ZahoorAhmed Resume
ZahoorAhmed Resume
ZahoorAhmed Resume
in
Zahoor Ahmed N Phone No. : +91-09884152126
M.Tech (CAD/CAM), B.E.(Mechanical)
Professional Summary
An open minded, result-driven professional having 15+ years of experience. Have great experience,
o In bulk material handling for EPC companies like Design of Thermal Power Plant etc.
o Have excellent knowledge on coal handling plant equipment
o Have experience in Design, Engineering and Estimations
Highly skilled at interfacing with the customer and resolving their issues with a quick turnaround time.
Have excellent leadership, managerial abilities, interpersonal and follow-up skills. Creative thinker and analytical
problem-solver with demonstrated ability to manage projects from planning through execution/completion under
the pressure of fast-paced, time-sensitive environments.
Have experience working with great clients like Odisha Power Generation Corporation, Thermal Power tech
Corporation, Mangalore Petrochemicals & Refineries, Visakhapatnam Steel Plant, Lignite handling System at
Neyveli, Udipi Thermal Power Project etc.
Foreign visit: Visited Hunan Changzhong Heavy Machinery Limited , Changsha –China for drawing approval of
Stacker cum Reclaimer and Ring Granulator GA drawings
Some of the day-to-day activities involve
o System Design of Bulk Material handling System which includes Design calculations of Belt conveyors,
bucket Elevators, screw conveyors, screens, Rack & Pinion gates, rod gates etc. , each & every equipment
of the whole system.
o Preparation of Indents (BOC, raw material, Hardware), Data sheets
o Involved in standardization of equipment’s design
o Involved in all Project Coordination with intra & inter departments (Electrical, Control& Instrumentation,
Water Systems, Fire Fighting, Piping) as a Project Coordinator
o Preparation of Design Schedules, Man hours
o Going for Technical Discussions with client before order Finalization only for Technical purpose
o Conducting seminars on Design aspects for the Trainees
Education
Vellore Institute Of Technology(VIT), M.Tech [CAD/CAM], 2004, 77%
Madras University - ST, PETER’S ENGINEERING COLLEGE, Chennai, B.E in MECHANICAL Engineering., April 2001
Doveton Corrie Boys H.S.S, Chennai, Apr 1997, HSC, 77%
Technical Skills
C Drafting Package : AutoCAD.
Modeling Package : Pro-E.
Professional Organizations
BGR Energy Systems Ltd, Senior Manager, Dec 2010 till date
Tecpro Systems Ltd, Sr. Design Engineer, Oct 2005
Japstech Engineers Limited, CADD Engineer., Sep 2004
Zahoor Ahmed N
Professional Experience
Arranges for purchase of equipment, materials, or parts and evaluates them according to specifications and quality
standards.
Maintaining project schedule by monitoring project progress; coordinating activities; resolving problems.
Project Handled:
Design and Engineering from Wagon Tippler (or) Track hopper up to feeding Coal to Coal Bunkers. The Project
consists of equipments like Wagon Tippler, Paddle Feeder, Stacker cum Reclaimer, Vibrating Grizzly feeder, Vibrating
feeder etc. This plant comprises of Track Hopper, Crusher House, Emergency reclaim hopper, Fixed tripper,
Travelling Tripper and other related equipments etc.
Design and Engineering from Track hopper up to feeding Coal to Coal Bunkers. The Project consists of equipments
like Paddle Feeder, Stacker cum Reclaimer, Vibrating Grizzly feeder, Vibrating feeder etc. This plant comprises of
Track Hopper, Crusher House, Emergency reclaim hopper, Fixed tripper, Travelling Tripper and other related
equipments etc.
2
Zahoor Ahmed N
Power plant capacity : 2 X 660MW
Scope of supply : Balance of plant (BOP)
Coal conveying capacity(Stacking) : 4000 TPH
Coal conveying capacity(Reclaiming) : 3000 TPH
Design and Engineering of Coal handling plant from under Surge hopper up to Bunker floors. The project consists of 13
Transfer towers, 1 Crusher cum Screen House with equipments such as Belt Conveyors, Stacker cum Reclaimer, Ring
Granulator, Grizzly Screen, Fixed Tripper, Travelling Tripper and related material handling equipments.
