WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1787 Revise : 0


WR Number : 1272369 O1 04770 000 RWP Number : 613170000000037
Work Title : PRODUCTION FACILITY CTI MINAS WELL 8E-15 (AREA-1)
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : PA-0001-0117 RDP Start Plan : 13-Feb-2017
Location : SLO RDP End Plan : 31-Mar-2017
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
PIPING OFF PLOT Install Steel Pipe Line 6" 0.28 Meter 827.00 91,800.00 0.00 105,060.00 75,918,600.00
Install Valve/Control Valve <= 2"
PIPING OFF PLOT Each 3.00 132,503.00 0.00 152,888.00 397,509.00
All Class
PIPING OFF PLOT Install Nipple <= 2" All Thickness Each 2.00 285,400.00 0.00 328,210.00 570,800.00
Dismantle Steel Pipe Line 4" All
PIPING OFF PLOT Meter 30.00 25,547.00 0.00 27,591.00 766,410.00
Thickness
Dismantle Valve/Control Valve 4"
PIPING OFF PLOT Each 1.00 91,768.00 0.00 101,964.00 91,768.00
Class 300
PIPE SUPPORT &
Install Steel Pipe Pile 6" Meter 12.00 91,800.00 0.00 102,000.00 1,101,600.00
PILLING
PIPE SUPPORT & Fabricate and Install Pipe Support
Meter 2.00 713,448.00 0.00 764,409.00 1,426,896.00
PILLING Type I 6"
ELECTRICAL Dismantle junction box Each 1.00 406,800.00 0.00 437,310.00 406,800.00
INSTRUMENTATION Install Instrument - Pressure Gauge Each 2.00 242,400.00 0.00 252,500.00 484,800.00
Excavation, Back fill and
EARTHWORK &
Compaction for Underground Cu. Meter 34.00 324,766.00 0.00 345,064.00 11,042,044.00
CIVIL
Facility
Supply, Fabricate & Install Fencing -
EARTHWORK & Galvanized Chain Link Standard 2.1
Meter 18.00 750,000.00 0.00 850,000.00 13,500,000.00
CIVIL Meter Fence Height with galvanized
barbed wire
Fabricate & Install Galvanized
EARTHWORK &
Chain Link Single Gate <= 4 Meter Each 1.00 1,290,000.00 0.00 1,444,800.00 1,290,000.00
CIVIL
Width
EARTHWORK & Fabricate and Install Structural
Kilogram 950.00 12,800.00 0.00 13,867.00 12,160,000.00
CIVIL Steel
EARTHWORK & Supply and Apply Painting for Steel
Sq. Meter 1.78 90,880.00 0.00 98,109.00 161,766.40
CIVIL Structure
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 140.00 20,600.00 0.00 23,690.00 2,884,000.00
Painting, without abrasive blasting
Supply and Install Steel
SUPPORT &
Pipe/Tubular Tower Scaffolding <= Cu.Meter.Day 72.00 41,000.00 0.00 46,000.00 2,952,000.00
TESTING
1000 Cu.Meter.Days
Total Amount 125,154,993.40

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)

1 dari 1 20/02/2017 15:16


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1788 Revise : 2


WR Number : 1272371 O1 04770 000 RWP Number : 613170000000039
Work Title : PRODUCTION FACILITY CTI MINAS WELL 7D-95 (AREA-2)
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (ABDEL)
Charge To : PA-0001-0117 RDP Start Plan : 20-Feb-2017
Location : SLO RDP End Plan : 03-Apr-2017
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
Install Steel Pipe Line <= 2" All
PIPING OFF PLOT Meter 2.00 35,700.00 0.00 40,800.00 71,400.00
Thickness
PIPING OFF PLOT Install Steel Pipe Line 6" 0.28 Meter 738.34 91,800.00 0.00 105,060.00 67,779,612.00
Install Steel Elbow <= 2" All
PIPING OFF PLOT Each 1.00 315,968.00 0.00 363,363.00 315,968.00
Thickness
PIPING OFF PLOT Install Steel Elbow 6" 0.28 Each 25.00 754,183.00 0.00 867,311.00 18,854,575.00
PIPING OFF PLOT Install Flange <= 2" All Class Each 2.00 234,436.00 0.00 270,111.00 468,872.00
PIPING OFF PLOT Install Flange 6" Class 600 Each 21.00 530,000.00 0.00 591,154.00 11,130,000.00
Install Threadolet/Sockolet
PIPING OFF PLOT Each 6.00 244,640.00 0.00 281,336.00 1,467,840.00
/Weldolet <= 2" All Thickness
PIPING OFF PLOT Install Weldolet 6" 0.28 Each 1.00 764,288.00 0.00 881,478.00 764,288.00
Install Valve/Control Valve <= 2"
PIPING OFF PLOT Each 7.00 132,503.00 0.00 152,888.00 927,521.00
All Class
Install Valve/Control Valve 6" Class
PIPING OFF PLOT Each 3.00 448,441.00 0.00 515,707.00 1,345,323.00
600
PIPING OFF PLOT Install Nipple <= 2" All Thickness Each 7.00 285,400.00 0.00 328,210.00 1,997,800.00
PIPING OFF PLOT Install Cap/Plug <= 2" All Class Each 5.00 203,880.00 0.00 234,462.00 1,019,400.00
Supply and Apply Painting (without
abrassive blasting) on existing
PIPING OFF PLOT Meter 701.29 32,648.00 0.00 37,545.00 22,895,715.92
installed Pipe Line (on-line/off-line)
6"
Dismantle Steel Pipe Line 3" All
PIPING OFF PLOT Meter 10.00 22,471.00 0.00 24,514.00 224,710.00
Thickness
Dismantle Steel Pipe Line 4" All
PIPING OFF PLOT Meter 38.15 25,547.00 0.00 27,591.00 974,618.05
Thickness
Dismantle Steel Pipe Line 6" All
PIPING OFF PLOT Meter 247.42 37,732.00 0.00 40,792.00 9,335,651.44
Thickness
Dismantle/cutting for fittings,
PIPING OFF PLOT flanges & accessories <= 2" All Meter 4.00 16,320.00 0.00 17,340.00 65,280.00
class/thickness
Dismantle/cutting for fittings,
PIPING OFF PLOT flanges & accessories 3" All Meter 7.00 16,320.00 0.00 17,340.00 114,240.00
class/thickness
Dismantle/cutting for fittings,
PIPING OFF PLOT flanges & accessories 4" All Meter 24.00 16,320.00 0.00 17,340.00 391,680.00
class/thickness
Dismantle/cutting for fittings,
PIPING OFF PLOT flanges & accessories 6" All Meter 17.00 20,433.00 0.00 22,477.00 347,361.00
class/thickness
Dismantle Valve/Control Valve <=
PIPING OFF PLOT Each 4.00 56,100.00 0.00 61,200.00 224,400.00
2" All Class
Dismantle Valve/Control Valve 3"
PIPING OFF PLOT Each 5.00 81,567.00 0.00 91,763.00 407,835.00
Class 300
Dismantle Valve/Control Valve 4"
PIPING OFF PLOT Each 9.00 91,768.00 0.00 101,964.00 825,912.00
Class 150
Dismantle Valve/Control Valve 6"
PIPING OFF PLOT Each 1.00 101,944.00 0.00 117,236.00 101,944.00
Class 300
Install Buried Coated Pipe for Road
PIPING OFF PLOT Meter 36.75 866,193.00 0.00 968,098.00 31,832,592.75
Crossing 6" All Thickness

1 dari 2 06/07/17 09.33


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

PIPE SUPPORT & Fabricate and Install Pipe Support


Meter 3.84 713,448.00 0.00 764,409.00 2,739,640.32
PILLING Type I 6"
PIPE SUPPORT & Fabricate and Install Pipe Guide
Each 4.00 407,640.00 0.00 448,404.00 1,630,560.00
PILLING Type I (PG-1)
PIPE SUPPORT & Fabricate and Install Pipe Anchor
Each 5.00 652,280.00 0.00 703,239.00 3,261,400.00
PILLING Type A-1B 6"
Fabricate and Install member
PIPE SUPPORT &
extension of pipe support, bracing Meter 47.97 754,183.00 0.00 856,100.00 36,178,158.51
PILLING
& stopper plate 6"
ELECTRICAL Dismantle junction box Each 2.00 406,800.00 0.00 437,310.00 813,600.00
INSTRUMENTATION Install Instrument - Pressure Gauge Each 2.00 242,400.00 0.00 252,500.00 484,800.00
Inch
INSTRUMENTATION Install Instrument - Turbine Meter 6.00 242,400.00 0.00 262,600.00 1,454,400.00
Diameter
Manual Excavation, Backfill &
EARTHWORK &
Compaction Using Stamper (no Cu. Meter 5.58 300,000.00 0.00 345,000.00 1,674,000.00
CIVIL
testing required)
EARTHWORK &
Supply and Install Sand Bedding Cu. Meter 31.45 308,850.00 0.00 339,735.00 9,713,332.50
CIVIL
EARTHWORK & Supply and Pouring Concrete -
Cu. Meter 2.72 1,738,868.00 0.00 1,892,298.00 4,729,720.96
CIVIL K175
EARTHWORK &
Concrete Formwork Sq. Meter 9.66 770,438.00 0.00 873,163.00 7,442,431.08
CIVIL
EARTHWORK & Supply, Fabricate and Install
Kilogram 121.38 19,000.00 0.00 21,000.00 2,306,220.00
CIVIL Concrete Reinforcement Steel Bar
EARTHWORK & Fabricate and Install Structural
Kilogram 1,177.99 12,800.00 0.00 13,867.00 15,078,272.00
CIVIL Steel
EARTHWORK & Supply and Apply Painting for Steel
Sq. Meter 59.51 90,880.00 0.00 98,109.00 5,408,268.80
CIVIL Structure
EARTHWORK & Supply and Install Sand Bag (Sand
Each 16.00 33,120.00 0.00 35,190.00 529,920.00
CIVIL mixed with cement)
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 465.86 20,600.00 0.00 23,690.00 9,596,716.00
Painting, without abrasive blasting
Dismantle & Cut Vent Stack Volume
MECHANICAL Bbls 2.54 410,720.00 0.00 441,524.00 1,043,228.80
< 50 bbls
Supply and Install Steel
SUPPORT &
Pipe/Tubular Tower Scaffolding <= Cu.Meter.Day 78.00 41,000.00 0.00 46,000.00 3,198,000.00
TESTING
1000 Cu.Meter.Days
Total Amount 281,167,208.13

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)

