The document outlines the activities, responsibilities, and timelines for setting up 5G trial sites between VNPT and Ericsson.

Setting up the 5G trial sites involves activities related to site access, equipment installation, core network setup, transport network setup, and radio access network setup.

VNPT and Ericsson have different responsibilities (R, S, I) for the various activities like site access, hardware delivery, testing etc. as indicated in the responsibility matrix.

Resp.

# Activities list
VNPT
1 General
1.1 Project management A
1.2 Trial contract effective date n/a
1.3 Launching Event R
2 Site acces and Site installation readines befor 10-Nov-2019
2.1 Site access A/R
2.2 Tower space for 5G radio & antenna installation R
2.3 Power capacity for 5G equipmet R
2.4 Space for 5G indor equipment R
3 Transmission readines befor 10-Nov-2019
3.1 10Gps transmission bandwith at trial site R
3.2 Less then 5ms latency ping test from site to FPT server R
3 FTP server with readines befor 30-Oct-2019 R
4 CORE
4.1 Design & MOP preparation S
4.2 MME (upgrade for one node) S
4.3 EPG (upgrade for one node) S
4.4 EDA upgrade (upgrade one pair) S
4.5 Enable 5G EPC in Core Network S
4.6 ENM integration S
4.7 Standard test case I
5a TRANSPORT (28 GHz Trial)
5a.1 IP RAN/CORE Design S
5a.2 Router 6675 Integration and Commissioning S
5b TRANSPORT (Mid-band 3.5GHz Trial)
5b.1 IP RAN/CORE Design S
5b.2 Router 6675 Integration and Commissioning S
5c TRANSPORT (3rd Trial 2.6 GHz)
5c.a Router 6675 Integration and Commissioning S
6a RAN (28 GHz Trial)
6a.1 5G Trial supply and delivery hardware to VN port/air shipments I
6a.2 Customs clearances R
6a.3 Trial site survey and design R
6a.4 Tools & local materials S
x 6a.6 RAN Hardware delivery to site and CIC, CHC S
x 6a.6 Hardware installation (including Router 6675) S
6a.7 LTE + 5G NR integration & commissioning S
6a.6 Standard test case S
6a.9 Trial report I
6b RAN (Mid-band 3.5GHz Trial)
6b.1 5G Trial supply and delivery hardware to VN port/air shipments I
6b.2 Customs clerances R
6b.3 Trial site survey and design R
6b.4 Tools & local materials S
x 6b.6 RAN Hardware delivery to site and CIC, CHC S
6b.6 Hardware installation (total) S
6b.7 LTE + 5G NR integration & commissioning S
6b.6 Standard Test cases S
6b.9 Trial report if any I
7 Acceptance
7.1 Trial Acceptance test A
Resp. Matrix
Ericsson VTC

