Gasoline Station
Gasoline Station
Gasoline Station
INSTRUCTION MANUAL
Pursuant to the DENR Administrative Order No. 37, Series of 1996 and its procedural
manual, all gasoline, service and refueling station projects are considered
projects to be required by an Initial Environmental Examination (IEE) document and
need to secure an Environmental Compliance Certificate (ECC) from the DENR Regional
Offices prior to project construction and operation. As such, this Initial
Environmental Examination (IEE) Checklist was conceptualized to simplify the format
of the information needed to be submitted by all government and private sector
proponents applying for an ECC for a new proposed gasoline station. The information
contained in the checklist will serve as a basis for the review and assessment of
the information presented. However, should additional information be required in
order to have an informed decision, the proponent is therefore requested to submit
such. The IEE checklist will be reviewed by the DENR Regional OfficesEMPAS. This
checklist will also facilitate the processing of ECC application and to assist
project proponents and EIA prepares in the IEE preparation activity. 1.0 CONTENTS
This IEE Checklist is divided into four (4) major sections: Section 1: Section
2: consists of the information regarding the proponent; project location,
plan/design components and activities during the development and operation phase;
contains project components consists of the information regarding the description
of the existing environmental condition where the gasoline station will be located
the physical biological, socio-cultural and economic environment; consists of the
listing of possible potential impacts that may occur in the various stages of the
project establishment and operation; corresponding mitigation and enhancement
measures to prevent the occurrence of adverse impacts and strengthen the positive
effects of the project; contains the Effluent Monitoring Plan 1
Section 3:
Section 4:
Section 5:
IEE Checklist for Gasoline Station
Section 6: Section 7:
contains the Environmental Management Plan provides the commitment of the proponent
to follow the mitigation and enhancement measures indicated. consists of the
additional information that required to be incorporated
Annexes:
2.0
INSTRUCTIONS AND PROCEDURES FOR USE 2.1 The checklist need not be accomplished by
an accredited preparer. This can be done by the proponent or nay of his/her
authorized representative; Answer questions by selecting from a enclosed in the
box. list of pre-determined answers
2.2
To use this, put a check ( ) mark in the appropriate box. If your answer does not
fall in any of the pre-determined responses, check ( ) OTHERS and indicate your
specific answer in the blank space provided or use additional sheets as necessary.
If some questions are not applicable to your project, write N/A on the blank space
or column; 2.3 For the section on Impact Assessment and Mitigation, check ( ) the
columns of Y or N depending on what expected impact is applicable to your project
and provide the corresponding Mitigation/Enhancement measures for each identified
impact (with a YES answer) in the column provided. To facilitate and assist the
proponent in answering section 4.0 of this checklist, a menu is provided to serve
as a guide and reference. However, it should be noted that this only serves as a
menu checklist hence, proponents are highly encouraged to identify additional
impacts and mitigation/enhancement measures other than those provided in the menu;
2.4 For the section on Attachment or Annexes, put a check ( ) on the title or
description of the document that you are annexing in the report. The listed
documents are MUST requirements and should be submitted; Answers to the questions
should not be strictly confined to the predetermined responses. You can elaborate
and use as many additional sheet as you need to be able to provide adequate answers
to the required 2
2.5
IEE Checklist for Gasoline Station
information. Providing maps, pictures and drawings (e.g. charts, tables, diagrams,
sketches) and other visuals and attachments will better explain or describe the
information provided in the checklist. This will help facilitate the review and
decision on the projects application for an ECC. 2.6 All relevant engineering /
architectural drawings / plan s (duly signed by licensed architect / engineer /
environmental planner) and permits required should form part of the supporting
documents. This would include, among others, the following: 2.7 Site
development plan showing the proposed layout of streets, lots and other features in
relation to existing condition; Vicinity map within a radius of 2 kms. from the
periphery of the project 1:5000 m. Topographic plan of the project site.
Upon completion of the IEE checklist, the project proponent shall submit the form
to the DENR Regional Office-EMPAS where the project is to be located.
3
IEE Checklist for Gasoline Station
(Attach location map with important landmarks and access points indicated as Annex
1) 1.4 Project Category: Service Station Filling Station Curb Pump 1.5 Project Cost
Total Project Cost: (civil works and equipment) 1.6 Project Ownership: Type of
Owners: Single Proprietorship Corporation (Range)
Partnership/Joint Venture
Cooperative
4
IEE Checklist for Gasoline Station
1.7
2.2
2.2
2.3 Present Land Use Classification (based on the approved land use/zoning
ordinance of the city/municipality) Agricultural Industrial Commercial Residential
Forest Land Open Spaces Tourism Institutional Others, Pls. Specify:
5
IEE Checklist for Gasoline Station
Attach panoramic view of the project site and its immediate vicinity (north side
view from center of the project site).