2 dari 2 06/07/17 09.33


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1801 Revise : 1


WR Number : 1272789 O1 04770 000 RWP Number : 642170000000065
Work Title : MINAS GS-2 DISCHARGE WATER FLOWMETER INSTALLATION
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (ABDEL)
Charge To : PA-0001-0217 RDP Start Plan : 14-Feb-2017
Location : SLO RDP End Plan : 09-May-2017
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
Install Threadolet/Sockolet/Weldolet
PIPING ON PLOT Each 1.00 269,120.00 0.00 309,488.00 269,120.00
<= 2" All Thickness
Install Valve/Control Valve <= 2" All
PIPING ON PLOT Each 2.00 145,763.00 0.00 168,188.00 291,526.00
Class
PIPE SUPPORT & Fabricate and Install Pipe Support Type
Meter 1.15 1,216,812.00 0.00 1,368,913.00 1,399,333.80
PILLING I 12"
Install Power and Control Cable -
(Above /Under Ground, Single
ELECTRICAL Meter 194.16 33,578.00 0.00 36,630.00 6,519,504.48
Core/Multi Core Cable); Up to 600V,
Overall Diameter up to 5 mm
Install Electrical Panelboard/Load
ELECTRICAL Each 1.00 732,240.00 0.00 793,260.00 732,240.00
Center
ELECTRICAL Install Electrical UPS Each 1.00 813,520.00 0.00 874,534.00 813,520.00
INSTRUMENTATION Install Instrument - Level Switch Each 1.00 404,000.00 0.00 434,300.00 404,000.00
Install Instrument Line -Terminations,
INSTRUMENTATION Each 24.00 100,985.00 0.00 116,133.00 2,423,640.00
PLTC
Manual Excavation, Backfill &
EARTHWORK & Cu.
Compaction Using Stamper (no testing 40.01 300,000.00 0.00 345,000.00 12,003,000.00
CIVIL Meter
required)
EARTHWORK & Cu.
Supply and Install Sand Bedding on plot 13.50 319,145.00 0.00 355,178.00 4,308,457.50
CIVIL Meter
EARTHWORK & Cu.
Supply and Install Lean Concrete on plot 1.54 1,543,678.00 0.00 1,646,590.00 2,377,264.12
CIVIL Meter
EARTHWORK & Supply and Pouring Concrete - K175 on Cu.
10.79 2,058,038.00 0.00 2,263,842.00 22,206,230.02
CIVIL plot Meter
EARTHWORK & Sq.
Concrete Formwork on plot 40.84 616,388.00 0.00 698,573.00 25,173,285.92
CIVIL Meter
EARTHWORK & Supply, Fabricate and Install Concrete
Kilogram 787.77 20,000.00 0.00 22,000.00 15,755,400.00
CIVIL Reinforcement Steel Bar on plot
EARTHWORK &
Fabricate and Install Structural Steel Kilogram 8,734.87 12,800.00 0.00 13,867.00 111,806,336.00
CIVIL
EARTHWORK & Fabricate and Install Hot Dip Galvanized
Kilogram 474.40 27,794.00 0.00 29,853.00 13,185,473.60
CIVIL Steel Grating
EARTHWORK & Cu.
Removal/Demolish Reinforced concrete 3.00 566,029.00 0.00 617,486.00 1,698,087.00
CIVIL Meter
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 20.02 20,600.00 0.00 23,690.00 412,412.00
Painting, without abrasive blasting
Supply and Install Zincalum/Galvalum Sq.
BUILDING 13.80 405,000.00 0.00 465,750.00 5,589,000.00
Roofing Meter
Survey Works - Topographical Survey
SURVEY Point 12.00 206,520.00 0.00 227,172.00 2,478,240.00
and As Built Drawings
Total Amount 229,846,070.44

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)

1 dari 1 06/07/17 09.29


WORK ORDER file:///C:/Users/K46C/AppData/Local/Microsoft/Windows/Temporary In...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1800 Revise : 2


WR Number : 1272791 O1 04770 000 RWP Number : 642170000000063
Work Title : MINAS GS-1 DISCHARGE WATER FLOWMETER INSTALLATION
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (ABDEL)
Charge To : PA-0001-0217 RDP Start Plan : 14-Feb-2017
Location : SLO RDP End Plan : 19-Apr-2017
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
Install Threadolet/Sockolet/Weldolet
PIPING ON PLOT Each 1.00 269,120.00 0.00 309,488.00 269,120.00
<= 2" All Thickness
Install Valve/Control Valve <= 2" All
PIPING ON PLOT Each 3.00 145,763.00 0.00 168,188.00 437,289.00
Class
PIPE SUPPORT & Fabricate and Install Pipe Support Type
Meter 10.90 912,600.00 0.00 963,300.00 9,947,340.00
PILLING I 8"
Install Power and Control Cable -
(Above /Under Ground, Single
ELECTRICAL Meter 175.56 33,578.00 0.00 36,630.00 5,894,953.68
Core/Multi Core Cable); Up to 600V,
Overall Diameter up to 5 mm
Install Electrical Panelboard/Load
ELECTRICAL Each 1.00 732,240.00 0.00 793,260.00 732,240.00
Center
ELECTRICAL Install Electrical UPS Each 1.00 813,520.00 0.00 874,534.00 813,520.00
INSTRUMENTATION Install Instrument - Level Switch Each 1.00 404,000.00 0.00 434,300.00 404,000.00
Install Instrument Line -Terminations,
INSTRUMENTATION Each 24.00 100,985.00 0.00 116,133.00 2,423,640.00
PLTC
Manual Excavation, Backfill &
EARTHWORK &
Compaction Using Stamper (no testing Cu. Meter 64.48 300,000.00 0.00 345,000.00 19,344,000.00
CIVIL
required)
EARTHWORK & Supply and Install Sand Bedding on
Cu. Meter 13.50 319,145.00 0.00 355,178.00 4,308,457.50
CIVIL plot
EARTHWORK & Supply and Install Lean Concrete on
Cu. Meter 3.05 1,543,678.00 0.00 1,646,590.00 4,708,217.90
CIVIL plot
EARTHWORK & Supply and Pouring Concrete - K175 on
Cu. Meter 1.15 2,058,038.00 0.00 2,263,842.00 2,366,743.70
CIVIL plot
EARTHWORK &
Concrete Formwork on plot Sq. Meter 60.05 616,388.00 0.00 698,573.00 37,014,099.40
CIVIL
EARTHWORK & Supply, Fabricate and Install Concrete
Kilogram 247.58 20,000.00 0.00 22,000.00 4,951,600.00
CIVIL Reinforcement Steel Bar on plot
EARTHWORK &
Fabricate and Install Structural Steel Kilogram 13,124.33 12,800.00 0.00 13,867.00 167,991,424.00
CIVIL
EARTHWORK & Fabricate and Install Hot Dip
Kilogram 979.08 27,794.00 0.00 29,853.00 27,212,549.52
CIVIL Galvanized Steel Grating
EARTHWORK & Supply and Apply Painting for Steel
Sq. Meter 114.10 90,880.00 0.00 98,109.00 10,369,408.00
CIVIL Structure
EARTHWORK & Supply and Install Sand Bag (Sand
Each 393.00 33,120.00 0.00 35,190.00 13,016,160.00
CIVIL mixed with cement)
EARTHWORK &
Removal/Demolish Reinforced concrete Cu. Meter 0.10 566,029.00 0.00 617,486.00 56,602.90
CIVIL
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 156.33 20,600.00 0.00 23,690.00 3,220,398.00
Painting, without abrasive blasting
Supply and Install Zincalum/Galvalum
BUILDING Sq. Meter 13.80 405,000.00 0.00 465,750.00 5,589,000.00
Roofing

1 of 2 8/7/2017 1:50 PM
WORK ORDER file:///C:/Users/K46C/AppData/Local/Microsoft/Windows/Temporary In...

Survey Works - Topographical Survey


SURVEY Point 12.00 206,520.00 0.00 227,172.00 2,478,240.00
and As Built Drawings
Supply and Install Steel Pipe/Tubular
SUPPORT &
Tower Scaffolding <= 1000 Cu.Meter.Day 164.74 41,000.00 0.00 46,000.00 6,754,340.00
TESTING
Cu.Meter.Days
Total Amount 330,303,343.60

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Rinsos Marihot Pardosi# 010003 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)

2 of 2 8/7/2017 1:50 PM
WORK ORDER
PT. RIFANSI DWI PUTRA

WO No RDP‐WUR‐SCM‐WO‐1100 Revision 4


Ordered To PT. PROTECH ASIA ENGINEERING PIC Abdel Hanif
Charge To Start Date 04‐Nov‐14
SR No 1256912 O1 04770 000 Finish Date 06‐Mar‐15
WAP No 584140000000865 Location Kotabatak
Title Kotabatak Pipeline Replacement – Fencing and Dismantle existing 12 and 8” pipeline
Quantity Rate
No Description unit Amount (IDR)
Non Remote Remote Non Remote Remote
PIPING OFF PLOT 0
1 Dismantle Steel Pipe Line 12" All Thickness Meter 2.900,00 63.000 68.000 197.200.000
Dismantle/cutting for fittings, flanges & 
2 Meter 25,00 20.000 22.000 550.000
accessories 12" All class/thickness
EARTHWORK & CIVIL 0
1 Earthworks Cut/Excavation Cu. Meter 9.412,63 22.000 24.000 225.903.120
Manual Excavation, Backfill & Compaction Using 
2 Cu. Meter 1.415,91 300.000 350.000 495.568.500
Stamper (no testing required)
3 Supply and Install Sand Bedding Cu. Meter 1,62 300.000 330.000 534.600
4 Supply and Install Lean Concrete Cu. Meter 1,62 1.350.000 1.500.000 2.430.000
5 Supply and Pouring Concrete ‐ K225 Cu. Meter 9,30 2.150.000 2.350.000 21.855.000
6 Concrete Formwork Sq. Meter 2,08 750.000 850.000 1.768.000
Supply, Fabricate and Install Concrete 
7 Kilogram 183,42 19.000 21.000 3.851.820
Reinforcement Steel Bar
Fabricate & Install Galvanized Expanded Metal 
8 Standard 2.1 Meter Fence Height without  Meter 24,67 420.000 480.000 11.841.600
galvanized barbed wire
Fabricate & Install Galvanized Expanded Metal 
9 Each 1,00 1.600.000 1.750.000 1.750.000
Single Gate ¡Ü 4 Meter Width
10 Install Steel Pipe Culvert size ¡Ý 24" diameter Meter 7,00 1.600.000 1.800.000 12.600.000
11 Fabricate and Install Structural Steel  Kilogram 7.306,69 12.000 13.000 94.986.970
12 Supply and Install Steel Guard Rails Meter 10,51 1.450.000 1.600.000 16.816.000
SUPPORT & TESTING 0
Supply and Install Steel Pipe/Tubular Tower 
1 Cu.Meter.Day 435,12 41.000 46.000 20.015.520
Scaffolding ¡Ü 1000 Cu.Meter.Days
Transportation of dismantled material ‐ 
2 Additional Cost per KM/Tonne Above 30 KM  KM/Tonne 2.150,00 16.000 18.000 38.700.000
Hauling Distance

