To , Date : 14 Dec 2019

The CDO (Chief Development Officer )

Meerut

Subject - Required NOC ( NBC ) Certificate .

Requested Sir,

we required an NBC certificate a NOC for renewal our society certificate for a
legal purpose , The MADARSA BUILDING situated at Nangla Maukhas ,Block Rajpura , Meerut ,is
an educational building for education .

The Building Layout / Drawings were attached with the letter , for inspection and checking
purpose . Layout drafted with actual dimension as per site .

Please do needful as soon as possible .

Regards

with Thanks
DATE : 24 DEC 2019

QUTATION
FOR SUPPLY AND INSTALLING CALCIUM SILICATE FALSE CEILING 600X600

ITEMS UNIT RATES


CALCIUM BOARD 600X600 MM
6-8 MM THK. SQM. 385

CHANNEL SQM. 60
T SQM. 80
CLIT SQM. 15

FASTNER 20
LABOUR 300
MATERIAL WASTAGE 5% 28
TOTAL 888
OVERHEAD & PROFIT 20% (AS per 178
GCC Clause )
TOTAL 1066 +GST18%

PER METER RATE IN WORDS - ONE HUNDRED SIXTY SIX RUPEES ONLY + GST EXTA

* GST REQUIRED EXTRA AS PER GOVERMENT NORMS .

PAYMENT TERMS

* MATERIAL ADVANCE REQUIRED ON SUPPLY AT SITE 65%

* 35 % PAYMENT ON INSTALATION

* LABOUR HUTMENT REQUIRED ONLY CLIENT PAROLE FREE OF COST

* ELECTRICITY + WATER REQUIRED FREE OF COST


ITEMS TO BE EXECUTED AS CONTRACT ARE:
1. STRUCTURE

: R C C STRUCTURE

: 115 MM BRICK WALL

2. FLOORING

: WORKING SPACE NORMAL IPS FLOORING

: STAIRCASE GRANITE FLOORING .

: TOILET IPS FLOORING

3. PLASTERING

: INTERNAL & EXTERNAL BOTH ARE INCLUDE

4. M S / IRON WORK

: STAIRCASE RAILING MS

: GROUND FLOOR HALL GATE MS .

: 1 st FLOOR HALL GATE MS 3'6"- 4'ft .

: 1 st FLOOR OUTSIDE WINDOW M S or WOODEN .

: TERRACE MUMTY DOOR MS 3'ft

5. ELECTRICAL WORK

: 04 nos. FAN BOX ON BOTH FLOOR WITH WIRING ONLY

: 05 nos. CONCILED SWITCH BOX ONLY ON BOTH FLOOR WITH WIRING ONLY

: 06 nos. LIGHT POINTS ON WALLS OF BOTH THE FLOORS WITH WIRING ONLY

: 01 nos. CONSEALED CEILING IN BOTH TOILETS WITH ONE SWITCH BOARD COMPLETE .

: 01 nos. AC BOX POINT WITH WIRING ONLY .

6. PLUMBING

: SUMER SEBIL FITTING WITH PUMP .

: 01 nos. 500 LTR. TANK AT TERRACE MUMTY

: 01 WC IN BOTH TOILETS

: 01 nos. WASHBASIN IN BOTH TOILETS WITH ONE TAPE ONLY.


DATE : 04 JAN 2020

QUTATION
Acoustic Insulation Instalation.

RATE

325 + GST

PER METER RATE IN WORDS - THREE HUNDRED AND TWEENTY FIVE RUPEES ONLY + GST EXTA

* GST REQUIRED EXTRA AS PER GOVERMENT NORMS .

PAYMENT TERMS

* LABOUR PAYMENT REQUIRED EVERY MONTH ( MONTHLY BASIS ) ON APPROVED MEASURMENT.

* LABOUR HUTMENT REQUIRED ONLY CLIENT PAROLE FREE OF COST

* ELECTRICITY + WATER REQUIRED FREE OF COST


Date : 08 Jan 2020
List of Drawings Provided As per Agreement .
1. Detailed Layout of all Rooms , Lobby , Kitchen , Living Area , Toilets , Entrance etc.

2. 3 D views of all Layout .

3. Rooms & Living Area Detailed Furniture Drawing .

4. Kitchen Detailed Furniture Drawing .

5. Wash Room Views .

6. All four Side wall views all Rooms.

7 . False Ceiling Detailed Drawing .

5. Color Contrast Schemes of all Area .

6. Electrical Drawings .

7. Lighting Designs .

8. Entrance Lobby views.

9. Terrace Landscape .

10 . Flooring Drawing .

Payment Terms :
* 5 % Advance When terms condition finalized and Agreement will be singed off .

* 10 % First Floor Room Detail Finalized by client .

* 10 % Second Floor Detail Finalized by client .

* 15 % on Electrical ,False Ceiling and Flooring Drawing

* 25 % First Floor 3D Views of Rooms , Lobby , Kitchen , Toilets , Living , Entrance .

* 15 % Second Floor 3D Views of Rooms , Lobby , Kitchen , Toilets , Living , Entrance .

* 15 % Furniture Details

* 5 % After Completion and Satisfaction .