Jamal Poles Brochure
Jamal Poles Brochure
Jamal Poles Brochure
ISO Certificate 1
API Certificate 2
Introduction 3
Group Introduction 4
Galvanizing Process 5
Octagonal Pole Chart 7
Octagonal Pole Drawing 8
Round Conical Pole Chart 9
Round Conical Pole Drawing 10
Tubular Pole Chart 11
Tubular Pole Drawing 12
Pole Arms 13
Hinge Pole 15
Hinge Pole Drawing 16
Guard Rail 18
Guard Rail Drawing 19
Client & Project List 20
Project Pictures 21
Contact Us 23
Certifications Certifications
1 2
Introduction Group Introduction
M/s. JAMAL PIPE INDUSTRIES (PVT.) LTD; moves in this way offering a complete range of products, realiz-
ing with the use of modern and high-technologies, in order to satisfy numerous requirements
3 4
Galvanizing Process
We have a huge Hot Dip galvanizing facility. This facility can accommodate large pieces.
Maximum size of 45 feet. We use this facility for both in house and commercial purposes.
Jamal Poles
5 6
Round Conical Poles Chart Round Conical Poles Drawing
SR. NO.
POLE 'H'
(MM)
BOTTOM DIA
(MM)
TOP DIA
(MM)
DOOR SIZE L X
W (MM)x(MM)
THIICKNESS (MM)
SHAFT 'L'
(MM)
BASE PLATE
(L x W x Thk.)
ARM DIA x
THICK (MM)
ARM 'AL'
(MM)
TOP A/F OUTSIDE
JPI-RC-5 120 60 500 X 90 3.00 4000 300x300x14 60 X 3.00 1000
5000
JPI-RC-5A 120 60 500 X 90 3.50 4700 300X300X14 60 X 3.00 500 Round Conical Poles
130 60 500 X 90 3.00 5000 300x300x12 60 X 3.00 1000
JPI-RC-6
Bottom Dia (Outside)
JPI-RC-6A 140 60 500 X 90 3.00 5700 300x300x12 60 X 3.00 500
JPI-RC-6B
6000
150 60 500 X 90 3.50 5000 300x300x14 60 X 3.00 1000
Top A/F (Outside)
JPI-RC-6C 150 60 500 X 90 3.50 5700 300X300X14 60 X 3.00 500 Arm Dia (Outside)
JPI-RC-7A 150 60 500 X 90 3.00 6700 300x300x12 60 X 3.00 500 H = Total Height
JPI-RC-7B 7000 150 60 500 X 90 3.50 6000 300x300x14 60 X 3.00 1000
BRACKET 90 T1 = Sheet Thickness
JPI-RC-7C 150 60 500 X 90 3.50 6700 300X300X14 60 X 3.00 500
D = Door Opening
JPI-RC-8 145 65 500 X 90 3.50 8000 300X300X16 60 X 3.00 800-1200 FOR
L = Shaft Length
JPI-RC-8A 150 70 500 X 90 3.50 8000 300X300X16 60 X 3.00 800-1200 BREAKERS S = Size of Base Plate
JPI-RC-8B 8000 150 60 500 X 90 3.50 7700 300x300x16 60 X 3.00 500-1000
JPI-RC-8C 160 60 500 X 90 4.00 6000 300x300x16 60 X3.25 1000 T = Thickness of Base Plate
JPI-RC-8D 160 60 500 X 90 4.00 6700 300X300X16 60 X 3.25 500-1000 d = Base Plate Holes for J Bolts
JPI-RC-9 160 60 500 X 90 3.50 8000 300X300X16 60 X 3.00 1000
P = P.C.D of Bolts
JPI-RC-9A
9000
160 60 500 X 90 3.50 8700 300x300x16 60 X 3.00 500 DOOR
JPI-RC-9B 170
170
60
76
500 X 90
500 X 90
4.00
4.00
8000
8700
300x300x16
300X300X16
60 X 3.25
60 X 3.25
1000
500-1000
OPENING
JPI-RC-9C
JPI-RC-10 170 60 500 X 90 4.00 9000 400X400X20 60 X 3.00 1000
JPI-RC-10A 10000 170 60 500 X 90 4.00 9700 400X400X20 60 X 4.00 1000
JPI-RC-10B 180 76 500 X 90 4.00 9000 400X400X20 60 X 4.00 1000
