PPAP WORKBOOK
The forms provided in this workbook, or similar forms that provided the same information, are to be
used when submitting PPAP documentation to MTD.
Notes:
1.We did not do PPAP for Bought out parts 738_04205, 741_04107 and 750_04347.
2.DFMEA,control Plan Special Characteristics, Performance Test Results, Appearance
Approval Report are not applicable. 3. We did R&R and process capability studies for
key characteristics identified in the drawing.4. 707_0634 is Changed to 707_04951
Which is not yet practically incorporated. Hence we assumed 0634 as obsolete part and
we did not do PPAP for this.5. We will Submit PPAP for 4951 when it is produced.
The fonts hyperlinked below are used in this workbook and must be loaded.
Loading instruction will vary based on the Windows version loaded on your computer.
..\GDT.TTF
607_04145A
Collection Date: Collected by:
June 20,2006
-- MTD June20,2006
R.Kesavan 0
-- -- T00
Key Char. #
Print Ref. #
INSPECT
STORE
MOVE
PRODUCT AND
OP #
738_04205, 607_04147 & ESAB MIG Welding M/C. Current & voltage
707_04951 Tack welding. Welding fixture. Welding controllers. Welding fixture.
30 current 80-140A. Welding
voltage 18-24V.
738_04205 & 707_04951 -- ESAB MIG Welding M/C. Current & voltage
Full linear welding. Welding current 80-140A. controllers.
40 Welding voltage 18-24V.
707_04753 Full linear -- ESAB MIG Welding M/C. Current & voltage
welding with above welded Welding current 80-140A. controllers.
50 parts. Welding voltage 18-24V.
707_04746 Tack & Full -- ESAB MIG Welding M/C. Current & voltage
linear welding with above Welding current 80-140A. controllers.
60 welded parts. Welding voltage 18-24V.
750_04347 Half run & Full -- ESAB MIG Welding M/C. Current & voltage
linear welding with above Welding fixture. Welding controllers. Welding fixture.
70 welded parts. current 80-140A. Welding
voltage 18-24V.
Final inspection check all major & key Inspect asper Final
130 characteristics inspection report.
Key Char. #
Print Ref. #
INSPECT
STORE
MOVE
PRODUCT AND
OP #
OPERATION PROCESS CONTROL
DESCRIPTION CHARACTERISTICS METHODS
Occurrence
Detection
Severity
Potential
R.P.N.
Class
OP #
Recommended
Item/Function Potential Failure Mode Potential Effect(s) of Failure Cause(s)/Mechanism(s) of Current Design Controls
Actions
Failure
Not Applicable
Occurrence
Detection
Severity
Potential
R.P.N.
Class
OP #
Recommended
Item/Function Potential Failure Mode Potential Effect(s) of Failure Cause(s)/Mechanism(s) of Current Design Controls
Actions
Failure
Action Results
Responsibility
R.P.N.
Occur
and Target Date
Dect
Sev.
Actions Taken
Action Results
Responsibility
R.P.N.
Occur
and Target Date
Dect
Sev.
Actions Taken
Occurrence
Class
Detection
Severity
R.P.N.
OP #
10 Receipt of Wrong material / wrong Will not withstand load Incorrect material 2 Cross verification 2 28
750_04347 Tube, size specification given to supplier
741_04107 Bush & 7 by IRIS
738_04205 Spacer
20 Receiving Releasing sheet to Affect the machine / will not - Less awareness about 4 Software available to restrict 3 84
inspection production without withstand loads. consequences of not issue from stores without
7
inspection inspecting. inspection.
30 738_04205, Location / Positions of Vehicle low Performance Over look by Operator 5 Visual Inspection by Operator 2 70
607_04147 & subparts / Line Inspection / Proper
707_04951 Tack 7 Cleaning of Jig & Fixtures
welding.
Incomplete Welding Joints will break due to less - Operator fault 5 Visual Inspection by Operator 2 60
weld strength 6 / Line Inspection
40 738_04205 & Location / Positions of Vehicle low Performance - Over look by Operator 5 Visual Inspection by Operator 2 70
707_04951 Full subparts, incomplete MIG / Line Inspection
linear welding. welding 7
Incomplete Welding Joints will break due to less - Operator fault 5 Visual Inspection by Operator 2 60
weld strength 6 / Line Inspection
Occurrence
Class
Detection
Severity
R.P.N.