Attach panoramic view of the project site and its immediate vicinity (south side
view from center of the project site).
6
IEE Checklist for Gasoline Station 3.0 PROJECT COMPONENTS 3.1 Services Vehicles per
Day Chemical to Be Used Vol. Of Chemicals to Be Used (liters per day) Vol. Of Water
to Be Used (liters per day)
Services
7
IEE Checklist for Gasoline Station
3.2
(Attach facilities design / lay-out plan) General lay-out plan of the gasoline
station.
8
IEE Checklist for Gasoline Station 3.3 Water Resources and Infrastructure a. Demand
Estimated daily water requirements of the proposed gasoline station?
b.
Supply/Sources b.1. Existing Public Water Water Source Existing Public Water Yes
No Remarks
b.2. Surface Water Water Source Name of Water Body Mode of devt. or distribution
Volume of Extraction
Location
Distance
b.3. Deep Well Water Source No. of Wells/Hand Pump/Tanks Discharge (liter / sec)
Location
Depth (m)
1. Deep Well w/ Manual Hand Pump 2. Deep Well w/ Electric or Motor Pump
9
IEE Checklist for Gasoline Station
b.4
c.
Water Treatment Is there provision for water treatment of your independent water
source? YES NO
Chlorinated
Filtration
3.4
Drainage System (Attach approved drainage layout plan as Annex Type of drainage: a)
b) Major Roads: Other roads: open canal open canal
Where does the drainage system drain? Public drainage system natural out fall /
water body
What water body (e.g. river/creek/stream) will serve as the out fall of the sewage
and drainage systems? ____________________________________________________
10
IEE Checklist for Gasoline Station 3.5 Power Supply Source of Power: Local Electric
Cooperative Own Generator Capacity:_________ Others, pls.
specify____________________
3.6
Sewage Disposal System Sewage System Individual Septic Tank Communal Septic
Tank
Sewage Design
2- chamber septic tank w/ leaching 2-chamber septic tank w/o leaching 3-chamber
septic tank w/ leaching 3-chamber septic tank w/o leaching 4-chamber septic tank w/
leaching 4-chamber septic tank w/o leaching Others, pls.
specify________________________________
(Attach sewage design / lay-out) signed and sealed. Sewage Disposal discharge to
an existing public sewerage system treated in a community disposal plant or
communal septic tank Treatment in individual septic tanks with disposal by
absorption field or leaching pit Others: (Specify)_________________________________
3.7 Wastewater Treatment Facility: Capacity of oil water separator : (in liters)
Attach Flowchart on liquid waste management Attach lay-out / detailed plan - Liquid
waste facility-main component - Wastewater treatment facilities
11
IEE Checklist for Gasoline Station 3.8 Used Oil Collection and Disposal System
Collection System No. Drums/month: ____________________________ Volume: Storage
Area: Disposal System Recycled Burning / Incinerator Sold to re-cyclers Others,
Specify _______________________________ _______________________________
3.9
12
IEE Checklist for Gasoline Station 3.10. Manpower and Employment (provide listing
of manpower requirements as Annex ) How many people will be employed by the
proposed gasoline and service station during: a) b) Pre-construction Period:
______________ Operation and Maintenance period: _________
13
IEE Checklist for Gasoline Station
4.
Do you know of any landsliding occurring or that has occurred in the site?
Attach photo of the areas topography (choose the view / perspective which shows
contours or areas w/ slopes)
14
IEE Checklist for Gasoline Station A. Physical Environment Components/ Parameters
5. Has the area experienced any flooding during the wet season or typhoons? If yes,
when was the last time the area was flooded? What caused the flooding? Yes No
Remarks Period(s) of flooding: _____________ Causes of flooding: { } low area { }
poor drainage { } water logged areas 6. Soil type of the area: { } Sandy soil { }
Clayey soil { } Sandy loam soil 7. Are there existing water bodies found near or
within the site e.g. creeks or streams? If yes, please enumerate them in the
opposite space and indicate their location Other soil types: _____________________
_____________________
(If they have no names, indicate the number of water bodies) * these water bodies
should be shown in the topographic map What are the present uses of the water
bodies within or near the project site? { { { { { boating, etc.) { 8. } } } } }
Bathing Washing Fishing Source of drinking water Recreation (swimming,
Is there an access road going to the project site? If yes, what is its distance to
the site _______km. Components/ Parameters
9.