JPI-RC-12 190 60 500 X 90 4.00 11000 400X400X20 60 X 4.00 1000
JPI-RC-12A 190 76 500 X 90 4.00 11500 400X400X20 60 X 4.00 1000
12000
H
190 60 500 X 90 4.00 10500 450X450X20 60 X 4.00 1500
REGULAR
JPI-RC-12B
JPI-RC-12C 205 90 500 X 90 4.50 12000 450X450X20 60 X 4.00 1200
ROUND CONICAL
T1
T
BOTTOM DIA (OUT SIDE)
S
P
P
S
*Specifications as per customer requirements BASE PLATE
9 10
Octagonal Poles Chart Octagonal Poles Drawing
H
JPI-OC-9B 170 60 4.00 8000 300x300x16 60 1000
REGULAR
JPI-OC-9C 170 60 4.00 8700 300X300X16 60 500
JPI-OC-10 170 60 4.00 9000 400X400X20 60 1000 OCTAGONAL
JPI-OC-10A 170 60 4.00 9700 400X400X20 60 1000 T1
10000
JPI-OC-10B 180 60 4.00 9000 400X400X20 60 1000
JPI-OC-10C 225 100 4.50 9500 470X470X20 60 500-1200
JPI-OC-12 190 60 4.00 11000 400X400X20 60 1000
JPI-OC-12A 190 60 4.00 11500 400X400X20 60 1000
T
12000
JPI-OC-12B 190 60 4.00 10500 470X470X20 60 1000-1500
JPI-OC-12C 225 100 4.50 11500 470X470X20 60 1220
JPI-OC-14 225 100 4.50 11000+4000 470X470X25 60 1220 BOTTOM DIA (OUT SIDE)
JPI-OC-14A 14000 250 114 5.00 10000+5000 470x470x25 60 500
JPI-OC-14B 325 125 5.00 8000+7000 600X600X30 60 1000-1200 S
P
P
S
*Specifications as per customer requirements BASE PLATE
7 8
Tubular Poles Chart Tubular Poles Drawing
A-L
Load for
Overall Tubular Poles
Effective Lengths of Weight of Working temporary
Ref No Length
Sections - (mm)
Out Side Diameter and Thickness (mm)
Pole Load deflection
H = Height of Poles
L-4
(mm) D4 x T 4 D = Diameter of Each Section
of 150 mm
L D E Section A Section B Section C Kg Kg Kg T = Thickness of Each Section
1 2 3 4 5 6 7 8 9 10 L = Length of Each Section
JP-1 7000 4000 1500 114.3 x 3.65 88.4 x 3.25 75 x 3.25 58.5 91 74.0 A-L = Arm Length
JP-3 7500 4500 1500 114.3 x 4.78 88.4 x 3.25 75 x 3.25 76.8 103 90.0
D3 x T 3 Base Plate
JP-7 8000 5000 1500 114.3 x 4.78 88.4 x 3.25 75 x 3.25 83.2 103 74.0
L = Length of Plate
L-3
JP-11 8000 5000 1500 165 x 4.85 140 x 4.85 114.3 x 3.65 135.0 233 254.8 W = Width of Plate
T = Thickness of Plate
JP-15 8500 5500 1500 140 x 4.85 114.3 x 3.65 88.4 x 3.25 114.0 155 126.0
C = Center to Center Distance of J-Bolts
WELDING
JP-17 8500 5500 1500 165 x 4.85 140 x 4.85 114.3 x 3.65 144.7 216 203.5
EQUAL TO OUTSIDE
JP-21 9000 6000 1500 140 x 4.85 114.3 x 3.65 88.4 x 3.25 122.3 144 116.7 DIA O OF POLE
SEE DETAIL- A
JP-23 9000 6000 1500 165 x 4.85 140 x 4.85 114.3 x 3.65 154.3 200 165.0
JP-24 9000 5000 2000 165 x 4.85 140 x 4.85 114.3 x 3.65 148.2 200 154.0 DETAIL- A
JP-27 9500 6500 1500 165 x 4.85 140 x 4.85 114.3 x 3.65 164.0 188 137.0
Thick
D2 x T 2
JP-30 9500 5500 2000 168 x 4.78 140 x 4.85 114.3 x 3.65 158 197 138.0 B
L-2
JP-31 10000 6000 2000 165 x 4.85 140 x 4.85 114.3 x 3.65 167.4 176 108.0
JP-33 10000 6000 2000 168 x 4.78 140 x 4.85 114.3 x 3.65 167.4 185 116.0 A
A x B x Thick(MM)
H
JP-35 10000 6000 2000 219.1 x 4.78 168.4.78 140 x 4.85 222 379 252.0 8mm O BOLT