OP #
50 707_04753 Full Location / incomplete Fitment Problem - Operator fault 5 Visual Inspection by Operator 2 70
linear welding with MIG welding / Line Inspection
above welded parts. 7
Incomplete Welding Joints will break due to less - Operator fault 5 Visual Inspection by Operator 2 60
weld strength 6 / Line Inspection
60 707_04746 Tack & Location / incomplete Fitment Problem - Operator fault 5 Visual Inspection by Operator 2 70
Full linear welding MIG welding / Line Inspection
with above welded 7
parts.
Incomplete Welding Joints will break due to less - Operator fault 5 Visual Inspection by Operator 2 60
weld strength 6 / Line Inspection
70 750_04347 Half run Location / Positions of Fitment Problem - Operator fault 5 Visual Inspection / Welding 2 70
& Full linear welding subparts, incomplete MIG Fixture
with above welded welding 7
parts.
Incomplete Welding Joints will break due to less - Operator fault 5 Visual Inspection by Operator 2 60
weld strength 6 / Line Inspection
80 Trueing Trueing not done Fitment Problem 7 - Improper identification 6 Tag Control 3 126
90 Line Inspection Line inspection not being Possibility out of - Less awareness 5 Tag Control / Welding Fixture, 3 105
done specification part reaching Final Acceptance Gauge
7
customer
Occurrence
Class
Detection
Severity
R.P.N.
OP #
100 Powder coating Peel off / Coating Rust formation / Asthetics - Pretreatment / Duration of 2 Receiving inspection 3 36
thickness 6 Coating
110 Receiving Receiving inspection not Possibility out of - Less awareness 5 Tag Control 3 105
Inspection being done specification part reaching 7
customer
120 741_04107 Bush Position Offset Fitment Problem - Improper Pressing 3 Line inspection / Visual 3 63
pressing 7 Inspection
130 Final inspection Final inspection not done Possibility of out of spec. Less awareness 5 Tag control 3 105
part reaching customer 7
Action Results
Responsibility
R.P.N.
Occur
and Target Date
Dect
Sev.
Actions Taken
Action Results
Responsibility
R.P.N.
Occur
and Target Date
Dect
Sev.
Actions Taken
Action Results
Responsibility
R.P.N.
Occur
and Target Date
Dect
Sev.
Actions Taken
20 Receiving 1 Thickness,M As Per Verifications of Measuring Tape, Asper Every lot Check / Verify
Inspection aterial Spec Drawing dimensions Vernior, Mic sampling dimensions,R&
plan R
reports,Proces
s capability
asper inpection
layout.
30 Welding of ESAB MIG 1 Tack Weld Refer Work 0.1/ 0.005 Magnetic 5 No's Once/Shi FOI/ LOI Inform supervisor
738_04205,607_04 Welding M/C , Standard / block,lever dial ft
147 &707_04951 Welding Master or CMM
Fixture Sample
2 Tube Refer Work 0.04 Magnetic 5 No's Once/Shi FOI/ LOI Inform supervisor
distance Standard / block,lever dial ft
Master or CMM
Sample
40 Welding of ESAB MIG 1 Full Linear Refer Work 0.1 Visual 5 No's Once/Shi FOI/ LOI Inform supervisor
738_04205 & Welding M/C Weld Standard / ft
707_04951 Master
Sample
50 Welding of ESAB MIG 1 Full Linear Refer Work 0.1 Visual 5 No's Once/Shi FOI/ LOI Inform supervisor
707_04753 Welding M/C Weld Standard / ft
Master
Sample
60 Welding of ESAB MIG 1 Tack Weld Refer Work 0.1 Visual , Snap 5 No's Once/Shi FOI/ LOI Inform supervisor
707_04746 Welding M/C, Standard / Gauge ft
'C' Clamp Master
Sample
2 Full Linear Refer Work 0.1 Visual 5 No's Once/Shi FOI/ LOI Inform supervisor
Weld Standard / ft
Master
Sample
70 750_04347 Half ESAB MIG 1 Tack Weld Refer Work 0.1 Visual 5 No's Once/Shi FOI/ LOI Inform supervisor