Role: Basic Engineering, detail Engineering and sizing calculations for conveying system. Raising PR for Material Handling
Equipment (Belt Weigh Scale, Magnetic Separator, Elevator, Crusher, Vibrating Screen, Travelling Tripper, Idlers, Sampling
Unit, Apron Feeder, Belt Vulcanizer, Flap Gate, Diverter Gate, Rack & Pinion gate, Screw Take-up, Hoists and Crane etc.) as
Responsibilities
Basic Engineering
Study of tender specification for coal handling plant.
Review of Coal Handling Plant Layout, Flow Diagram & Combined Elevation.
Preparation & review of Design basis report (DBR) for coal handling plant.
Preparation & review of Belt conveyor design calculation as per IS: 11592.
Selection of belt conveyor components like pulleys, belt, idlers, motor, gearbox, couplings, brakes, bearings along
with plummer block etc.
Pump sizing and Pump Head calculations
Review of General arrangement drawings for transfer towers and conveyors.
Bought out items
Review of Technical specification and data sheet for Belt conveyor components & coal Handling Plant equipment
for enquiry
Review of schedules like pulley schedule, Idler schedule, Belt schedule, scrapper schedule, Hoist schedule etc. for
enquiry
Preparation & review of Technical comparison and evaluation report for bought out items from various offers
Creation of purchase requisition and release of purchase requisition for bought out items through SAP
Review of vendor equipment documents like drawings, calculations etc. after award of contract
Coordinate with Consultant/Client and inter departments
Coordinate with consultant/client for approval of GA drawings and Vendor equipment drawings
Issuing input load data and mechanical GA drawings to Civil & structural department
Review of civil & structural drawings of inter departmental clearance for all towers and buildings
Issuing electrical feeder list for various equipment in coal handling plant to electrical department
Review of control philosophy of various equipment in coal handling plant
3
Zahoor Ahmed N
Coordinate with piping department for pump house location and water requirement in CHP
Coordinate with project department for scheduling of project activities
Coordinate with purchase department for procurement of various equipment in CHP
Utility systems
Preparation of Design basis report (DBR) for Dust extraction system.
Preparation of Design basis report (DBR) for Tunnel Ventilation system.
Preparation of DBR and review of P& I diagrams for Dust suppression system (Plain water & Dry Fog).
Foreign Visit: Visited Hunan Chagzhong Heavy Machinery Limited , Changsha –China for drawing approval of Stacker cum
Reclaimer and Ring Granulator GA drawings.
2. Company :- Tecpro Systems Ltd is a Fast growing company in the field of Bulk Material Handling. The company has executed large
number of projects in the core sector industry like Steel, Power, Mines, Cement Plants, etc. on Turnkey basis. TSL also has a state of art
manufacturing facility at Delhi and Haryana.
Project Handled:
1. Project : Mangalore Petro Chemicals & Refineries-Phase 3
2. Project : Design and Engineering of a Raw Material Handling Plant for VISAKHAPATNAM STEEL PLANT – 6.3MTPA
3. Project : Design and Engineering of 2 x 250 MW Thermal Power Plant Lignite handling System at Neyveli
4. Project : Design and Engineering of Udipi Thermal Power Project (Ash Handling System) - Lanco
4
Zahoor Ahmed N
Consultant : TCE, Bangalore
Major equipment : 4 Conveyors, 2 Junction Towers
Responsibilities:
System Design of Bulk Material handling System which includes Design calculations of Belt conveyors, bucket
Elevators, screw conveyors, screens, Rack & Pinion gates, rod gates etc. , each & every equipment of the whole
system.
Preparation of Indents (BOC, raw material, Hardware), Data sheets.
Checking of fabrication drawings of galleries, trusses & all structural equipments.
Involved in standardization of equipments design.
Involved in all Project Coordination with intra & inter departments as a Project Coordinator.
Preparation of Design Schedules, Man hours.
Attending the Order Transfer Meetings from Designs, Preparation of Scope Sheets etc.
Estimation of total Project cost after handed over the Project to the Design Department from estimation (Cross
checking) whether the project fulfills the Design aspects or not if not going for optimization.
Going for Technical Discussions with client before order Finalization only for Technical purpose
Conducting seminars on Design aspects for the Trainees.
Personal Details