R I
n/a n/a
R R
usecase
I R
I I
I I
I I

I I
I I
I I

R I
R I
R I
R I
R I
R I
R I

R I
R I

R I
R I

R I

R I
S S
R R
R I
S R
S R
R S
R R
R R

R I
S S
R I
R I
S R
S R
R I
R R
R R

R R
Resp. Matrix
# Activities list
VNPT
1 General
1.1 Project management A
1.2 Trial contract effective date NA
1.3 Launching Event R
1.4 SW (RAN/TRAN) I
1.5 HW (RAN/TRAN) I
2 Site acces and Site installation readines befor 10-Nov-2019
2.1 Site access R
2.2 Tower space for 5G radio & antenna installation R
2.3 Power capacity for 5G equipment R
2.4 Space for 5G indor equipment R
3 Transmission readines befor 10-Nov-2019
3.1 10Gps transmission bandwith at trial site R
3.2 Less then 5ms latency ping test from site to FPT server R
4 FTP server with readines befor 30-Oct-2019 R
5 Use cases test R
6 CORE
6.1 Design & MOP preparation S
6.2 MME Configration and intergration S
6.3 EPG Configration and intergration S
6.6 EDA upgrade Configration and intergration S
6.6 CUDB upgrade Configration and intergration S
6.6 ENM Configration and intergration S
6.7 Standard test case I
6a TRANSPORT (28 GHz Trial)
6a.1 IP RAN/CORE Design S
6a.2 Router 6675 Integration and Commissioning S
6b TRANSPORT (Mid-band 3.5GHz Trial)
6b.1 IP RAN/CORE Design S
6b.2 Router 6675 Integration and Commissioning S
6c TRANSPORT (3rd Trial 2.6 GHz)
6c.a Router 6675 Integration and Commissioning S
7a RAN (28 GHz Trial)
7a.1 5G Trial supply and delivery hardware to VN port/air shipments I
7a.2 Customs clearances R
7a.3 Trial site survey and design R
7a.4 Tools & local materials S
x 7a.7 RAN Hardware delivery to site and CIC, CHC S
7a.7 Hardware installation (including Router 6675) S
7a.7 LTE + 5G NR integration & commissioning S
7a.7 Standard test case S
7a.9 Trial report I
7b RAN (Mid-band 3.5GHz Trial)
7b.1 5G Trial supply and delivery hardware to VN port/air shipments I
7b.2 Customs clerances R
7b.3 Trial site survey and design R
7b.4 Tools & local materials S
x 7b.7 RAN Hardware delivery to site and CIC, CHC S
7b.7 Hardware installation (total) S
7b.7 LTE + 5G NR integration & commissioning S
7b.7 Standard Test cases S
7b.9 Trial report if any I
8 Acceptance
8.1 Trial Acceptance test A
Resp. Matrix
EAB ETV/VTC

R
NA
R
R I
R I

R
I
I
I

I
I
I
NA

R
R
R
R
R
R
R

R
R

R
R

R
S
R
R
R
R
R
R
R

R
S
R
R
R
R
R
R
R

R
# Activities list
1 General
1.1 Project management
1.2 Trial contract effective date
1.3 Launching Event
4 CORE
4.1 Design & MOP preparation
4.2 MME Configration and intergration
4.3 EPG Configration and intergration
4.4 EDA upgrade Configration and intergration
4.5 CUDB upgrade Configration and intergration
4.6 ENM Configration and intergration
4.7 Standard test case
5a TRANSPORT (28 GHz Trial)
5a.1 IP RAN/CORE Design
5a.2 Router 6675 Integration and Commissioning
5b TRANSPORT (Mid-band 3.5GHz Trial)
5b.1 IP RAN/CORE Design
5b.2 Router 6675 Integration and Commissioning
5c TRANSPORT (3rd Trial 2.6 GHz)
5c.a Router 6675 Integration and Commissioning
6a RAN (28 GHz Trial)
6a.1 5G Trial supply and delivery hardware to VN port/air shipments
6a.2 Customs clearances
6a.3 Trial site survey and design
6a.4 Tools & local materials
6a.6 RAN Hardware delivery to site
6a.6 Hardware installation (including Router 6675)
6a.7 LTE + 5G NR integration & commissioning
6a.6 Standard test case
6a.9 Trial report
6b RAN (Mid-band 3.5GHz Trial)
6b.1 5G Trial supply and delivery hardware to VN port/air shipments
6b.2 Customs clerances
6b.3 Trial site survey and design
6b.4 Tools & local materials
6b.6 RAN Hardware delivery to site
6b.6 Hardware installation (total)
6b.7 LTE + 5G NR integration & commissioning
6b.6 Standard Test cases
6b.9 Trial report if any
7 Acceptance
7.1 Trial Acceptance test
ETV VTC

R I
n/a n/a
R R

R I
R I
R I
R I

R I
AR R

R I
R I

R I
R I

R I

R I
NA NA
I R
R I
NA NA
S R
R I
S R
R S

R I
NA NA
R I
R I
NA NA
S R
R I
AR R
R R

R R