Total Amount (IDR) 1.146.371.130

Ordered By, Approved by, Received by,

Approved Approved Approved

Area Supt. SCM Manager Project Manager PIC

Completed by Reviewed by, Approved by

PIC Area Supt. SCM Manager Project Manager

page 1 of 1
WORK ORDER
PT. RIFANSI DWI PUTRA

WO No RDP‐WUR‐SCM‐WO‐1127 Revision 3


Ordered To PT. PROTECH ASIA ENGINEERING PIC Abdel Hanif
Charge To Start Date 08‐Dec‐14
SR No 1258007 O1 04770 000 Finish Date 06‐Mar‐15
WAP No 584140000001052 Location Kotabatak
Title Kotabatak Pipeline replacement ‐ Install Fencing and Dismantle existing 12" and 8" Pipeline (Segment 1)
Quantity Rate
No Description unit Amount (IDR)
Non Remote Remote Non Remote Remote
PIPING OFF PLOT
1 Dismantle Steel Pipe Line 8" All Thickness Meter 620,60 47.000 52.000 32.271.200
2 Dismantle Steel Pipe Line 12" All Thickness Meter 495,50 63.000 68.000 33.694.000
3 Dismantle Steel Pipe Line 14" All Thickness Meter 187,20 71.000 78.000 14.601.600
4 Dismantle Steel Pipe Line 16" All Thickness Meter 73,60 80.000 86.000 6.329.600
5 Dismantle Steel Pipe Line 18" All Thickness Meter 18,00 110.000 120.000 2.160.000
6 Dismantle Steel Pipe Line 20" All Thickness Meter 9,50 125.000 135.000 1.282.500
Dismantle/cutting for fittings, flanges & 
7 Meter 30,00 20.000 22.000 660.000
accessories 6" All class/thickness
Dismantle Valve/Control Valve 6" Class 300 Each 2,00 120.000 240.000
EARTHWORK & CIVIL
1 Earthworks Cut/Excavation Cu. Meter 2.138,20 22.000 24.000 51.316.800
Manual Excavation, Backfill & Compaction Using 
2 Cu. Meter 213,46 300.000 350.000 74.711.000
Stamper (no testing required)
3 Supply and Install Sand Bedding Cu. Meter 1,51 300.000 330.000 498.300
4 Supply and Install Lean Concrete Cu. Meter 1,51 1.350.000 1.500.000 2.265.000
5 Supply and Pouring Concrete ‐ K225 Cu. Meter 4,00 2.150.000 2.350.000 9.400.000
Supply, Fabricate and Install Concrete 
6 Kilogram 172,33 19.000 21.000 3.618.930
Reinforcement Steel Bar
Fabricate & Install Galvanized Expanded Metal 
7 Standard 2.1 Meter Fence Height with galvanized  Meter 19,48 420.000 480.000 9.350.400
barbed wire
Fabricate & Install Galvanized Expanded Metal 
8 Each 1,00 1.600.000 1.750.000 1.750.000
Single Gate ¡Ü 4 Meter Width
9 Fabricate and Install Structural Steel Kilogram 3.380,40 12.000 13.000 43.945.244
10 Supply and Apply Painting for Steel Structure Sq. Meter 61,12 88.000 95.000 5.806.400
Supply, Fabricate and Install Traffic Sign, Single 
11 Each 14,00 4.000.000 4.500.000 63.000.000
Post Pipe
12 Supply and Install Steel Guard Rails Meter 13,34 1.450.000 1.600.000 21.344.000
SUPPORT & TESTING
Supply and Install Steel Pipe/Tubular Tower 
1 Cu.Meter.Day 495,00 41.000 46.000 22.770.000
Scaffolding ¡Ü 1000 Cu.Meter.Days
Transportation of dismantled material ‐ 
2 Additional Cost per KM/Tonne Above 30 KM  KM/Tonne 2.083,06 16.000 18.000 37.495.080
Hauling Distance

Total Amount (IDR) 438.510.054,20

Ordered By, Approved by, Received by,

Approved Approved Approved

Area Supt. SCM Manager Project Manager PIC

Completed by Reviewed by, Approved by

PIC Area Supt. SCM Manager Project Manager

page 1 of 1
WORK ORDER
PT. RIFANSI DWI PUTRA

WO No RDP‐WUR‐SCM‐WO‐1128 Revision 3


Ordered To PT. PROTECH ASIA ENGINEERING PIC Abdel Hanif
Charge To Start Date 07‐Dec‐14
SR No 1258008 O1 04770 000 Finish Date 27‐Feb‐15
WAP No 584140000001054 Location Kotabatak
Title Repair Culvert, Install Metal Guard and Install Warning sign at Kotabatak 12" shipping line PKM 700‐ 3600
Quantity Rate
No Description unit Amount (IDR)
Non Remote Remote Non Remote Remote
EARTHWORK & CIVIL
1 Supply and Install Sand Bedding Cu. Meter 3,07 300.000 330.000 1.013.100
2 Supply and Install Lean Concrete Cu. Meter 3,15 1.350.000 1.500.000 4.725.000
3 Supply and Pouring Concrete ‐ K225 Cu. Meter 27,45 2.150.000 2.350.000 64.507.500
4 Concrete Formwork Sq. Meter 162,19 750.000 850.000 137.861.500
Supply, Fabricate and Install Concrete 
5 Kilogram 1.597,30 19.000 21.000 33.543.300
Reinforcement Steel Bar
Supply, Fabricate and Install Traffic Sign, Single 
6 Each 63,00 4.000.000 4.500.000 283.500.000
Post Pipe
Supply and Install San Bag ( Sand mixed with 
Each 112,00 34.000 3.808.000
cement)
SUPPORT & TESTING
Supply and Install Steel Pipe/Tubular Tower 
1 Cu.Meter.Day 276,33 41.000 46.000 12.711.105,94
Scaffolding ¡Ü 1000 Cu.Meter.Days

Total Amount (IDR) 541.669.505,94

Ordered By, Approved by, Received by,

Approved Approved Approved

Area Supt. SCM Manager Project Manager PIC

Completed by Reviewed by, Approved by

PIC Area Supt. SCM Manager Project Manager

page 1 of 1
WORK ORDER

WORK ORDER

PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1107 Revise : 0


WR Number : 1258091 O1 04770 000 RWP Number : 623140000001069
Work Title : Hauling mud from Kotabatak CMTF to SMF/SBF supporting Pit CMTF
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0715 RDP Start Plan : 18-Dec-2014
Location : SLO RDP End Plan : 31-Mar-2015
Actual Start :   Actual End :  

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
EARTHWORK
Manual Excavation, Backfill & Compaction Using
Cu.

0.00
300,000.00
12.00
350,000.00
4,200,000.00
& CIVIL Stamper (no testing required) Meter
EARTHWORK
Cu.

Supply and Pouring Concrete - K175
0.00 1,700,000.00
12.00 1,850,000.00
22,200,000.00
& CIVIL Meter

Fabricate & Install Fencing - Galvanized Chain Link
EARTHWORK
Standard 2.1 Meter Fence Height without galvanized Meter
0.00
300,000.00
800.00
340,000.00 272,000,000.00
& CIVIL
barbed wire
EARTHWORK
Fabricate & Install Galvanized Chain Link Double Gate

Each
0.00 2,600,000.00
3.00 3,000,000.00
9,000,000.00
& CIVIL ¡Ü 8 Meter Width

Supply and Apply Painting for Mechanical Equipment,
MECHANICAL
Sq.Ft
0.00
20,000.00 20,629.57
24,000.00 495,109,680.00
External Painting, without abrasive blasting
Total Amount 802,509,680.00

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Harapan Pasaribu#
CG0004 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001 Abdel Hanif#
CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif#
CG1066 Harapan Pasaribu#
CG0004 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001
(PIC) (Area Manager) (SCM Department) (Project Manager)

RDP-WUR-SCM-WO-1107_1258091 O1 04770 000_Rev_0.html[19/08/2015 14:41:02]


WORK ORDER
PT. RIFANSI DWI PUTRA

WO No RDP-WUR-SCM-WO-1157 Revision 3
Ordered To PT. PROTECH ASIA ENGINEERING PIC Abdel Hanif
Charge To Start Date 12-Jan-15
SR No 1258711 O1 04770 000 Finish Date 21-Jun-15
WAP No 584140000001147 Location Intan GS
Title Minas Pipeline Pressure & Temperature Monitoring - Fencing Intan
Quantity Rate
No Description unit Amount (IDR)
Non Remote Remote Non Remote Remote
EARTHWORK & CIVIL
Manual Excavation, Backfill & Compaction Using
1 Cu. Meter 4.25 300,000 350,000 1,487,500
Stamper (no testing required)
2 Supply and Install Sand Bedding Cu. Meter 0.59 300,000 330,000 194,700
3 Supply and Install Lean Concrete Cu. Meter 0.59 1,350,000 1,500,000 885,000
4 Supply and Pouring Concrete - K225 Cu. Meter 3.21 2,150,000 2,350,000 7,543,500
5 Concrete Formwork Sq. Meter 14.08 750,000 850,000 11,968,000
Supply, Fabricate and Install Concrete
6 Kilogram 131.71 19,000 21,000 2,765,910
Reinforcement Steel Bar
Fabricate & Install Fencing - Galvanized Chain Link
7 Standard 2.1 Meter Fence Height with galvanized Meter 6.00 300,000 340,000 2,040,000
barbed wire
Fabricate & Install Galvanized Expanded Metal
8 Standard 2.1 Meter Fence Height with galvanized Meter 20.57 420,000 480,000 9,873,600
barbed wire
Fabricate & Install Galvanized Expanded Metal
9 Each 1.14 800,000 850,000 969,000
Single Man Gate ¡Ü 1.2 Meter Width
10 Fabricate and Install Structural Steel Kilogram 7.07 12,000 13,000 91,910
11 Removal/Demolish Fencing Meter 26.74 60,000 65,000 1,738,100
MECHANICAL
Supply and Apply Painting for Mechanical
1 Equipment, External Painting, without abrasive Sq.Ft 742.33 20,000 24,000 17,815,920
blasting
SUPPORT & TESTING
Supply and Install Steel Pipe/Tubular Tower
1 Cu.Meter.Day 159.01 60,000 70,000 11,130,700
Scaffolding 1.001 - 10.000 Cu.Meter.Days
Transportation of dismantled material - Additional
2 Cost per KM/Tonne Above 30 KM Hauling KM/Tonne 3.53 16,000 18,000 63,540
Distance
Total Amount (IDR) 68,567,380

Ordered By, Approved by, Received by,

Approved Approved Approved

Area Supt. SCM Manager Project Manager PIC

Completed by Reviewed by, Approved by

PIC Area Supt. SCM Manager Project Manager

page 1 of 1
WORK ORDER

WORK ORDER

PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1173 Revise : 2


WR Number : 1258716 O1 04770 000 RWP Number : 584140000001146
Work Title : Minas Pipeline Pressure & Temperature Monitoring - MDP & 5C77
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0815 RDP Start Plan : 12-Jan-2015
Location : HCT RDP End Plan : 10-Jul-2015
Actual Start :   Actual End :  

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE

Fabricate & Install Single Power Pole 8" dia. c/w

ELECTRICAL
Each
1.00 13,000,000.00
0.00 14,000,000.00
13,000,000.00
pole step, round bar

EARTHWORK
Manual Excavation, Backfill & Compaction Using
Cu.

44.38
300,000.00
0.00
350,000.00
13,314,000.00
& CIVIL Stamper (no testing required) Meter

EARTHWORK
Cu.

Supply and Install Sand Bedding
10.69
300,000.00
0.00
330,000.00
3,207,000.00
& CIVIL Meter

EARTHWORK
Cu.

Supply and Install Lean Concrete
10.69
1,350,000.00
0.00
1,500,000.00
14,431,500.00
& CIVIL Meter

EARTHWORK
Cu.

Supply and Pouring Concrete - K225
44.34
2,150,000.00
0.00
2,350,000.00
95,331,000.00
& CIVIL Meter

EARTHWORK
Cu.

Supply and Pouring Concrete - K250
0.52
2,350,000.00
0.00
2,550,000.00
1,222,000.00
& CIVIL Meter

EARTHWORK
Sq.

