Bill of Quantities: Air Conditioning & Ventillation
Bill of Quantities: Air Conditioning & Ventillation
Bill of Quantities: Air Conditioning & Ventillation
BILL OF QUANTITIES
UNIT COST
Item Description Unit Qty Amount
Materials Labor
I. PRELIMINARIES
Mobilization / Demobilization lot 1.00 70,000.00
Technical Support lot 1.00 100,000.00
Testing and Commissioning lot 1.00 35,000.00
Hydrotest lot 1.00 10,000.00
Chemical Treatment lot 1.00 15,000.00
Design fee lot 1.00 30,000.00
As Built lot 1.00 20,000.00
Sub-Total 280,000.00
E Hanger , Support, Misc. & Consumables lot 1.00 16,425.83 5,475.28 21,901.11
Sub-Total 90,750.98
Sub-Total 137,348.39
K Air Terminals
Sub-Total 349,703.10
Note:
VAT Inclusive
FCU Chilled water - OSM
Installation of Package FCU Unit by Others (excluded)
Coring Works by Others
Bonds and Insurances - Excluded
Fans and Blower - By Ralgo
Duct and Air Terminals - By Ralgo
Wall Restoration by Civil Contractor
Blower Load side only (3 meters Radius maximum) - unit to MCP
FCU Load side only (3 meters Radius maximum) - unit to MCP
FCU Drain - Tap to the nearest Main Condensate Drain (3 meters Radius maximum)
Terms of Payment - 50% DP and 50% Progress Billing