Sub-Total 5,000.00: NO. Description Unit Quantity Unit Cost Total Cost
Sub-Total 5,000.00: NO. Description Unit Quantity Unit Cost Total Cost
Sub-Total 5,000.00: NO. Description Unit Quantity Unit Cost Total Cost
Sub-Total 5,000.00
II. Construction of Columns
a. Materials
1 16mm ø x 6m Rebar pcs. 14.00 351.75 4924.50
2 10mm ø x 6m Rebar pcs. 8.00 183.75 1470.00
3 Cement bags 16.00 260.00 4160.00
4 Gravel 3/4" cu.m 1.77 1961.00 3462.15
5 Sand 'S1' cu.m 1.00 1425.00 1425.00
6 G.I Wire #16 kgs. 3.47 90.00 311.85
7 3/4" Ordinary Plywood pcs. 2.00 1160.00 2320.00
8 Coco Lumber bd.ft 44.51 40.00 1780.20
9 Consumables lot 1.00 992.68 992.68
b. Labor (Erection of Column including Forms)
1 Excavation and Backfilling cum 4.35 605.00 2631.75
2 Concreting cu.m 0.88 1757.00 1550.99