 280

2 13' 0'' 10' 0'' 260

4 19' 0'' 3' 0'' 228

Deduction for doors and windows

MD 1 5' 0'' 9' 0'' 45

D1 4 3' 0'' 7' 0'' 84

D2 4 2' 6'' 6' 6'' 65

D3 2 3' 0'' 9' 0'' 54

W1 17 4' 0'' 6' 0'' 408

W2 3 2' 0'' 6' 0'' 36

W3 3 6' 0'' 6' 0'' 108

W4 2 6' 0'' 9' 0'' 108

F1 5 2' 0'' 1' 6'' 15

F2 2 3' 0'' 1' 6'' 9

8768 932 7836 sft

13 1 1/2'' tk (1:2:4) cement concrete work for floor topping

First slab 1 40' 0'' 23' 0'' 920

Second slab 1 40' 0'' 23' 0'' 920

Roof slab 1 23' 0'' 26' 6'' 609.5

2449.5 2449.50 sft

14 Scaffolding work ( for two Layer)

2 40' 0'' 33' 0'' 2640

2 22' 0'' 33' 0'' 1452

4092 4092 sft

15 Carpentary work

F1 20 4' 0'' 0' 12'' 80

F2 8 4' 0'' 0' 12'' 32


Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

F3 12 3' 0'' 0' 12'' 36

12 6' 0'' 0' 12'' 72

F4 4 4' 0'' 0' 12'' 16

4 7' 0'' 0' 12'' 28

Septic Tank 1 9' 0'' 9' 0'' 81

Column 60 0' 12'' 10' 0'' 600

GB 6 40' 0'' 0' 10'' 200

10 22' 0'' 0' 10'' 183.3

First floor column 60 0' 12'' 11' 0'' 660

Second floor column 60 0' 12'' 11' 0'' 660

roof floor column 36 0' 12'' 11' 0'' 396

first floor beam 0

FB1 6 40' 0'' 0' 14'' 280

10 22' 0'' 0' 14'' 256.7

3 40' 0'' 0' 10'' 100

5 22' 0'' 0' 10'' 91.7

FB2 2 39' 0'' 0' 14'' 91

1 39' 0'' 0' 10'' 32.5

Second floor beam

FB1 6 40' 0'' 0' 14'' 280

10 22' 0'' 0' 14'' 256.7

3 40' 0'' 0' 10'' 100

5 22' 0'' 0' 10'' 91.7

FB2 2 39' 0'' 0' 14'' 91

1 39' 0'' 0' 10'' 32.5

Roof beam

FB1 6 21' 0'' 0' 14'' 147

6 22' 0'' 0' 14'' 154

3 21' 0'' 0' 10'' 52.5

3 22' 0'' 0' 10'' 55

FB2 6 4' 6'' 0' 12'' 27

2 22' 0'' 0' 12'' 44

3 4' 6'' 0' 10'' 11.3

1 22' 0'' 0' 10'' 18.3


Details of Measurements

Measurements
No. Particles No. Contents Dedu; Total Remark
L B H

Slab

First floor slab 1 40' 0'' 23' 0'' 920

Second floor slab 1 40' 0'' 23' 0'' 920

Roof Slab 1 23' 0'' 26' 6'' 598

7695.1 7695.1 sft

17 Chowket work(6''x3'')

D1(3'x7') 4 17' 0'' 68

D2(2'6''x6'6'') 4 15' 6'' 62

D3(3'x9') 2 24' 0'' 48

MD(5'x9') 1 28' 0'' 28

206 206 Rft


Rebar Work

Total Length (Rft)


No. No. No.
Sr.No Particular Length 16mmØ 10mmØ 8mmØ
Off on each Total
Ms Rod Ms Rod Ms Rod

1 Footing

F1 4.0' 5 8 40 160.00

4.0' 5 8 40 160.00

F2 4.0' 2 8 16 64.00

4.0' 2 8 16 64.00

F3 6.0' 6 12 72 432.00

3.0' 6 6 36 108.00

F4 7.0' 2 14 28 196.00

4.0' 2 8 16 64.00

1248.00

1301.66 Lbs

2 Column

C1 13.0' 15 8 120 1560.00

1560.00

1627.08 Lbs

3 Beam

GB 22.0' 5 6 30 660.00

40.0' 3 6 18 720.00

1380.00

1439.34 Lbs

4 Slab 9.0' 1 14 14 126.00

9.0' 1 13 13 117.00

243.00

91.37 Lbs
Rebar Work

Total Length (Rft)


No. No. No.
Sr.No Particular Length 16mmØ 10mmØ 8mmØ
Off on each Total
Ms Rod Ms Rod Ms Rod

5 Stirrup & Tie


Column 4.5' 15 7 105 472.50
123.32 Lbs
Beam 4.0' 1 115 115 460.00
120.06 Lbs

Superstructure
6 Column
Gf to 1st 11.0' 15 8 120 1320.00
C1
1st to 2nd 11.0' 15 8 120 1320.00
C1
2nd to roof 11.0' 9 8 72 792.00
3432.00
3579.58 Lbs
7 Beam
1st floor
FB1 222.0' 1 6 6 1332.00
FB2 39.0' 1 6 6 234.00
2nd floor
FB1 222.0' 1 6 6 1332.00
FB2 39.0' 1 6 6 234.00
roof floor
FB1 126.0' 1 6 6 756.00
FB2 37.0' 1 6 6 222.00
4110.00
4286.73 Lbs
Rebar Work

Total Length (Rft)


No. No. No.
Sr.No Particular Length 16mmØ 10mmØ 8mmØ
Off on each Total
Ms Rod Ms Rod Ms Rod

8 Slab
1st + 2nd floor 44.5' 4 67 268 11926.00
22.0' 4 33 132 2904.00
Roof floor 22.0' 2 33 66 1452.00
25.5' 2 39 78 1989.00
18271.00

7900.38 Lbs
9 Stirrup & Tie
C1 4.5' 39 22 858 3861.00
FB1 4.5' 1 1140 1140 5130.00
FB2 4.0' 1 230 230 920.00
9911.00

2586.77 Lbs