Project PROPOSED VIVO GARDEN

Location Caimito St., cor Lapulapu St. & Gen Pio Valenzuela St.,, Caloocan City
Subject Bill of Quantities for Bored Piling Foundation Works

Item Description Qty Unit

BORED PILING - 185 pcs


Excavation 5,167.99 cu.m
Formworks 13,738.46 sq.m
Concreting 3,975.40 cu.m
Rebars 621,322.50 kg

PILE CAP
Excavation 19,555.09 cu.m
Formworks 1,727.85 sq.m
Concreting 10,530.13 cu.m
Rebars 636,437.43 kg
Unit Cost Amount
Project PROPOSED VIVO GARDEN
Location Caimito St., cor Lapulapu St. & Gen Pio Valenzuela St.,, Caloocan City
Subject Bill of Quantities for Bulk Excavation and Bored Piling Works

Item Description Qty CCFG


GENERAL REQUIREMENTS
Mobilization/Demobilization 1.00
Permits by Client
Bonds, Insurances, CARI 1.00
Temporary Facilities 1.00
Utilities (Power and Water Supply) By Client 1.00
Material Handling 1.00
Safety Requirements 1.00
Management Supervision 1.00
Survey and Lay-out 1.00
Site Security 1.00

SITE WORKS
Bulk Excavation 20,747.70
Excavation - Bored Pile 3,975.38
Hauling and Disposal of Excavated Soil 24,723.08
Slope Protection 1.00

BORED PILING WORKS


Drilling works
185 pos x 1.2m dia x 19m 3,515.00
Temporary Casing 185.00
Supply of Rebars 621,322.50
Fabrication and Installation of Rebar Cage 621,322.50
Supply of Ready Mixed Concrete 3,975.40
Concreting by Tremie Method 3,975.40

PILE TESTING
Pile Dynamic Test (PDA Test) 10.00
Pile Integrity Test (PIT Test) 20.00
Unit Unit Cost Amount

lot 2,000,000.00 2,000,000.00


-
lot -
lot -
lot -
lot 250,000.00 250,000.00
lot 300,000.00 300,000.00
lot 300,000.00 300,000.00
lot . .
lot -
2,850,000.00

cu.m 350.00 7,261,695.00


cu.m -
cu.m 250.00 6,180,770.00
lot -
-
-
-
l.m 5,500.00 19,332,500.00
pos -
kg 47.00 29,202,157.50
kg 12.00 7,455,870.00
cu.m 7,200.00 28,622,880.00
cu.m 1,250.00 4,969,250.00
-
-
pcs 250,000.00 2,500,000.00
pcs 200,000.00 4,000,000.00
109,525,122.50

112,375,122.50
PILE CAP

foundation n x y t L A
1.00 14.10 58.00 2.80 336.00 940.80
2.00 6.70 15.40 2.80
3.00 6.70 7.40 2.80
4.00 6.70 15.40 2.80
5.00 8.50 58.00 2.80
6.00 10.40 2.60 2.80
7.00 10.40 2.30 2.80
8.00 8.50 58.00 2.80
9.00 6.70 15.40 2.80
10.00 6.70 7.40 2.80
11.00 6.70 15.40 2.80
12.00 14.10 58.00 2.80
13.00 6.70 9.50 4.50 32.30 145.35
14.00 6.70 9.50 4.50 32.30 145.35
15.00 10.40 10.00 4.50 45.70 205.65
16.00 6.70 9.50 4.50 32.30 145.35
17.00 6.70 9.50 4.50 32.30 145.35

extra
1.00 2.80 1,727.85
side
1.00 173.20
12.00 172.90
13.00 32.30
14.00 32.30
15.00 45.70
16.00 32.30
17.00 32.30