STIFFENER
JP-36 10500 6500 2000 168 x 4.78 140 x 4.85 114.3 x 3.65 177 219 116.0 COPPER LUG
JP-39 10500 6500 2000 219.1 x 6.30 168 x 4.78 140 x 4.85 287.3 489 308.0
JP-40 11000 7000 2000 219.1 x 4.78 165 x 4.85 140 x 4.85 247.4 358 212.0
L
JP-45 12000 6000 3000 219.1 x 6.35 168.3 x 4.78 140 x 4.85 327 316 162.0 EARTH BOLT C
JP-47 12500 6500 3000 219.1 x 6.35 168.3 x 4.85 140 x 4.85 345.3 316 146.0
JP-49 13000 7000 3000 219.1 x 7.04 168.3 x 4.78 140 x 4.85 395 316 141.0
D1 x T1
L-1
W
C
STIFFENER
4-HOLES
L x W x THICK (MM)
THICK
D
BASE PLATE
*Specifications as per customer requirements
11 12
Pole Arms Pole Arms
13 14
Hinge Poles Definition Hinge
HingePoles
PolesDrawing
Drawing
The mid hinge or see saw pole is designed to allow maintenance of luminaires in areas where access to
the pole is restricted or limited. The hinging operation using a see saw principle allows the pole and
luminaire to be lowered to ground level without the need of any elevated works platform equipment
such as a cherry picker.
There is also no need for any expensive hydraulic raising and lowering equipment other than one
trained technician equipped with a rope.
Applications
• Airports
• Camera poles
• Street lighting under power lines
• Sporting ovals
• Lawn bowls club
• Multi level car parks
• Construction sites
• Mining sites
• Railway stations
• Car park lighting 25mm x 1500mm long
• Shopping centers
15 16
Guard rail Definition
Guardrails and traffic separators aim at making road safer for traffic, preventing vehicles from leaving
one carriage away out of control, and meeting traffic coming in the opposite direction.
Guardrails thus have standardized technical and mechanical features, in particular, they must be made
of steel beams which are neither too rigid not too elastic, but which are able to absorb impact. They
must also be supported by posts sunk in the terrain, Protective guardrails may be used for all kind of
roads, highways, clearways and mountain roads, as protection against sudden drops or escarpments,
bridges, river banks, canals etc.
The purpose of guardrails is to reduce the potential for the severity of accidents involving vehicles that
run off the road.
Guardrails
17 18
Guard rail Drawing Client
List of List
Clients
5m
1830
155
17. The Director of Industries, Government of Punjab.
310
30
18. Metro Bus Project – Lahore & Rawalpindi
97
19 20
Projects Pictures Projects Picture
21 22
Projects Pictures Client
Projects List
Pictures
19 20
Projects Pictures Projects Picture
Motorway
Motorway
Motorway
Ring Road Lahore
21 22
Contact information
Head Office
88 – Railway Road – Lahore
UAN: 111-808-909
Fax: 042 - 37650808
Factory
12-KM G.T Road – Lahore
Ph: 042-37960515-16
Fax: 042-37964416
Emails:
jamalpipe@yahoo.com
info@jamalpipe.com.pk
Website:
www.jamalpipe.com.pk
23
5L-0435