62) Welding procedures may require welds to be deposited at a controlled rate heat input. High heat input would:
63) The need for pre-heat for steel will increase if:
66) When 2 different material types are welded together, the joint may be referred to as……..
a. a composite joint
b. a transition joint
d. either b or c
67) Which of the following can arise from copper inclusions in a ferrite steel weld?
b) HAZ cracks
c) Lamellar tearing
d) Porosity
(a) A material used to clean surfaces of the joint through continued chemical reaction
(b) A material used to protect the molten weld pool during welding
A. carbon dioxide
B. argon
C. Helium
D. oxygen
a. E 38 3 R
b. E 6013
c. E 7018 - G
d. E 51 33 B
A....warping
B....cold cracking
C....hot cracking
A...ultrasonic
B...Sulphur painting
C....Visual examination
74) Low temperature heating giving rise to the small readjustment in the position of the atoms is known
A... re crystallsation
B... recovery
C...grain growth
D.. Annealing
75) If too great forging reduction is attempted in one operation may occur
C...forging buts
D.....forging laps
B.....shrinking cavities
C....hydrogen cracks
A. TIG autogenous
C. FCAW
78) MIG/MAG welding what would be affected if the CTWD was extended?
a. amperage
b. voltage
c. inductance
d. travel speed
79) Which of the following discontinuities could be as a primary processing discontinuity often found in cast material?
(c) Porosity
80) Which of the following steels is likely to be more susceptible to hydrogen cracking?
A...highly reactive
B...inert
C...metallic in nature
82) Which electrodes are very susceptible to causing porosity in the deposited welds if long arc employed?
a) Basic
b) Cellulosic
c) Rutile
83) According EN 22553, if the symbol is on the identification line where does the weld go?
a. On both sides
84) You are to oversee the arc welding of some machined fittings and find they are cadmium plated. Would you:
86) Many of the meters, instruments & controls of the welding machine are not working proper and their calibration certificate are also out
date. What will you do?
c. Stop welding until corrective measures are completed to rectify the situation
d. Being welding and then report to their management when time is available
A...Saw
B...MMA.
C...GMAW
D...Friction welding
89) A plug weld and a slot weld differ in which of the following
a. sign waves
b. oxides
c. surface inclusions
A IRON POWDER
B BASIC
C CELLULOSIC
D RUTILE
a. in the HAZ
94) WHICH OF THE FOLLOWING MAY INCREASE THE RISK OF HAZ CRACKING WHEN WELDING THICK SECTION
CARBON MANGNESE STEELS ?
95) The welder have increased the electrode strike out length of the SAW set, what would be effect on the weld?
A. No effect
D. The deposition rate will be greater if wire feed rate is increased also
96) If the heat input in the process is increases then which of following statement is correct ?
A. CTOD
D. IZOD
C. The time taken of the gamma source to reduce the strength by half
99) A CODE GIVES THE ACCEPTANCE STANDARD FOR EXSCESS WELD METAL “h” AS: H < 1mm + 0.1 b MAX. 5 mm
WHERE “b” IS THIE WIDTH OF THE CAP. FOR WHICH OF THE FOLLOWING ALTUATIONS IS THE ESCESS WELD METAL
ACCEPTABLE.
A. b=15 H=3.0
B. b=22 H=3.0
C. b=28 H=4.0
D. b=40 H=5.4
100) How are the tack weld lengths during assembly and fit-up determined?
The arc is formed between the tip of electrode and the work place is requires special purpose electrodes with thick flux coatings to generate
a strong arc force and gas stream
104) Which of the following would you not need to check in a welding consumable store?
b. Quarantine consumables
d. the humidity
105) which of the following welding process uses a resistive heating system to achieve weld metal deposition???
1.MMA
4.FRICTION WELDING
a. thin plate
b. tee joint
d. none of these
107) Which of the following electrodes is the most likely to contain the largest quantity of combustible organic compounds?
a. Basic
b. Acidic
c. Rutile
d. Cellulose.
108) which of the following in a fusion weld usually has the highest tensile strength???
1.weld metal
2.parent metal
3.haz
4.fusion zone
109) When referring to TIG welding, the shielding gas could be;
1. ARGON+HYDROGEN
2. ARGON+HE.
3. ARGON+NITROGEN
1. Rutile
2. Basic
3. Cellulosic
4. Iron powder
111) What destructive test would be required to ascertain the likelihood of crack in the HAZ of a weld
a. nick break
c. charpy impact
d. macro test
c. excessive OCV
d. excessive amps
113) Voltage and amperage meter have been removed from MIG/MAG(GMAW) calibration invalid, the equipment should be
a. quarantined
114) Rutile electrodes are often sold packed in cardboard box covered with a plastic film, if upon you found they were damp and the ends
were rusting what course of action would you recommended?
C. Quarantine them
117) In general it is not easy to mechanise the MMA welding process because :
(a) Short electrode length, the control of the arc length and the process uses A flat characteristic.
(b) Short electrode length, the control of the arc length and flux coverings.
(c) The control of the arc length, stop start problems and short electrode length,
(d) Flux coverings, short electrode lengths and relationship between amps And volts.
118) Clustered porosity found internally in the body of a C-Mn in the MMA welding is usually associated with
119) High intensity energy beams are associated with which of the following welding processess
a. Laser
b. Electron beam
c. Plasma
(b) Should be heated prior to welding to obtain a low H2 content in the weld.