excavation

2.90

3,523.30
BORED PILE less n h r �=𝜋𝑟^2
excavation 185.00 24.70 0.60 3.14
less 185.00 5.70 0.60 3.14 1.13
no of bars length
sp top bottom top bottom
V x y x y x y x
2,289.84 0.15 386.67 94.00 386.67 94.00 5,452.00 5,452.00 5,452.00
288.90 0.15 102.67 44.67 102.67 44.67 687.87 687.87 687.87
138.82 0.15 49.33 44.67 49.33 44.67 330.53 330.53 330.53
288.90 0.15 102.67 44.67 102.67 44.67 687.87 687.87 687.87
1,380.40 0.15 386.67 56.67 386.67 56.67 3,286.67 3,286.67 3,286.67
75.71 0.15 17.33 69.33 17.33 69.33 180.27 180.27 180.27
66.98 0.15 15.33 69.33 15.33 69.33 159.47 159.47 159.47
1,380.40 0.15 386.67 56.67 386.67 56.67 3,286.67 3,286.67 3,286.67
288.90 0.15 102.67 44.67 102.67 44.67 687.87 687.87 687.87
138.82 0.15 49.33 44.67 49.33 44.67 330.53 330.53 330.53
288.90 0.15 102.67 44.67 102.67 44.67 687.87 687.87 687.87
2,289.84 0.15 386.67 94.00 386.67 94.00 5,452.00 5,452.00 5,452.00
286.43 0.15 63.33 44.67 63.33 44.67 424.33 424.33 424.33
286.43 0.15 63.33 44.67 63.33 44.67 424.33 424.33 424.33
468.00 0.15 66.67 69.33 66.67 69.33 693.33 693.33 693.33
286.43 0.15 63.33 44.67 63.33 44.67 424.33 424.33 424.33
286.43 0.15 63.33 44.67 63.33 44.67 424.33 424.33 424.33

10,530.13

386.67 94.00 386.67 94.00 1,082.67 263.20 1,082.67

5.00
5.00
4.00
4.00
4.00
4.00
4.00

10,530.13
10,217.57
20,747.70

1,192.61
gth wt (kg)
bottom bar dia unit wt top bottom
y x y x y
5,452.00 32.00 6.31 34,418.48 34,418.48 34,418.48 34,418.48
687.87 32.00 6.31 4,342.50 4,342.50 4,342.50 4,342.50
330.53 32.00 6.31 2,086.66 2,086.66 2,086.66 2,086.66
687.87 32.00 6.31 4,342.50 4,342.50 4,342.50 4,342.50
3,286.67 32.00 6.31 20,748.73 20,748.73 20,748.73 20,748.73
180.27 32.00 6.31 1,138.02 1,138.02 1,138.02 1,138.02
159.47 32.00 6.31 1,006.71 1,006.71 1,006.71 1,006.71
3,286.67 32.00 6.31 20,748.73 20,748.73 20,748.73 20,748.73
687.87 32.00 6.31 4,342.50 4,342.50 4,342.50 4,342.50
330.53 32.00 6.31 2,086.66 2,086.66 2,086.66 2,086.66
687.87 32.00 6.31 4,342.50 4,342.50 4,342.50 4,342.50
5,452.00 32.00 6.31 34,418.48 34,418.48 34,418.48 34,418.48
424.33 32.00 6.31 2,678.82 2,678.82 2,678.82 2,678.82
424.33 32.00 6.31 2,678.82 2,678.82 2,678.82 2,678.82
693.33 32.00 6.31 4,377.01 4,377.01 4,377.01 4,377.01
424.33 32.00 6.31 2,678.82 2,678.82 2,678.82 2,678.82
424.33 32.00 6.31 2,678.82 2,678.82 2,678.82 2,678.82

263.20 32.00 6.31 13,669.75 3,323.16 13,669.75 3,323.16

866.00 20.00 2.47 2,135.56


864.50 20.00 2.47 2,131.86
129.20 20.00 2.47 318.61
129.20 20.00 2.47 318.61
182.80 20.00 2.47 450.78
129.20 20.00 2.47 318.61
129.20 20.00 2.47 318.61
636,437.43