Rate Analysis of Super Structure
Rate Analysis of Super Structure
Rate Analysis of Super Structure
Unit = 1
Detail
Unit Qty Rate per Unit
A FABRICATION
A-1 MATERIAL
Fabrication of heavy steel work, with angle, tees, flat
iron,round iron and sheet iron for making trusses,
1 girders, tanks, etc., including cutting, drilling, revitting, Kg 100 156.7475
handling,assembling and fixing, but excluding erection
in position.
A-2 EQUIPMENT
A-3 MANPOWER
Total
17 Sundries = 10% 10
Total A
B TRANSPORTATION TO SITE
3 Mobile Crane (for Loading and Unloading) Per Hour 0.25 2887
2,363
2,486 MRS Input Rate of Equipment /
Machinery (EQ-12)
4,331 MRS Input Rate of Equipment /
Machinery (Add. Item 6)
2,205 MRS Input Rate of Equipment /
Machinery (EQ-11)
1483.8 MRS Input Rate of Material
(01.003)
1,575
Quotation attached
225 Quotation attached
330 Quotation attached
7,847
54,910
549