Concrete Formwork
221.73
750,000.00
0.00
850,000.00 166,297,500.00
& CIVIL Meter

EARTHWORK
Supply, Fabricate and Install Concrete
Kilogram
1,830.36
19,000.00
0.00
21,000.00
34,776,840.00
& CIVIL Reinforcement Steel Bar

EARTHWORK

Supply and Install Anchor Bolt Kilogram
6.68
75,000.00
0.00
81,000.00
501,000.00
& CIVIL

EARTHWORK
Cu.

Supply and Install Grouting Non Shrinkage
0.02 40,000,000.00
0.00 43,000,000.00
800,000.00
& CIVIL Meter

Supply and Apply Painting for Mechanical
MECHANICAL Equipment, External Painting, without abrasive
Sq.Ft
46.82
20,000.00
0.00
24,000.00
936,400.00
blasting
Total Amount 343,817,240.00

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rincos Pardosi#
CG0003 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001 Abdel Hanif#
CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif#
CG1066 Rincos Pardosi#
CG0003 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001
(PIC) (Area Manager) (SCM Department) (Project Manager)

file:///C|/...ft/Windows/Temporary%20Internet%20Files/Content.Outlook/6TYKGVTM/RDP-WUR-SCM-WO-1173_1258716%20O1%2004770%20000_Rev_2.html[31/08/2015 9:33:42]
WORK ORDER

WORK ORDER

PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1183 Revise : 2


WR Number : 1258771 O1 04770 000 RWP Number : 584140000001149
Work Title : Minas Pipeline Pressure & Temperature Monitoring - Power Pole
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0815 RDP Start Plan : 06-Apr-2015
Location : HCT RDP End Plan : 10-Jul-2015
Actual Start :   Actual End :  

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE

EARTHWORK

Supply and Install Grouting Non Shrinkage
0.01 40,000,000.00
0.00 43,000,000.00
400,000.00
& CIVIL

Supply and Apply Painting for Mechanical
MECHANICAL Equipment, External Painting, without abrasive
178.38
20,000.00
0.00
24,000.00
3,567,600.00
blasting

Fabricate & Install Single Power Pole 8" dia. c/w

ELECTRICAL
Each
4.00 13,000,000.00
0.00 14,000,000.00 52,000,000.00
pole step, round bar

EARTHWORK
Manual Excavation, Backfill & Compaction Using
Cu.

5.83
300,000.00
0.00
350,000.00
1,749,000.00
& CIVIL Stamper (no testing required) Meter

EARTHWORK
Cu.

Supply and Install Sand Bedding
0.25
300,000.00
0.00
330,000.00
75,000.00
& CIVIL Meter

EARTHWORK
Cu.

Supply and Install Lean Concrete
0.25
1,350,000.00
0.00
1,500,000.00
337,500.00
& CIVIL Meter

EARTHWORK
Cu.

Supply and Pouring Concrete - K250
1.57
2,350,000.00
0.00
2,550,000.00
3,689,500.00
& CIVIL Meter

EARTHWORK
Sq.

Concrete Formwork
10.83
750,000.00
0.00
850,000.00
8,122,500.00
& CIVIL Meter

EARTHWORK
Supply, Fabricate and Install Concrete
Kilogram
324.99
19,000.00
0.00
21,000.00
6,174,810.00
& CIVIL Reinforcement Steel Bar

EARTHWORK

Supply and Install Anchor Bolt Kilogram
20.04
75,000.00
0.00
81,000.00
1,503,000.00
& CIVIL
Total Amount 77,618,910.00

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rincos Pardosi#
CG0003 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001 Abdel Hanif#
CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif#
CG1066 Rincos Pardosi#
CG0003 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001
(PIC) (Area Manager) (SCM Department) (Project Manager)

RDP-WUR-SCM-WO-1183_1258771 O1 04770 000_Rev_2.html[16/10/2015 10:47:51]


WORK ORDER

WORK ORDER

PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1184 Revise : 1


WR Number : 1258772 O1 04770 000 RWP Number : 584140000001148
Work Title : Minas Pipeline Pressure & Temperature Monitoring - Fencing Minas
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0815 RDP Start Plan : 13-Feb-2015
Location : HCT RDP End Plan : 12-Jun-2015
Actual Start :   Actual End :  

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE

PIPE
SUPPORT &
Dismantle Pipe Support Type I 4"
Each
1.00
560,000.00
0.00
600,000.00
560,000.00
PILLING

PIPE
SUPPORT &
Dismantle Pipe Support Type I 12"
Each
1.00 2,400,000.00
0.00 2,600,000.00
2,400,000.00
PILLING

EARTHWORK
Manual Excavation, Backfill & Compaction

Cu. Meter
56.58
300,000.00
0.00
350,000.00
16,974,000.00
& CIVIL Using Stamper (no testing required)

EARTHWORK

Supply and Install Sand Bedding
Cu. Meter
6.16
300,000.00
0.00
330,000.00
1,848,000.00
& CIVIL

EARTHWORK

Supply and Install Lean Concrete
Cu. Meter
6.16 1,350,000.00
0.00 1,500,000.00
8,316,000.00
& CIVIL

EARTHWORK

Supply and Pouring Concrete - K225
Cu. Meter
38.70 2,150,000.00
0.00 2,350,000.00
83,205,000.00
& CIVIL

EARTHWORK

Concrete Formwork
Sq. Meter
190.35
750,000.00 0.00
850,000.00 142,762,500.00
& CIVIL

EARTHWORK
Supply, Fabricate and Install Concrete

Kilogram
1,295.04
19,000.00
0.00
21,000.00
24,605,760.00
& CIVIL Reinforcement Steel Bar

Fabricate & Install Galvanized Expanded Metal

EARTHWORK
Standard 2.1 Meter Fence Height with
Meter
221.29
420,000.00
0.00
480,000.00
92,941,800.00
& CIVIL
galvanized barbed wire

EARTHWORK
Fabricate & Install Galvanized Expanded Metal

Each
4.57
800,000.00
0.00
850,000.00
3,656,000.00
& CIVIL Single Man Gate ¡Ü 1.2 Meter Width

EARTHWORK

Fabricate and Install Structural Steel
Kilogram
374.31
12,000.00
0.00
13,000.00
4,491,720.00
& CIVIL

EARTHWORK

Removal/Demolish Fencing
Meter
102.88
60,000.00
0.00
65,000.00
6,172,800.00
& CIVIL

Supply and Apply Painting for Mechanical

MECHANICAL Equipment, External Painting, without abrasive
Sq.Ft
3,381.15
20,000.00
0.00
24,000.00
67,623,000.00
blasting

SUPPORT &
Supply and Install Steel Pipe/Tubular Tower
Cu.Meter.Day
1,432.98
60,000.00
0.00
70,000.00
85,978,800.00
TESTING Scaffolding 1.001 - 10.000 Cu.Meter.Days
Total Amount 541,535,380.00

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rincos Pardosi#
CG0003 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001 Abdel Hanif#
CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

RDP-WUR-SCM-WO-1184_1258772 O1 04770 000_Rev_1.html[22/10/2015 14:08:00]


WORK ORDER

Abdel Hanif#
CG1066 Rincos Pardosi#
CG0003 Lintong Mangihut Manullang#
1007 Bonar P. Situmorang#
CG0001
(PIC) (Area Manager) (SCM Department) (Project Manager)

RDP-WUR-SCM-WO-1184_1258772 O1 04770 000_Rev_1.html[22/10/2015 14:08:00]


WORK ORDER

WORK ORDER

PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1174 Revise : 2


WR Number : 1260257 O1 04770 000 RWP Number : 661150000000173
Work Title : SID Improvement Kotabatak GS
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0815 RDP Start Plan : 06-May-2015
Location : SLO RDP End Plan : 24-Aug-2015
Actual Start :   Actual End :  

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
EARTHWORK
Manual Excavation, Backfill & Compaction

Cu. Meter
0.00
300,000.00
9.84
350,000.00
3,444,000.00
& CIVIL Using Stamper (no testing required)
EARTHWORK

Supply and Install Anchor Bolt
Kilogram
0.00
75,000.00
40.31
81,000.00
3,265,110.00
& CIVIL
EARTHWORK

Supply and Install Sand Bedding on plot
Cu. Meter
0.00
310,000.00
1.76
345,000.00
607,200.00
& CIVIL
EARTHWORK

Supply and Install Lean Concrete on plot
Cu. Meter
0.00 1,500,000.00
1.76 1,600,000.00
2,816,000.00
& CIVIL
EARTHWORK

Supply and Pouring Concrete - K225 on plot
Cu. Meter
0.00 2,350,000.00
7.06 2,550,000.00
18,003,000.00
& CIVIL
EARTHWORK

Concrete Formwork on plot
Sq. Meter
0.00
600,000.00
53.98
680,000.00
36,706,400.00
& CIVIL
EARTHWORK
Supply, Fabricate and Install Concrete

Kilogram
0.00
20,000.00 1,000.17
22,000.00
22,003,740.00
& CIVIL Reinforcement Steel Bar on plot
EARTHWORK

Fabricate and Install Structural Steel
Kilogram
0.00
12,000.00
6,368.90
13,000.00
82,795,700.00
& CIVIL

Supply and Apply Painting for Mechanical
MECHANICAL Equipment, External Painting, without abrasive
Sq.Ft
0.00
20,000.00
1,577.58
24,000.00
37,861,920.00
blasting

SUPPORT &
Supply and Install Steel Pipe/Tubular Tower
Cu.Meter.Day
0.00
41,000.00
62.86
46,000.00
2,891,560.00
TESTING Scaffolding ¡Ü 1000 Cu.Meter.Days
Total Amount 210,394,630.00

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Harapan Pasaribu#
CG0004 Lintong Mangihut Manullang#
C0007 Bonar P. Situmorang#
CG0001 Abdel Hanif#
CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif#
CG1066 Harapan Pasaribu#
CG0004 Lintong Mangihut Manullang#
C0007 Bonar P. Situmorang#
CG0001
(PIC) (Area Manager) (SCM Department) (Project Manager)

file:///C|/.../Windows/Temporary%20Internet%20Files/Content.Outlook/6TYKGVTM/RDP-WUR-SCM-WO-1174_1260257%20O1%2004770%20000_Rev_2.html[18/12/2015 12:00:37]
WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1185 Revise : 4