run & Full linear Welding M/C , Standard / ft
welding with above Welding Master
welded parts. Fixture Sample
ESAB MIG 2 Full Linear Refer Work 0.1 Visual 5 No's Once/Shi FOI/ LOI Inform supervisor
Welding M/C Weld Standard / ft
Master
Sample
80 Trueing Manual 1 Position As Per Refer Master Sample Visual 100% All shifts FOI/ LOI
Drawing
90 Line Inspection Manual 1 Free From As Per Refer Master Visual, Final 5 Nos Once Inprocess
Spatters, Drawing Sample , Welding Acceptance every inspection
Burr, Un thickness Gauge hour record
uniform
Welding,Proj
ections etc
100 Powder Coating Out Sourced 1 Powder As Per Std 788- 0637 Salt Spray 1 No's Once in 6 Inspection Inform supplier thro
Coating Drawing Test(ASTM B months report History purchase
117 )
110 Receiving Visual 1 Paint Peel As per Refer Master Sample Visual Every Lot 25% Of Inspection Inform supplier thro
Inspection Off,Scratche drawing Lot Qty report History purchase
s, Water
Mark, White
Patches etc
120 741_04107 Bush 30 T, Bush 1 Bush Fit As per Matching of Surface Mandrel 5 No's 1 hr FOI/ LOI/ Inform supervisor
Pressing Pressing Tool Customer of Bush & Tube , Inprocess
drawing Coaxiality of Bushes Inspection,
Flush With Pin
2 Position As per 0.032 CMM 5 No's Every lot FOI/ LOI/ Inform supervisor
Customer Inprocess
drawing Inspection
130 Final Inspection Visual, 1 As per Check all Major & Visual , CMM 10 Nos Every lot Final
Dimensions Customer Key Characteristics. Rerports etc Inspection
drawing Report
2 Position As per 0.032 CMM 5 No's Every lot FOI/ LOI/ Inform supervisor
Customer Inprocess
drawing Inspection
3 Profile As per 0.005 CMM 5 No's Every lot FOI/ LOI/ Inform supervisor
Customer Inprocess
drawing Inspection
Not Applicable
If more than three "Dimensional" data sheets are required complete the following instructions before
inserting any dimensional results:
1 Go to any one of the three "Dimesional" worksheets
3 Highlight or select the "OPTIONAL DIMENSIONAL" sheet in the "Before sheet" window
Important Make sure the "Create a copy" box is checked and then select ok.
4 Double click on the new sheet tab and change the sheet name to
correspond to the sample number
5 Repeat this process for each additional report needed, making sure to change the
sample number in the heading of each sheet.
Production Part Approval -
Dimensional Results NOT APPLICABLE (CHECK DESIGN RECORD)
SUPPLIER / NAME OF INSPECTION FACILITY: CAVITY NUMBER SAMPLE NUMBER:
Iris Development Engineering Applications Ltd 1
PART NUMBER: PART NAME:
607_04145A CONT ASM:R/FRT:LWR
NOT
ITEM DEMINSIONAL SPECIFICATION SUPPLIER MEASUREMENT RESULTS OK OK
1 11.82 11.7815 ü
2 10 9.9594 ü
3 0.66 0.7326 ü
4 2 x 1.80 / 1.84 2 x 1.8157 ü
5 0.04 M A B Unable to check ü
6 10.20 / 10.24 10.23 ü
7 2 x Press Bushing Flush after painting OK ü
8 3.12 / 3.16 3.15 ü
9 40 / 42 42 ü
10 3.27 3.3 ü
11 0.1 OK ü
12 0.17 / 0.21 0.2406 ü
13 0.1 0.1 ü
14 0.15 Max 0.15 ü
15 0.1 0.1 ü
16 0.1 0.1 ü
17 0.1 0.1 ü
18 0.1 0.1 ü
19 0.25 0.25 ü
20 0.1 0.1 ü
21 0.032 M C-D A B 0.0495 ü
22 0.5445 / 0.5495 0.5447 ü
23 0.70 / 0.76 0.746 ü
24 0.125 0.135 ü
25 7.1526 7.15 ü
26 0.6282 0.1299 ü
27 0.005 0.001 ü
28 73 70.0672 ü
29 14.825 14.8234 ü
30 0.963 0.9683 ü
31 0.656 0.657 ü
32 0.032 M A B 0.0323 ü
33 2 x 1.0625 / 1.0600 Cannot be measured ü
Report Requested By
MTD
Type of Inspection Type of drawing
Complete Partial Product Drawing
Drawing is being changed by Product Engineering per ECN No.
