GTG
GTG
GTG
All sub support utilities are online and ready (Compressed Air, Water for
Cooling or NOx Reduction, Power Supplies).
Power from the DG/GRID allows starting Motor to bring Gas Turbine up to
certain speed. After 66% Engine Speed the Turbine Bleed Valve closes equalizing
all Stages of the Compressor and Exhaust Stages and the Turbine can sustain
itself...if not it will go into Stall and Fail start-up.
Before reaching 100% Turbine Engine Speed the Generator Field is Flashed to
energize the Electrical Field.
The SS clutch is over ridden and the Turbine reaches 100% Engine Speed.
Once the Turbine reaches 100% the Heat Recovery diverters slowly adjust open
to direct Heat to the Boiler Section. Once the Boiler Pressure increases past 25%
Load the Main Generator Breaker can be Closed and provide Power to the LOAD.
It is now safe to establish Water Injection to the Gas Turbine for NOx Reduction
because it will not Flameout as long as the Turbine is running at 100% Engine
Speed.
The Steam Pressure should now be reaching maximum Steam Pressure Setpoint
and the Diverters will noticeably back off to maintain setpoint.
Once we have a good Steam Supply you can now bring online the Steam
Turbine.
Reset all Safety Trips. Open the Steam Turbine Chest valves to remove all built
up Condensate. As the draining become full steam and no water -we can close
the Turbine Chest Valves and the Turbine should begin to build momentum and
increase in RPM.
Once at 50% speed the Governor can be reset and Turbine will reach 100%.
We should now be burning Fuel to sustain the Gas Turbine which is providing
Electrical Power. And building Steam Pressure to sustain the process operations
further.
SIPROTEC FEATURES & FUNCTIONS-
2 INCOMERS 350A
ATTEMPTERATOR 0.37KW