WR Number : 1262772 O1 04770 000 RWP Number : 705150000000556
Work Title : Kotabatak CMTF Improvement
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0815 RDP Start Plan : 03-Aug-2015
Location : SLO RDP End Plan : 01-Oct-2015
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
PIPING OFF
Install Steel Pipe Line 6" ¡à 0.432 Meter 0.00 115,000.00 6.05 135,000.00 816,750.00
PLOT
PIPING OFF
Install Steel Pipe Line 12" ¡à 0.688 Meter 0.00 400,000.00 18.60 460,000.00 8,556,000.00
PLOT
ELECTRICAL Install Guy Line Meter 0.00 61,826.00 22.00 72,130.00 1,586,860.00
Install Power Cable - (Above /Under
Ground, Single Core/Multi Core
ELECTRICAL Meter 0.00 145,000.00 214.00 155,000.00 33,170,000.00
Cable); above 600V - 5kV, Overall
Diameter Above 75 mm
Install Electrical Panelboard/Load
ELECTRICAL Each 0.00 720,000.00 1.00 780,000.00 780,000.00
Center
ELECTRICAL Install Switchrack Section 0.00 760,000.00 1.00 820,000.00 820,000.00
ELECTRICAL Install Grounding Rod Meter 0.00 40,000.00 48.00 44,000.00 2,112,000.00
ELECTRICAL Install Grounding Bare Copper Meter 0.00 43,000.00 150.00 50,000.00 7,500,000.00
Install Myer Hub or equivalent; Any
ELECTRICAL Each 0.00 70,000.00 1.00 75,000.00 75,000.00
size
ELECTRICAL Install Coupling Rigid; Any size Each 0.00 38,000.00 8.00 40,000.00 320,000.00
Install Rigid Conduit: Any size & type
ELECTRICAL (include connector reducer, clamp, Meter 0.00 70,000.00 1.20 75,000.00 90,000.00
etc)
Install Connector, Ground, Transf.
ELECTRICAL Each 0.00 38,000.00 8.00 40,000.00 320,000.00
Servit Post; Any size
Manual Excavation, Backfill &
EARTHWORK
Compaction Using Stamper (no Cu. Meter 0.00 300,000.00 17.99 350,000.00 6,296,500.00
& CIVIL
testing required)
EARTHWORK Excavation, Back fill and Compaction
Cu. Meter 0.00 320,000.00 389.54 340,000.00 132,443,600.00
& CIVIL for Underground Facility
EARTHWORK
Supply and Install Sand Bedding Cu. Meter 0.00 300,000.00 106.92 330,000.00 35,283,600.00
& CIVIL
EARTHWORK
Supply and Install Lean Concrete Cu. Meter 0.00 1,350,000.00 0.24 1,500,000.00 360,000.00
& CIVIL
EARTHWORK
Supply and Pouring Concrete - K175 Cu. Meter 0.00 1,700,000.00 11.06 1,850,000.00 20,461,000.00
& CIVIL
EARTHWORK
Supply and Pouring Concrete - K225 Cu. Meter 0.00 2,150,000.00 119.59 2,350,000.00 281,036,500.00
& CIVIL
EARTHWORK
Concrete Formwork Sq. Meter 0.00 750,000.00 6.15 850,000.00 5,227,500.00
& CIVIL
EARTHWORK
Concrete Formwork Sq. Meter 0.00 750,000.00 544.84 850,000.00 463,114,000.00
& CIVIL
EARTHWORK Supply, Fabricate and Install
Kilogram 0.00 19,000.00 3,442.97 21,000.00 72,302,370.00
& CIVIL Concrete Reinforcement Steel Bar
EARTHWORK Supply and Install Grouting Non
Cu. Meter 0.00 40,000,000.00 0.38 43,000,000.00 16,340,000.00
& CIVIL Shrinkage
Fabricate & Install Fencing -
EARTHWORK Galvanized Chain Link Standard 2.1
Meter 0.00 300,000.00 571.31 340,000.00 194,245,400.00
& CIVIL Meter Fence Height without
galvanized barbed wire
EARTHWORK Fabricate & Install Galvanized Chain
Each 0.00 1,250,000.00 1.00 1,400,000.00 1,400,000.00
& CIVIL Link Single Gate ¡Ü 4 Meter Width

1 dari 2 02/02/2016 16:39


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

Fabricate & Install Galvanized Chain


EARTHWORK
Link Double Gate ¡Ü 8 Meter Each 0.00 2,600,000.00 3.00 3,000,000.00 9,000,000.00
& CIVIL
Width
EARTHWORK
Fabricate and Install Structural Steel Kilogram 0.00 12,000.00 14,765.66 13,000.00 191,953,580.00
& CIVIL
EARTHWORK Supply, Fabricate & Install Structural
Kilogram 0.00 24,964.00 837.70 26,961.00 22,585,229.70
& CIVIL Steel
EARTHWORK Supply, Fabricate & Install Structural
Kilogram 0.00 25,000.00 300.47 27,000.00 8,112,690.00
& CIVIL Steel
EARTHWORK Supply and Apply Painting for Steel
Sq. Meter 0.00 88,000.00 285.36 95,000.00 27,109,200.00
& CIVIL Structure
EARTHWORK
Removal/Demolish Fencing Meter 0.00 60,000.00 116.35 65,000.00 7,562,750.00
& CIVIL
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 0.00 20,000.00 23,697.84 24,000.00 568,748,160.00
Painting, without abrasive blasting
Supply and Install Corrugated
BUILDING Sq. Meter 0.00 160,000.00 325.50 180,000.00 58,590,000.00
Galvanized Steel Roofing BJLS
Supply and Install Corrugated
BUILDING Sq. Meter 0.00 162,588.00 138.60 182,912.00 25,351,603.20
Galvanized Steel Roofing BJLS
Supply and Install PVC Pipe outside
BUILDING or inside wall or floor, including Meter 0.00 240,000.00 197.30 270,000.00 53,271,000.00
elbow, nipple, tee AW 4" S16
Supply and Install Steel Pipe/Tubular
SUPPORT &
Tower Scaffolding 1.001 - 10.000 Cu.Meter.Day 0.00 60,000.00 5,166.06 70,000.00 361,624,200.00
TESTING
Cu.Meter.Days
Total Amount 2,618,565,492.90

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)

2 dari 2 02/02/2016 16:39


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1184 Revise : 1


WR Number : 1258772 O1 04770 000 RWP Number : 584140000001148
Work Title : Minas Pipeline Pressure & Temperature Monitoring - Fencing Minas
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0815 RDP Start Plan : 13-Feb-2015
Location : HCT RDP End Plan : 12-Jun-2015
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
PIPE SUPPORT
Dismantle Pipe Support Type I 4" Each 1.00 560,000.00 0.00 600,000.00 560,000.00
& PILLING
PIPE SUPPORT
Dismantle Pipe Support Type I 12" Each 1.00 2,400,000.00 0.00 2,600,000.00 2,400,000.00
& PILLING
Manual Excavation, Backfill &
EARTHWORK &
Compaction Using Stamper (no testing Cu. Meter 56.58 300,000.00 0.00 350,000.00 16,974,000.00
CIVIL
required)
EARTHWORK &
Supply and Install Sand Bedding Cu. Meter 6.16 300,000.00 0.00 330,000.00 1,848,000.00
CIVIL
EARTHWORK &
Supply and Install Lean Concrete Cu. Meter 6.16 1,350,000.00 0.00 1,500,000.00 8,316,000.00
CIVIL
EARTHWORK &
Supply and Pouring Concrete - K225 Cu. Meter 38.70 2,150,000.00 0.00 2,350,000.00 83,205,000.00
CIVIL
EARTHWORK &
Concrete Formwork Sq. Meter 190.35 750,000.00 0.00 850,000.00 142,762,500.00
CIVIL
EARTHWORK & Supply, Fabricate and Install Concrete
Kilogram 1,295.04 19,000.00 0.00 21,000.00 24,605,760.00
CIVIL Reinforcement Steel Bar
Fabricate & Install Galvanized
EARTHWORK & Expanded Metal Standard 2.1 Meter
Meter 221.29 420,000.00 0.00 480,000.00 92,941,800.00
CIVIL Fence Height with galvanized barbed
wire
Fabricate & Install Galvanized
EARTHWORK &
Expanded Metal Single Man Gate ¡Ü Each 4.57 800,000.00 0.00 850,000.00 3,656,000.00
CIVIL
1.2 Meter Width
EARTHWORK &
Fabricate and Install Structural Steel Kilogram 374.31 12,000.00 0.00 13,000.00 4,491,720.00
CIVIL
EARTHWORK &
Removal/Demolish Fencing Meter 102.88 60,000.00 0.00 65,000.00 6,172,800.00
CIVIL
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 3,381.15 20,000.00 0.00 24,000.00 67,623,000.00
Painting, without abrasive blasting
Supply and Install Steel Pipe/Tubular
SUPPORT &
Tower Scaffolding 1.001 - 10.000 Cu.Meter.Day 1,432.98 60,000.00 0.00 70,000.00 85,978,800.00
TESTING
Cu.Meter.Days
Total Amount 541,535,380.00

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Rincos Pardosi# CG0003 Lintong Mangihut Manullang# 1007 Bonar P. Situmorang# CG0001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Rincos Pardosi# CG0003 Lintong Mangihut Manullang# 1007 Bonar P. Situmorang# CG0001
(PIC) (Area Manager) (SCM Department) (Project Manager)

1 dari 1 14/03/2017 15:46


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1637 Revise : 2


WR Number : 1266605 O1 04770 000 RWP Number : 661160000000080
Work Title : Gas Compressor ex. Pinang GP Installation at Petani GP
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (PAE)
Charge To : D-0001-0316 RDP Start Plan : 02-Mar-2016
Location : SLO RDP End Plan : 05-Mar-2016
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
PIPING ON Install Steel Pipe Line <= 2" All
Meter 0.00 38,500.00 93.30 44,000.00 4,105,200.00
PLOT Thickness
PIPING ON
Install Steel Pipe Line 3" 0.216 Meter 0.00 53,900.00 15.00 59,400.00 891,000.00
PLOT
PIPING ON
Install Steel Pipe Line 4" 0.25 Meter 0.00 77,000.00 18.35 88,000.00 1,614,800.00
PLOT
PIPING ON
Install Steel Pipe Line 6" 0.375 Meter 0.00 110,000.00 24.70 126,500.00 3,124,550.00
PLOT
PIPING ON
Install Steel Pipe Line 8" 0.322 Meter 0.00 125,400.00 4.10 143,000.00 586,300.00
PLOT
PIPING ON
Install Steel Pipe Line 10" 0.365 Meter 0.00 159,500.00 1.70 181,500.00 308,550.00
PLOT
PIPING ON
Install Blind Flange <= 2" All Class Each 0.00 181,500.00 1.00 209,000.00 209,000.00
PLOT
PIPING ON Install Valve/Control Valve <= 2"
Each 0.00 143,000.00 14.00 165,000.00 2,310,000.00
PLOT All Class
PIPING ON Install Valve/Control Valve 3"
Each 0.00 220,000.00 5.00 297,000.00 1,485,000.00
PLOT Class 150
PIPING ON Install Valve/Control Valve 3"
Each 0.00 253,000.00 1.00 363,000.00 363,000.00
PLOT Class 300
PIPING ON Install Valve/Control Valve 4"
Each 0.00 308,000.00 1.00 396,000.00 396,000.00
PLOT Class 150
PIPING ON Gasket Replacement <= 2" All
Each 0.00 440,000.00 46.00 594,000.00 27,324,000.00
PLOT Class
PIPING ON
Gasket Replacement 3" Class 150 Each 0.00 605,000.00 5.00 715,000.00 3,575,000.00
PLOT
PIPING ON
Gasket Replacement 3" Class 300 Each 0.00 605,000.00 1.00 770,000.00 770,000.00
PLOT
PIPING ON
Gasket Replacement 4" Class 150 Each 0.00 770,000.00 7.00 935,000.00 6,545,000.00
PLOT
PIPING ON
Gasket Replacement 4" Class 300 Each 0.00 770,000.00 10.00 935,000.00 9,350,000.00
PLOT
PIPING ON
Gasket Replacement 6" Class 150 Each 0.00 1,155,000.00 6.00 1,320,000.00 7,920,000.00
PLOT
PIPING ON
Gasket Replacement 6" Class 300 Each 0.00 1,210,000.00 9.00 1,375,000.00 12,375,000.00
PLOT
PIPING ON
Gasket Replacement 10" Class 150 Each 0.00 1,870,000.00 1.00 2,200,000.00 2,200,000.00
PLOT
PIPING ON
Gasket Replacement 10" Class 300 Each 0.00 1,870,000.00 1.00 2,200,000.00 2,200,000.00
PLOT
PIPING ON Dismantle Steel Pipe Line 4" All
Meter 0.00 28,600.00 1.00 30,800.00 30,800.00
PLOT Thickness
PIPING ON Dismantle Steel Pipe Line 8" All
Meter 0.00 55,000.00 2.00 60,500.00 121,000.00
PLOT Thickness
Fabricate and Install member
PIPE SUPPORT
extension of pipe support, bracing Meter 0.00 490,000.00 1.50 560,000.00 840,000.00
& PILLING
& stopper plate 4"
Manual Excavation, Backfill &
EARTHWORK &
Compaction Using Stamper (no Cu. Meter 0.00 300,000.00 35.98 350,000.00 12,593,000.00
CIVIL
testing required)
EARTHWORK & Supply and Install Grouting Non
Cu. Meter 0.00 40,000,000.00 4.42 43,000,000.00 190,060,000.00
CIVIL Shrinkage
EARTHWORK & Supply and Install Sand Bedding
Cu. Meter 0.00 310,000.00 3.07 345,000.00 1,059,150.00
CIVIL on plot
EARTHWORK & Supply and Install Lean Concrete
Cu. Meter 0.00 1,500,000.00 4.92 1,600,000.00 7,872,000.00
CIVIL on plot