Dim Drawing Acceptance PARTS / TOOL CAVITIES CHECKED
No. OK Dimension Lower Upper
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Inspected by Title
Approved by Title
CONT ASM:R/FRT:LWR
N/A Lb/Oz
Lb/Oz
Revised Tool Transfer Tool
Cav. #
Date
Date
ENTER VALUES IN THE SHADED AREAS ONLY ENTER VALUES IN THE SHADED AREAS ONLY
ENTER VALUES IN THE SHADED AREAS ONLY ENTER VALUES IN THE SHADED AREAS ONLY
Page 51
Production Part Approval - Material
Test Results NOT APPLICABLE (CHECK DESIGN RECORD)
SUPPLIER PART NUMBER
Iris Development Engineering Applications Ltd 607_04145A
NAME OF LABORATORY PART NAME
CONT ASM:R/FRT:LWR
TYPE OF NOT
TEST MATERIAL SPEC. NO./DATE/SPECIFICATION SUPPLIER TEST RESULTS OK OK
Mechanical Properties
Not Applicable
COMMENTS
APPRAISER A APPRAISER B
PART # TRIAL #1 TRIAL #2 PART # TRIAL #1 TRIAL #2
1 OK OK 1 OK OK
2 OK OK 2 OK OK
3 OK OK 3 OK OK
4 OK OK 4 OK OK
5 OK OK 5 OK OK
6 OK OK 6 OK OK
7 OK OK 7 OK OK
8 OK OK 8 OK OK
9 OK OK 9 OK OK
10 OK OK 10 OK OK
11 OK OK 11 OK OK
12 OK OK 12 OK OK
13 OK OK 13 OK OK
14 OK OK 14 OK OK
15 OK OK 15 OK OK
16 OK OK 16 OK OK
17 OK OK 17 OK OK
18 OK OK 18 OK OK
19 OK OK 19 OK OK
20 OK OK 20 OK OK
No Reject Gage
Remarks:
NOTES:
Shown on Drawing Number 607_04145A Purchase Order No. Po 35589 Weight (lb/oz)
Note: Does this part contain any restricted or reportable substances? Yes No
SUBMISSION RESULTS
The results for ✘ dimensional measurements material and functional tests appearance criteria statistical process package
These results meet all drawing and specification requirements: YES NO (If "NO" - Explanation Required)
Mold / Cavity / Production Process
DECLARATION
I affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable
Production Part Approval Process Manual 3rd Edition Requirements. I further warrant these samples were
produced at the production rate of / 8 hours. I have noted any deviations from this declaration below.
EXPLANATION/COMMENTS:
Print Name Title Phone No. `+91- 44 - 274 6 Fax No. `+91- 44 - 274 6300
Control Number 913539020 PSW The original copy of this document shall remain at the supplier' location Optional: customer tracking
Uncontrolled if Printed while the part is active (see Glossary). number: # ______________
CONSUMER PRODUCTS CENTER
TOOLING PROCESS AND DEVELOPMENT GROUP
ISIR – TOOL APPROVAL WARRANT
Part Name: CONT ASM:R/FRT:LWR Part Number: 607_04145A Project Number: 0
Initial Submission
Engineering Change(s) ECO #:
Tooling, Replacement, or Refurbishment
Correction of Discrepancy
Change in Part Processing
✘ Other – please specify: TOWARDS STAGED SUBMISSION
DECLARATION
I affirm that the samples represented by this warrant are representative of our parts.
I have noted any deviations from this declaration below
EXPLANATION/COMMENTS:
Customer Signature: