Livestock Poultry Projects
Livestock Poultry Projects
Livestock Poultry Projects
This IEE Checklist Report shall be used for proposed LIVESTOCK/POULTRY PROJECTs to be
located within Environmentally Critical Areas (ECA).
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if any,
following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and affected
areas and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization Scheme
(PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO 2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the blank spaces provided or
otherwise check () the appropriate boxes □ or parenthesis ( ). Boxes with check marks() are
automatically required. Use additional sheets if necessary and indicate this in the appropriate
space.
Misleading or erroneous answers are basis for legal actions and/or denial of ECC
issuance.
Total Project/Building
Footprint Area ______________________________________________________
(Area actually utilized)
Project Proponent: ______________________________________________________
______________________________________________________
1|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Office Address:
Contact Person: ______________________________________________________
Designation: ______________________________________________________
Contact Information
Telephone Number: _________________________________________
Fax Number: _________________________________________
Mobile Number: _________________________________________
E-mail Address: _________________________________________
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City,
Province
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
See attached vicinity map/s and photographs of the project site and site development/layout plan.
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify
datum used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
1.3 UTILITIES/REQUIREMENTS:
2|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Sources)
Water
(Total) 3
m /day
(Fill-up table below if water is not obtained
from the local water utility)
Water
3
(Rainwater Collection System) m /day
Water Source
[ ] ground water [ ] well [ ] spring [ ] others: ____________________________
Energy/Water Efficiency
3
Water m /day
1.4 MANPOWER
a. Construction Phase
Manpower Expertise/Skills Total
Requirement
b. Operation Phase
Manpower Expertise/Skills Total
Requirement
3|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
LAND
Consistency with land Current land use w/in 1km radius See attached proof of compatibility with
use (as per zoning ordinance): land use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
___________________
Disturbance to wildlife Existing vegetation in the area: Compliance with conditions of DENR/LGU Annual inspection of area Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA
Permit
replanted/ revegetated construction /operation cost
clearing
Marshland
Limit land clearing as much as possible
Grassland
Provide temporary fencing for vegetation
Mangrove that will be retained
Wetland Promote restoration of damaged or
Others, specify destroyed vegetation where possible (e.g.,
____________________ tree planting);
4|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Change in surface Slope: Provide erosion control and slope Regular inspection of slope Slope/ Erosion Control
landform/ topography/ flat (0-3%) protection measures protection measures in Cost: ___________
terrain/slope gently sloping to rolling (3- Designate a Spoils Storage Area, with erosion-prone areas Others, specify
18%) topsoil set aside for later use and allow Regular inspection for new ____________________
Soil Erosion steep (>18%) maximum re-use of spoils eroded areas near the site
Construction during dry season Others, specify
Stabilization of embankment with grasses ____________________
or other soil cover
Others, specify
_______________
Soil/Land contamination Existing soil type in the area: Implementation of the Ecological Solid Daily inspection of Cost integrated in the
due to improper solid sandy Waste Management Plan (ESWMP) waste/recycling bins for construction /operation cost
waste disposal
clay Set-up temporary fence around the segregation
construction area Daily inspection for presence
sandy-loam
Implement re-use and recycling of waste of mixed garbage in the
Others, specify materials facility
____________________
Implement proper segregation, collection Weekly inspection of waste
and disposal of domestic wastes in accumulated
designated areas Others, specify
Implement proper collection and _________________
processing of animal waste into organic
fertilizer
Implement proper collection, labeling and
storage of hazardous waste
5|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Provide receptacles / bins for solid wastes
Coordinate with the municipal / city waste
collectors
Engage third party company for waste
collection
Others, specify
________________
Impairment of visual Presence of visually significant Implement landscaping and other Regular inspection of Cost integrated in the
aesthetics landforms/landscape/structures? beautification measures landscaping and other construction/ operation cost
Devaluation of land Yes Provide adequate buffer beautification activities
values No Compensate adjacent property owners Regular monitoring of buffer
zones
Others, specify
Regularly monitor
________________
presence/absence of
complaints from adjacent
property owners
WATER
Increased siltation due Specify nearest/receiving water Set-up proper and adequate sanitary Regular (ocular) inspection of: Cost integrated in the
to project activities body:
____________________________
facilities Drainage / canal systems construction/ operation cost
Water quality Strictly require the contractor and its Water treatment facility (i.e.,
degradation Distance to nearest/receiving water workers to observe proper waste disposal grease trap, septic tank, etc.)
Others, specify body: and proper sanitation
__________________ 0 to less than 0.5 km
Strictly observe proper waste handling and Quarterly monitoring of the
disposal following:
0.5 to 1 km
Provision of wastewater treatment facility pH
More than 1 km (e.g. septic tank, oil and water separator, TSS concentration
etc.)
BOD
Provision of biogas generator or similar
Total Coliform
waste treatment measures
Set up silt trap/settling ponds to minimize
Color
6|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
downstream siltation Oil and Grease
If nearest/receiving water body is
Others, specify
___________
fresh water, specify classification:
AA
A
B
C
D
7|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Competition in water Size of population using receiving Implement rainwater harvesting and similar Regularly monitor Cost integrated in the
use surface water: measures as an alternative source of water presence/absence of construction/ operation cost
Depletion of water ≤ 1,000 persons Observe water conservation measures;
complaints
resources >1,000 and ≤ 5,000persons Careful selection of project site to avoid
Regular coordination with
concerned agencies
>5,000person disruption of traditional water uses
Regularly monitor
Obtain Water Permit from NWRB occurrences of water
Available/nearest water source.