1 dari 2 15/09/2016 10:06


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

EARTHWORK & Supply and Pouring Concrete -


Cu. Meter 0.00 2,350,000.00 4.51 2,550,000.00 11,500,500.00
CIVIL K225 on plot
EARTHWORK & Supply and Pouring Concrete -
Cu. Meter 0.00 3,000,000.00 32.00 3,300,000.00 105,600,000.00
CIVIL K300 on plot
EARTHWORK &
Concrete Formwork on plot Sq. Meter 0.00 600,000.00 45.06 680,000.00 30,640,800.00
CIVIL
Supply, Fabricate and Install
EARTHWORK &
Concrete Reinforcement Steel Bar Kilogram 0.00 20,000.00 1,384.33 22,000.00 30,455,260.00
CIVIL
on plot
EARTHWORK & Fabricate and Install Structural
Kilogram 0.00 12,000.00 5,910.18 13,000.00 76,832,340.00
CIVIL Steel
EARTHWORK & Fabricate and Install Structural
Kilogram 0.00 12,365.00 2,128.37 13,396.00 28,511,644.52
CIVIL Steel
Install and Dismantle Crane Mats
EARTHWORK &
(Wooden or Concrete or Steel or Sq. Meter 0.00 420,286.00 32.01 472,822.00 15,135,032.22
CIVIL
Other) Foundation
EARTHWORK & Removal/Demolish Reinforced
Cu. Meter 0.00 550,000.00 4.67 600,000.00 2,802,000.00
CIVIL concrete
Install Vessel (Separator,
Softener, Scrubber, Pig Facility,
MECHANICAL Bbls 0.00 160,000.00 2.77 180,000.00 498,600.00
Waterseal Drum, Cooling Drum,
etc) Volume 101-250 bbls
Install Gas Compressor <= 10000
MECHANICAL Unit 0.00 30,000,000.00 1.00 32,000,000.00 32,000,000.00
HP
Install Air Cooled Heat
MECHANICAL Unit 0.00 48,000,000.00 1.00 50,000,000.00 50,000,000.00
Exchanger/Fin Fan Cooler
MECHANICAL Install Steam Generator Unit Unit 0.00 150,000,000.00 1.00 160,000,000.00 160,000,000.00
Install Skidded Compacted
MECHANICAL Sq. Meter 0.00 8,000,000.00 32.13 8,500,000.00 273,105,000.00
Equipment
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 0.00 20,000.00 1,124.97 24,000.00 26,999,280.00
Painting, without abrasive blasting
Dismantle Vessel (Separator,
Softener, Scrubber, Pig Facility,
MECHANICAL Bbls 0.00 240,000.00 58.18 250,000.00 14,545,000.00
Waterseal Drum, Cooling Drum,
etc) Volume 101-250 bbls
Dismantle Gas Compressor <=
MECHANICAL Unit 0.00 16,486,857.00 2.00 18,547,715.00 37,095,430.00
10000 HP
Dismantle Air Cooled Heat
MECHANICAL Unit 0.00 39,156,286.00 2.00 41,217,143.00 82,434,286.00
Exchanger/Fin Fan Cooler
Dismantle Electric Generator 10 -
MECHANICAL Each 0.00 309,128,572.00 2.00 360,650,000.00 721,300,000.00
20 MW
SOIL & CIVIL Field Insitu Sand Cone Test, ASTM
Test 0.00 240,000.00 3.00 260,000.00 780,000.00
TESTING D1556
SOIL & CIVIL Moisture-Density Relations
Test 0.00 240,000.00 3.00 260,000.00 780,000.00
TESTING (Compaction) Test, ASTM D1557
SOIL & CIVIL Liquid Limit, Plastic Limit, and
Test 0.00 800,000.00 3.00 850,000.00 2,550,000.00
TESTING Plasticity Index Test, ASTM D4318
SOIL & CIVIL
Specific Gravity, ASTM D854 Test 0.00 800,000.00 3.00 850,000.00 2,550,000.00
TESTING
SOIL & CIVIL Sieve Analysis of Fine and Coarse
Test 0.00 800,000.00 3.00 850,000.00 2,550,000.00
TESTING Aggregates, ASTM C136
Supply and Install Steel
SUPPORT &
Pipe/Tubular Tower Scaffolding Cu.Meter.Day 0.00 60,000.00 3,709.20 70,000.00 259,644,000.00
TESTING
1.001 - 10.000 Cu.Meter.Days
Total Amount 2,268,537,522.74

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)

2 dari 2 15/09/2016 10:06


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1724 Revise : 6


WR Number : 1269816 O1 04770 000 RWP Number : 639160000000306
Work Title : Reactivation Gas Line Project
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (ABDEL)
Charge To : D-0001-0916 RDP Start Plan : 01-Sep-2016
Location : SLO RDP End Plan : 05-Sep-2016
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
Install Steel Pipe Line <= 2" All
PIPING ON PLOT Meter 0.00 39,672.00 210.00 45,339.00 9,521,190.00
Thickness
PIPING ON PLOT Install Steel Pipe Line 3" 0.216 Meter 0.00 55,540.00 57.00 61,208.00 3,488,856.00
PIPING ON PLOT Install Steel Pipe Line 4" 0.237 Meter 0.00 66,875.00 35.30 77,076.00 2,720,782.80
PIPING ON PLOT Install Steel Pipe Line 6" 0.28 Meter 0.00 102,013.00 61.95 116,748.00 7,232,538.60
PIPING ON PLOT Install Steel Pipe Line 8" 0.25 Meter 0.00 120,148.00 82.33 137,150.00 11,291,559.50
Install Steel Elbow <= 2" All
PIPING ON PLOT Each 0.00 351,376.00 86.00 419,385.00 36,067,110.00
Thickness
PIPING ON PLOT Install Steel Elbow 3" 0.216 Each 0.00 470,391.00 13.00 538,399.00 6,999,187.00
PIPING ON PLOT Install Steel Elbow 4" 0.237 Each 0.00 657,413.00 7.00 748,091.00 5,236,637.00
PIPING ON PLOT Install Steel Elbow 6" 0.28 Each 0.00 838,769.00 10.00 986,121.00 9,861,210.00
PIPING ON PLOT Install Steel Elbow 8" 0.25 Each 0.00 1,190,145.00 23.00 1,360,166.00 31,283,818.00
PIPING ON PLOT Install Flange <= 2" All Class Each 0.00 253,898.00 32.00 291,982.00 9,343,424.00
PIPING ON PLOT Install Flange 3" Class 150 Each 0.00 283,368.00 8.00 323,040.00 2,584,320.00
PIPING ON PLOT Install Flange 3" Class 300 Each 0.00 283,368.00 6.00 323,040.00 1,938,240.00
PIPING ON PLOT Install Flange 4" Class 150 Each 0.00 308,304.00 1.00 354,550.00 354,550.00
PIPING ON PLOT Install Flange 4" Class 300 Each 0.00 326,440.00 3.00 375,406.00 1,126,218.00
PIPING ON PLOT Install Flange 6" Class 150 Each 0.00 464,724.00 11.00 510,062.00 5,610,682.00
PIPING ON PLOT Install Flange 6" Class 300 Each 0.00 498,728.00 1.00 566,736.00 566,736.00
PIPING ON PLOT Install Flange 8" Class 300 Each 0.00 736,757.00 14.00 816,100.00 11,425,400.00
Install Blind Flange <= 2" All
PIPING ON PLOT Each 0.00 187,023.00 2.00 215,360.00 430,720.00
Class
PIPING ON PLOT Install Blind Flange 3" Class 300 Each 0.00 374,046.00 1.00 430,720.00 430,720.00
PIPING ON PLOT Install Blind Flange 4" Class 150 Each 0.00 453,389.00 6.00 521,397.00 3,128,382.00
PIPING ON PLOT Install Blind Flange 4" Class 300 Each 0.00 544,066.00 1.00 625,676.00 625,676.00
PIPING ON PLOT Install Blind Flange 6" Class 150 Each 0.00 725,422.00 2.00 834,236.00 1,668,472.00
PIPING ON PLOT Install Blind Flange 6" Class 300 Each 0.00 906,777.00 2.00 1,042,794.00 2,085,588.00
PIPING ON PLOT Install Blind Flange 8" Class 300 Each 0.00 1,269,488.00 1.00 1,459,911.00 1,459,911.00
Install Reducer <= 2" All
PIPING ON PLOT Each 0.00 340,042.00 8.00 408,050.00 3,264,400.00
Thickness
PIPING ON PLOT Install Reducer 3" >= 0.300 Each 0.00 489,660.00 1.00 563,109.00 563,109.00
PIPING ON PLOT Install Reducer 4" 0.237 Each 0.00 634,744.00 3.00 729,956.00 2,189,868.00
PIPING ON PLOT Install Reducer 8" 0.322 Each 0.00 1,360,166.00 1.00 1,564,191.00 1,564,191.00
PIPING ON PLOT Install Reducer 10" 0.25 Each 0.00 1,586,860.00 1.00 1,813,555.00 1,813,555.00
Install Threadolet/Sockolet
PIPING ON PLOT Each 0.00 272,033.00 26.00 312,838.00 8,133,788.00
/Weldolet <= 2" All Thickness
PIPING ON PLOT Install Weldolet 3" 0.216 Each 0.00 362,711.00 3.00 417,118.00 1,251,354.00
PIPING ON PLOT Install Weldolet 4" 0.237 Each 0.00 544,066.00 1.00 625,676.00 625,676.00
PIPING ON PLOT Install Weldolet 6" 0.28 Each 0.00 850,104.00 4.00 980,453.00 3,921,812.00
PIPING ON PLOT Install Weldolet 8" 0.25 Each 0.00 1,076,798.00 2.00 1,246,819.00 2,493,638.00