What is the present land use of the area wherein the proposed gasoline and
refueling station be located? { } Prime agricultural land (productive/irrigated)
{ } Prime agricultural land (idle/abandoned) { } Grassland { } Built-up { } Orchard
{ } Marshal/Mangrove { } Fishpond { } Others, pls. specify:__________________
15
IEE Checklist for Gasoline Station Does the site conform to the approved land use
of the city/municipality? 10. Is the land allocation and alignment of the various
utilities integrated with the existing networks and projects outside of the
boundaries of the project site? Are there existing structures or developments
around the project site? If yes, please list them in the opposite space
11.
16
IEE Checklist for Gasoline Station B. Biological Environment Components/ Parameters
1. Are there existing trees and other types of vegetation in the project site? If
yes, please identify. Are there birds and other forms of wildlife found in the
area? Please identify. Are there fishery resources in the water bodies found near
or within the site? Please identify. Is the site near or within a watershed or
forest reservation area? If near, only, how near? ___________ m or km If within,
indicate name of the watershed or forest reservation area Is the gasoline station
adjacent to a natural ecosystem? Yes No Remarks
2.
3.
4.
5.
{ { { { {
} } } } }
C.
1.
Are there existing settlements in the proposed gasoline station? If yes, indicate
the number of: (within 50m radius) Households/Families:_____________ Legitimate
landowners: ___________ Tenants:_______________________ _
Squatters:______________________ Components/ Parameters Yes No Remarks
4.
17
IEE Checklist for Gasoline Station 5. How many of the total population have reached
the: Elementary level:______________ High School Level:_____________ College
Level:________________
6.
7.
(Attach photo)
18
19
Project Activities Affecting the Physical Environment 1. Will there be land and
vegetation clearing? If Yes, what is the total area to be cleared?
__________________(ha) Will there be trees to be affected during the clearing? If,
Yes, how many and what are these species of trees? No. Of Trees: _________________
Species: a. b. c. 3. Will there be demolition of existing structures? If yes, what
types of structures will be demolished? Types of Structures:
______________________________ _______________________________
_____________________________ 4. Will there be topsoil removal and replacement? If
yes, how much of the removed topsoil will be replaced? [ ] Entire volume [ ]
Partial only 5. If partial only, where will the rest of the topsoil be deposited?
Impact Description
Mitigation/Enhancement Measures
2.
9. 10. 11.
12.
Will temporary quarters or barracks and a field office be provided for construction
workers within the project site?
Yes
No
Impact Description
3. Will clearing activities affect any rare, threatened or endangered plant and
animal species?
4. Will there be trees to be affected (e.g. cut down; remove) during the clearing?
If yes, how many and what are these species of trees?
Yes
No
Impact Description
2. How will they be handled? Payment of property owners Temporary relocation site
to be provided Permanent relocation site to be established Eviction w/o
compensation Others, Pls. Specify: ________________
6. Will the project cause an increase in traffic or disrupt traffic in major routes
due to the entry and exit of construction equipment?
B.
3. Will there be an improved drainage and water supply system? 4. Will there be an
increase in surface run-off from the concreting of roads and soil surfaces?
5. Will there be reduced infiltration rate due to impermeable structures over the
ground? (Use additional sheets if necessary)
IEE Checklist Gasoline Station
23 6. Is the available domestic water supply enough to meet the maximum projected
water consumption of the gasoline station?
Project Activities Affecting the Biological Environment 1. Will the sewage out fall
and drainage system drain into the nearby or adjacent surface water body?
Yes
No
Impact Description
2. Will the waste disposal site be adequate to meet the projected solid wastes in
the area?
Yes
No
Impact Description
3.
4.
Is there a prevailing water shortage or water supply problem in the area? Are there
already existing commercial establishments within the vicinity of the project area?
5.
2.
3.
4.
5. Are there already existing commercial establishments within the vicinity of the
project area?
SECTION 5.0
EFFLUENT SOURCE
PARAMETERS TO BE TESTED
PERMITS/CLEARANCES
YES
NO
ACCOUNTABILITY STATEMENT
This is to certify that all the information and commitments in this Initial
Environmental Examination (IEE) Report are true, accurate and complete. Should I/we
learn of any information which would make the IEE accurate, I/we shall bring said
information to the attention of the appropriate EMB DENR Regional Office I/We
hereby bind myself/ourselves jointly and solidarily for any penalties that may be
imposed from any misrepresentations or failure to state material information in the
IEE. In witness whereof, I/we hereby set out hands this ______________day
of_____________ _________________ at ______________________________________.
ACKNOWLEDGMENT
BEFORE ME this ______ day of _________, 19 _____ at ____________, personally
appeared______________________ with Community Tax Certificate No.________ issued on
____________________ at ________________________, in his/her capacity as
______________________________ Notary Public Doc. No. Page No. Book No. Series of
__________ __________ __________ __________
IEE Checklist Gasoline Station