Improve efficiency of water supply and shortages
Deepwell distribution system Others, specify
Water district/LGU Others, specify _______________________
Surface water _________________________
Others, specify
__________________
Increased occurrence Is the project site located in an area Use appropriate design for project facilities Regularly monitor Cost integrated in the
of flooding identified by MGB/PAG-ASA as
flood prone?
Implement appropriate drainage system
presence/absence of
complaints
construction/ operation cost
Yes
Regularly remove debris and other
Regular coordination with
materials that may obstruct water flow
No
concerned agencies
Use appropriate technology (e.g. raised
hand-pumps) to protect drinking water from
Regularly monitor increased
frequency of flooding
flood contamination
Others, specify
Others, specify
_________________
_________________________
8|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all emission Regularly monitor Cost integrated in the
0 to less than 0.5 km sources (e.g. vehicles, generator, etc) presence/absence of construction/ operation cost
0.5 to 1 km Install when applicable, the appropriate air
complaints
pollution control device/s
More than 1 km Regular (ocular) inspection of:
Strictly enforce good housekeeping
Absence of white or black
practices
smoke from vehicles,
Control vehicle speed to lessen generator, etc.
suspension of road dust
Presence of truck cover
Conduct water spraying to suppress dust during deliveries
sources and minimize discomfort to nearby
residents
Use covered vehicles to deliver materials
that may generate dust
Others, specify
_____________________
Nuisance due to Distance to nearest community: Regular clean-up of animal houses Regularly monitor Cost integrated in the
generation of 0 to less than 0.5 km Use of environment-friendly deodorizer or
presence/absence of
complaints
construction/ operation cost
obnoxious/unpleasant
odor 0.5 to 1 km odor masking substances
More than 1 km Spraying natural / microbial disinfectants
Provide adequate buffer and/or planting of
Is the wind direction blowing trees
towards the nearest community Others, specify
most of the year? ____________________
Yes
No
9|I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Nuisance due to noise Distance to nearest community: Properly handle animals and implement Regularly monitor Cost integrated in the
generation 0 to less than 0.5 km appropriate measures (e.g., continuous presence/absence of
complaints
construction/ operation cost
light, proper feeding) to prevent noise
0.5 to 1 km generation Regular monitoring of buffer
More than 1 km Properly operate and maintain all noise zones
sources (e.g. vehicles, boiler, generator,
etc)
Install when applicable, the appropriate
noise control device/s (e.g., mufflers,
silencer, sound barriers, etc.)
Implement appropriate operating hours
Provide adequate buffer and/or planting of
trees
Others, specify
_________________________
PEOPLE
Displacement of Size of population of host barangay: Provide relocation/disturbance Regularly monitor Cost integrated in the
residents in the project ≤ 1,000 persons compensation packages presence/absence of construction/ operation cost
site and within its
>1,000 and ≤ 5,000persons Prioritize local residents for employment complaints
vicinity
Regular coordination with
Displacement of >5,000person Promptly pay local taxes and other
financial obligations LGU
Indigenous People
Regular coordination with LGU Others, specify
Enhanced employment Classification of host barangay:
Prior consultation & coordination to
_________________
and/or livelihood Urban minimize disruption on daily domestic
opportunities
Rural activities & respect for IP rights and
Reduced employment cultural practices
and/or livelihood
opportunities Available services within/near the Ensure participation of IPs in consultations
host barangay: and dialogues
Increased revenues for
Schools (e.g. elementary, Provide appropriate traffic/warning signs,
LGU
high school, college) lighting, etc
Disruption/Competition
Health facilities (e.g., Others, specify
10 | I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
in delivery of public clinics, hospitals, etc.) _________________
services (e.g.,
education, peace and
Peace and order (e.g.,
police outpost, brgy. Tanod,
order, etc.) etc.)
Enhanced delivery of Recreation and sports
public services (e.g., facilities
education, peace and
order, etc.) Others, specify
Increase in traffic __________________
volume and worsening
of traffic flow
Impacts on community Regular coordination with LGU Regularly monitor Cost integrated in the
health and safety Provide appropriate warning signs, lighting presence/absence of construction/ operation cost
Others, specify and barricades, whenever practicable complaints
___________________ Observe proper housekeeping Regular coordination with
LGU
Provide on-site medical services for any
Regular submission of reports
emergency.
to concerned agency
Participate in public awareness programs
Others, specify
on health and safety
_________________
Regularly spray disinfectant, pesticides
and other similar substances when
applicable
Strictly comply with fire, safety and similar
regulatory requirements
Others, specify
__________________________
11 | I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
III. ABANDONMENT /DECOMMISSIONING/REHABILITATION POLICIES AND GENERIC
GUIDELINES (if Applicable)
Provide description of the Abandonment activities, such as, dismantling and waste disposal.
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Organization Chart:
12 | I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Attach site development/layout plan (with dimensions and descriptions)
13 | I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
Attach drawing/plan of waste water treatment facility (with dimensions and descriptions)
14 | I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s
SWORN STATEMENT OF ACCOUNTABILITY OF THE PROPONENT
This is to certify that all the information and commitments in this Initial Environmental
Examination (IEE) Checklist Report are accurate and complete to the best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising from any
misrepresentation or failure to state material information in this IEE Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant
exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.
15 | I E E C h e c k l i s t R e p o r t f o r L i v e s t o c k / P o u l t r y P r o j e c t s