1 dari 4 19/05/17 12.27


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

Install Tee/Tee Reducer <=2" All


PIPING ON PLOT Each 0.00 623,409.00 32.00 714,087.00 22,850,784.00
Thickness
PIPING ON PLOT Install Tee/Tee Reducer 6" 0.28 Each 0.00 1,473,513.00 2.00 1,700,208.00 3,400,416.00
PIPING ON PLOT Install Tee/Tee Reducer 8" 0.322 Each 0.00 2,096,922.00 9.00 2,323,617.00 20,912,553.00
Install Valve/Control Valve <= 2"
PIPING ON PLOT Each 0.00 147,351.00 29.00 170,021.00 4,930,609.00
All Class
Install Valve/Control Valve 3"
PIPING ON PLOT Each 0.00 226,694.00 3.00 306,038.00 918,114.00
Class 150
Install Valve/Control Valve 3"
PIPING ON PLOT Each 0.00 260,699.00 5.00 374,046.00 1,870,230.00
Class 300
Install Valve/Control Valve 4"
PIPING ON PLOT Each 0.00 317,372.00 1.00 408,050.00 408,050.00
Class 150
Install Valve/Control Valve 6"
PIPING ON PLOT Each 0.00 430,719.00 5.00 612,075.00 3,060,375.00
Class 150
Install Valve/Control Valve 8"
PIPING ON PLOT Each 0.00 736,757.00 7.00 906,778.00 6,347,446.00
Class 300
Install Nipple <= 2" All
PIPING ON PLOT Each 0.00 317,372.00 80.00 364,978.00 29,198,240.00
Thickness
Install Coupling/Union <= 2" All
PIPING ON PLOT Each 0.00 119,015.00 30.00 136,017.00 4,080,510.00
Class
PIPING ON PLOT Install Cap/Plug <= 2" All Class Each 0.00 226,694.00 29.00 260,699.00 7,560,271.00
Dismantle Steel Pipe Line <= 2"
PIPING ON PLOT Meter 0.00 18,136.00 50.00 20,403.00 1,020,150.00
All Thickness
Dismantle Steel Pipe Line 3" All
PIPING ON PLOT Meter 0.00 24,937.00 10.00 27,204.00 272,040.00
Thickness
Dismantle Steel Pipe Line 4" All
PIPING ON PLOT Meter 0.00 29,471.00 11.30 31,738.00 358,639.40
Thickness
Dismantle Steel Pipe Line 6" All
PIPING ON PLOT Meter 0.00 45,339.00 20.00 47,606.00 952,120.00
Thickness
Dismantle Steel Pipe Line 8" All
PIPING ON PLOT Meter 0.00 56,674.00 10.00 62,341.00 623,410.00
Thickness
Dismantle/cutting for fittings,
PIPING ON PLOT flanges & accessories <= 2" All Meter 0.00 18,136.00 88.00 19,269.00 1,695,672.00
class/thickness
Dismantle/cutting for fittings,
PIPING ON PLOT flanges & accessories 3" All Meter 0.00 18,136.00 26.00 19,269.00 500,994.00
class/thickness
Dismantle/cutting for fittings,
PIPING ON PLOT flanges & accessories 4" All Meter 0.00 18,136.00 31.00 19,269.00 597,339.00
class/thickness
Dismantle/cutting for fittings,
PIPING ON PLOT flanges & accessories 6" All Meter 0.00 22,670.00 27.00 24,937.00 673,299.00
class/thickness
Dismantle/cutting for fittings,
PIPING ON PLOT flanges & accessories 8" All Meter 0.00 22,670.00 13.00 24,937.00 324,181.00
class/thickness
Dismantle Valve/Control Valve
PIPING ON PLOT Each 0.00 62,341.00 1.00 68,009.00 68,009.00
<= 2" All Class
Dismantle Valve/Control Valve 3"
PIPING ON PLOT Each 0.00 90,678.00 1.00 102,013.00 102,013.00
Class 300
Dismantle Valve/Control Valve 4"
PIPING ON PLOT Each 0.00 102,012.00 2.00 113,347.00 226,694.00
Class 300
Dismantle Valve/Control Valve 6"
PIPING ON PLOT Each 0.00 113,347.00 2.00 136,017.00 272,034.00
Class 300
Dismantle Valve/Control Valve 8"
PIPING ON PLOT Each 0.00 136,017.00 2.00 170,021.00 340,042.00
Class 300
PIPE SUPPORT & Fabricate and Install Pipe
Meter 0.00 41,217.00 9.96 484,302.00 4,823,647.92
PILLING Support Type I 4"
Install Instrument - Pressure
INSTRUMENTATION Each 0.00 240,000.00 6.00 250,000.00 1,500,000.00
Gauge
Install Instrument - Temperature
INSTRUMENTATION Each 0.00 240,000.00 1.00 260,000.00 260,000.00
Gauge

2 dari 4 19/05/17 12.27


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

Dismantle Instrument - Pressure


INSTRUMENTATION Each 0.00 64,000.00 2.00 70,000.00 140,000.00
Gauge
Dismantle Instrument -
INSTRUMENTATION Each 0.00 64,000.00 8.00 70,000.00 560,000.00
Temperature Gauge
Manual Excavation, Backfill &
EARTHWORK &
Compaction Using Stamper (no Cu. Meter 0.00 312,172.00 39.86 364,200.00 14,517,012.00
CIVIL
testing required)
EARTHWORK & Supply and Install Grouting Non
Cu. Meter 0.00 40,000,000.00 2.40 43,000,000.00 103,200,000.00
CIVIL Shrinkage
EARTHWORK & Supply and Install Sand Bedding
Cu. Meter 0.00 319,433.00 8.29 355,498.00 2,947,078.42
CIVIL on plot
EARTHWORK & Supply and Install Lean Concrete
Cu. Meter 0.00 1,545,643.00 8.29 1,648,686.00 13,667,606.94
CIVIL on plot
EARTHWORK & Supply and Pouring Concrete -
Cu. Meter 0.00 3,091,286.00 32.96 3,400,415.00 112,077,678.40
CIVIL K300 on plot
EARTHWORK & Supply and Pouring Concrete -
Cu. Meter 0.00 3,348,893.00 41.55 3,606,500.00 149,850,075.00
CIVIL K400 on plot
EARTHWORK &
Concrete Formwork on plot Sq. Meter 0.00 600,000.00 100.00 680,000.00 68,000,000.00
CIVIL
Supply, Fabricate and Install
EARTHWORK &
Concrete Reinforcement Steel Kilogram 0.00 20,086.00 3,000.00 22,095.00 66,285,000.00
CIVIL
Bar on plot
EARTHWORK & Fabricate and Install Structural
Kilogram 0.00 12,365.00 13,764.79 13,396.00 184,393,126.84
CIVIL Steel
Install and Dismantle Crane Mats
EARTHWORK &
(Wooden or Concrete or Steel or Sq. Meter 0.00 420,286.00 72.00 472,822.00 34,043,184.00
CIVIL
Other) Foundation
EARTHWORK & Removal/Demolish Steel
Kilogram 0.00 7,934.00 2,000.00 9,068.00 18,136,000.00
CIVIL Structure
Install Vessel (Separator,
Softener, Scrubber, Pig Facility,
MECHANICAL Bbls 0.00 154,565.00 98.00 175,173.00 17,166,954.00
Waterseal Drum, Cooling Drum,
etc) Volume < 100 bbls
Install Gas Compressor <=
MECHANICAL Unit 0.00 30,912,857.00 1.00 32,973,714.00 32,973,714.00
10000 HP
Install Air Cooled Heat
MECHANICAL Unit 0.00 49,460,572.00 1.00 51,521,429.00 51,521,429.00
Exchanger/Fin Fan Cooler
Install Skidded Compacted
MECHANICAL Sq. Meter 0.00 8,243,429.00 45.49 8,758,643.00 398,430,670.07
Equipment
Install Tube Bundle of Air Cooled
MECHANICAL Unit 0.00 6,182,572.00 3.00 7,213,000.00 21,639,000.00
Heat Exchanger/Fin Fan Cooler
Supply and Apply Painting for
Mechanical Equipment, External
MECHANICAL Sq.Ft 0.00 20,609.00 5,576.22 24,730.00 137,899,920.60
Painting, without abrasive
blasting
Dismantle and Cut Vessel
(Separator, Softener, Scrubber,
MECHANICAL Pig Facility, Waterseal Drum, Bbls 0.00 247,303.00 98.00 257,608.00 25,245,584.00
Cooling Drum, etc) Volume <
100 bbls
Dismantle Gas Compressor <=
MECHANICAL Unit 0.00 16,486,857.00 1.00 18,547,715.00 18,547,715.00
10000 HP
Dismantle Air Cooled Heat
MECHANICAL Unit 0.00 39,156,286.00 1.00 41,217,143.00 41,217,143.00
Exchanger/Fin Fan Cooler
Dismantle Skidded Compacted
MECHANICAL Sq. Meter 0.00 2,060,857.00 45.49 2,473,029.00 112,498,089.21
Equipment
Dismantle Tube Bundle of Air
MECHANICAL Cooled Heat Exchanger/Fin Fan Unit 0.00 7,213,000.00 3.00 7,728,215.00 23,184,645.00
Cooler
Survey Works - Topographical
SURVEY Point 0.00 200,000.00 40.00 220,000.00 8,800,000.00
Survey and As Built Drawings
Supply and Install Steel
SUPPORT &
Pipe/Tubular Tower Scaffolding Cu.Meter.Day 0.00 59,288.00 5,000.00 69,169.00 345,845,000.00
TESTING
1.001 - 10.000 Cu.Meter.Days

3 dari 4 19/05/17 12.27


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

Conduct Additional NDE (Non


SUPPORT & Destructive
Joint 0.00 1,600,000.00 35.00 1,700,000.00 59,500,000.00
TESTING Examination/Radiographic Test)
Diameter 8"
Bundling of insulation/packaging
SUPPORT &
material and Filling to Wooden Cu.Meter 0.00 1,236,514.00 2.00 1,339,557.00 2,679,114.00
TESTING
Box
Transportation of dismantled
SUPPORT & material - Additional Cost per
KM/Tonne 0.00 16,487.00 4,012.19 18,548.00 74,418,100.12
TESTING KM/Tonne Above 30 KM Hauling
Distance
Total Amount 2,451,835,040.82

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)

4 dari 4 19/05/17 12.27


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

WORK ORDER
PT. RIFANSI DWI PUTRA

Work Order Number : RDP-WUR-SCM-WO-1782 Revise : 2


WR Number : 1271627 O1 04770 000 RWP Number : 639160000000453
Work Title : REACTIVATION GAS LINE PROJECT (CONTINUE)
Work Order To : Abdel Hanif Company Name : PT. Protech Asia Engineering (ABDEL)
Charge To : PA-0001-0117 RDP Start Plan : 13-Dec-2016
Location : SLO RDP End Plan : 16-Dec-2016
Actual Start : Actual End :

QTY NON QTY


DISCIPLINE WORK DESCRIPTION UNIT RATE RATE AMOUNT
REMOTE REMOTE
Install Steel Pipe Line <= 2" All
PIPING ON PLOT Meter 0.00 39,305.00 27.28 44,920.00 1,225,417.60
Thickness
PIPING ON PLOT Install Steel Pipe Line 3" 0.216 Meter 0.00 55,003.00 0.82 60,615.00 49,704.30
PIPING ON PLOT Install Steel Pipe Line 4" 0.237 Meter 0.00 62,880.00 15.55 72,312.00 1,124,451.60
PIPING ON PLOT Install Steel Pipe Line 6" 0.28 Meter 0.00 98,760.00 15.90 104,078.00 1,654,840.20
Install Steel Elbow <= 2" All
PIPING ON PLOT Each 0.00 347,588.00 5.00 399,726.00 1,998,630.00
Thickness
PIPING ON PLOT Install Steel Elbow 3" 0.216 Each 0.00 448,440.00 1.00 515,706.00 515,706.00
PIPING ON PLOT Install Steel Elbow 8" 0.25 Each 0.00 1,162,920.00 4.00 1,337,358.00 5,349,432.00
PIPING ON PLOT Install Flange <= 2" All Class Each 0.00 251,200.00 6.00 288,880.00 1,733,280.00
PIPING ON PLOT Install Flange 3" Class 150 Each 0.00 257,907.00 3.00 297,153.00 891,459.00
PIPING ON PLOT Install Flange 3" Class 300 Each 0.00 280,313.00 1.00 319,556.00 319,556.00
PIPING ON PLOT Install Flange 6" Class 150 Each 0.00 448,440.00 3.00 504,495.00 1,513,485.00
PIPING ON PLOT Install Flange 6" Class 600 Each 0.00 572,000.00 2.00 638,000.00 1,276,000.00
PIPING ON PLOT Install Flange 8" Class 150 Each 0.00 670,960.00 2.00 738,056.00 1,476,112.00
PIPING ON PLOT Install Flange 8" Class 300 Each 0.00 715,640.00 2.00 805,095.00 1,610,190.00
PIPING ON PLOT Install Reducer <= 2" All Thickness Each 0.00 336,375.00 5.00 386,831.00 1,934,155.00
PIPING ON PLOT Install Reducer 3" >= 0.300 Each 0.00 484,320.00 1.00 556,968.00 556,968.00
Install Threadolet/Sockolet
PIPING ON PLOT Each 0.00 269,120.00 8.00 309,488.00 2,475,904.00
/Weldolet <= 2" All Thickness
Install Tee/Tee Reducer <=2" All
PIPING ON PLOT Each 0.00 616,629.00 8.00 706,320.00 5,650,560.00
Thickness
PIPING ON PLOT Install Tee/Tee Reducer 3" 0.216 Each 0.00 650,263.00 3.00 739,954.00 2,219,862.00
PIPING ON PLOT Install Tee/Tee Reducer 6" 0.28 Each 0.00 1,434,880.00 1.00 1,650,112.00 1,650,112.00
Install Valve/Control Valve <= 2"
PIPING ON PLOT Each 0.00 145,763.00 21.00 168,188.00 3,531,948.00
All Class
Install Valve/Control Valve 3" Class
PIPING ON PLOT Each 0.00 224,267.00 1.00 257,907.00 257,907.00
150
Install Valve/Control Valve 3" Class
PIPING ON PLOT Each 0.00 257,888.00 1.00 296,571.00 296,571.00
300
PIPING ON PLOT Install Nipple <= 2" All Thickness Each 0.00 314,000.00 57.00 361,100.00 20,582,700.00
Install Coupling/Union <= 2" All
PIPING ON PLOT Each 0.00 117,731.00 12.00 134,550.00 1,614,600.00
Class
PIPING ON PLOT Install Cap/Plug <= 2" All Class Each 0.00 224,320.00 11.00 257,968.00 2,837,648.00
Supply and Apply External Coating
PIPING ON PLOT on existing installed pipe line Meter 0.00 67,320.00 272.35 77,418.00 21,084,792.30
(off-line) <= 2"
Supply and Apply External Coating
PIPING ON PLOT on existing installed pipe line Meter 0.00 89,760.00 57.82 103,224.00 5,968,411.68
(off-line) 3"
Supply and Apply External Coating
PIPING ON PLOT on existing installed pipe line Meter 0.00 123,338.00 50.85 141,838.00 7,212,462.30
(off-line) 4"
Supply and Apply External Coating
PIPING ON PLOT on existing installed pipe line Meter 0.00 179,456.00 77.85 206,374.00 16,066,215.90
(off-line) 6"

1 dari 3 30/03/2017 10:17


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

Supply and Apply External Coating


PIPING ON PLOT on existing installed pipe line Meter 0.00 246,015.00 82.33 282,917.00 23,292,556.61
(off-line) 8"
Dismantle Steel Pipe Line <= 2"
PIPING ON PLOT Meter 0.00 18,033.00 88.35 20,288.00 1,792,444.80
All Thickness
Dismantle Steel Pipe Line 3" All
PIPING ON PLOT Meter 0.00 24,750.00 10.25 27,000.00 276,750.00
Thickness
Dismantle Steel Pipe Line 6" All
PIPING ON PLOT Meter 0.00 44,958.00 17.05 47,206.00 804,862.30
Thickness
Dismantle Valve/Control Valve <=
PIPING ON PLOT Each 0.00 61,703.00 16.00 67,313.00 1,077,008.00
2" All Class
Dismantle Valve/Control Valve 3"
PIPING ON PLOT Each 0.00 89,767.00 4.00 100,988.00 403,952.00
Class 300
Hydrostatic Test for holding time
<= 12 hours Hydrostatic Test for
PIPING ON PLOT Package 0.00 7,249,531.00 1.00 8,253,313.00 8,253,313.00
cummulative length up to 100
Meter > 16"
Hydrostatic Test for holding time
<= 12 hours Hydrostatic Test for
PIPING ON PLOT Package 0.00 5,201,120.00 1.00 5,981,288.00 5,981,288.00
cummulative length 100-1000
Meter < 8"
PIPE SUPPORT & Fabricate and Install Pipe Support
Meter 0.00 713,448.00 6.55 764,409.00 5,006,878.95
PILLING Type I 6"
PIPE SUPPORT & Fabricate and Install Pipe Support
Meter 0.00 754,183.00 21.28 835,717.00 17,784,057.76
PILLING Type II 6"
PIPE SUPPORT & Fabricate and Install Pipe Support
Meter 0.00 1,834,320.00 41.81 2,038,133.00 85,214,340.73
PILLING Type IV 6"
PIPE SUPPORT &
Dismantle Steel Pipe Pile 8" Each 0.00 116,660.00 22.00 126,805.00 2,789,710.00
PILLING
PIPE SUPPORT &
Dismantle Steel Pipe Pile 12" Each 0.00 192,761.00 4.00 221,675.00 886,700.00
PILLING
Install Junction Box (all size &
ELECTRICAL Each 0.00 1,627,000.00 4.00 1,728,688.00 6,914,752.00
type)
ELECTRICAL Dismantle junction box Each 0.00 406,800.00 4.00 437,310.00 1,749,240.00
Install Instrument - Temperature
INSTRUMENTATION Each 0.00 242,400.00 7.00 262,600.00 1,838,200.00
Gauge
EARTHWORK &
Earthworks Clearing & Grubbing Sq. Meter 0.00 5,979.00 1,741.50 6,875.00 11,972,812.50
CIVIL
Manual Excavation, Backfill &
EARTHWORK &
Compaction Using Stamper (no Cu. Meter 0.00 300,000.00 103.87 345,000.00 35,835,150.00
CIVIL
testing required)
EARTHWORK & Supply and Install Sand Bedding on
Cu. Meter 0.00 319,145.00 8.88 355,178.00 3,153,980.64
CIVIL plot
EARTHWORK & Supply and Install Lean Concrete
Cu. Meter 0.00 1,543,678.00 8.42 1,646,590.00 13,864,287.80
CIVIL on plot
EARTHWORK & Supply and Pouring Concrete -
Cu. Meter 0.00 2,418,179.00 5.97 2,623,981.00 15,665,166.57
CIVIL K225 on plot
EARTHWORK & Supply and Pouring Concrete -
Cu. Meter 0.00 3,086,848.00 18.02 3,395,533.00 61,187,504.66
CIVIL K300 on plot
EARTHWORK &
Concrete Formwork on plot Sq. Meter 0.00 616,388.00 149.23 698,573.00 104,248,048.79
CIVIL
Supply, Fabricate and Install
EARTHWORK &
Concrete Reinforcement Steel Bar Kilogram 0.00 20,000.00 914.36 22,000.00 20,115,920.00
CIVIL
on plot
EARTHWORK & Fabricate and Install Structural
Kilogram 0.00 12,800.00 5,248.43 13,867.00 72,779,978.81
CIVIL Steel
EARTHWORK & Supply and Apply Painting for Steel
Sq. Meter 0.00 90,880.00 10.61 98,109.00 1,040,936.49
CIVIL Structure
Install and Dismantle Crane Mats
EARTHWORK &
(Wooden or Concrete or Steel or Sq. Meter 0.00 412,240.00 506.80 463,770.00 235,038,636.00
CIVIL
Other) Foundation
EARTHWORK &
Removal/Demolish Steel Structure Kilogram 0.00 8,124.00 12,648.08 9,284.00 117,424,774.72
CIVIL
EARTHWORK & Removal/Demolish Unreinforced
Cu. Meter 0.00 514,885.00 0.98 566,373.00 555,045.54
CIVIL concrete

2 dari 3 30/03/2017 10:17


WORK ORDER file:///C:/Users/Fanny/AppData/Local/Microsoft/Windows/Temporary I...

EARTHWORK &
Removal/Demolish Fencing Meter 0.00 62,063.00 49.00 67,234.00 3,294,466.00
CIVIL
Install Vessel (Separator, Softener,
Scrubber, Pig Facility, Waterseal
MECHANICAL Bbls 0.00 154,013.00 84.02 174,548.00 14,665,522.96
Drum, Cooling Drum, etc) Volume
< 100 bbls
Supply and Apply Painting for
MECHANICAL Mechanical Equipment, External Sq.Ft 0.00 20,600.00 426.37 23,690.00 10,100,705.30
Painting, without abrasive blasting
Dismantle Vessel (Separator,
Softener, Scrubber, Pig Facility,
MECHANICAL Bbls 0.00 246,480.00 68.36 256,750.00 17,551,430.00
Waterseal Drum, Cooling Drum,
etc) Volume < 100 bbls
Supply and Install
BUILDING Sq. Meter 0.00 405,000.00 364.07 465,750.00 169,565,602.50
Zincalum/Galvalum Roofing
Survey Works - Topographical
SURVEY Point 0.00 206,520.00 58.00 227,172.00 13,175,976.00
Survey and As Built Drawings
Supply and Install Steel
SUPPORT &
Pipe/Tubular Tower Scaffolding Cu.Meter.Day 0.00 60,000.00 4,947.95 69,000.00 341,408,550.00
TESTING
1.001 - 10.000 Cu.Meter.Days
Conduct Additional NDE (Non
SUPPORT & Destructive
Joint 0.00 1,600,000.00 32.00 1,700,000.00 54,400,000.00
TESTING Examination/Radiographic Test)
Diameter 8"
Total Amount 1,595,789,630.31

Ordered By, Approved By, Received By,

APPROVED APPROVED APPROVED


Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001 Abdel Hanif# CG1066
(Area Manager) (SCM Department) (Project Manager) (PIC)

Completed By, Reviewed By, Approved By,

Abdel Hanif# CG1066 Harapan Pasaribu# 010004 Lintong Mangihut Manullang# C0007 Bonar P. Situmorang# 010001
(PIC) (Area Manager) (SCM Department) (Project Manager)