SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
24/01/19 @ 10:00 AM 24/01/19 @ 10:00 AM SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-P-121-02 4.4
SAUDI ARAMCO INSPECTION LEVEL
W
CONTRACTOR INSPECTION LEVEL
H
YES
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Check and review the test equipment documents for calibration validity. Schedule Q
A2
NETA, ATS- 2009, Sec.5 Att. IV, Sec. 7.2
All test equipment shall meet the requirements in Section 5.3 and be in
SAES-P-121
A3 good mechanical and electrical condition.
Sec. 3.2
NETA, ATS- Sec.5.2.1
Record wet-and dry-bulb temperatures or relative humidity and
SAES-P-121
A4 temperature.
Sec. 3.2
NETA, ATS- Sec 5.4.2
Testing is to be carried out ONLY on de-energized circuit breakers.
SAES-P-121
A5 Breakers shall be tested for their de-energized state before starting test
Sec. 3.2
on them.
When transformers operated in parallel, the total circulating current shall SAES-P-121
B1
not exceed 10% of the rated current of the lowest kVA rated transformer. Sec. 6.1.8
Page 1 of 8
The values from transformer turns ratio (TTR) tests shall not deviate
more than 1/2 percent from either the adjacent coils or the calculated SAES-P-121
B4
ratio. Sec. 3.2
NETA, ATS- Sec.7.2.2.3.2.3
Page 2 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Check for proper oil level in tank, bushing and conservator. SAES-P-121
B8
NETA, ATS- Sec.7.2.2.1.13 Sec. 3.2
Check the bleed trapped air at the bushing turrets and tank top (Where
SAES-P-121
B9 applicable).
Sec. 3.2
NETA, ATS- 2009
Check that Valves between the tank and radiators are open. SAES-P-121
B10
NETA, ATS- 2009 Sec. 3.2
Check that the distances between the phases and phase to earth are
SAES-P-121
B16 sufficient.
Sec. 3.2
NETA, ATS- 2009
Measure and record the turns ratio on each tap. Turns-ratio test results
shall maintain a normal deviation between each voltage step and shall SAES-P-121
B18
not deviate more than one-half percent from the calculated voltage ratio. Sec. 3.2
NETA, ATS- Sec. 7.12.3.2.6
Page 3 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
The Transformer Turns Ratio test (TTR) measures the ratio of the
voltage between transformer windings to insure that it conforms to its
nameplate. SAES-P-121
B19
Measure and record the turns ratio on each tap. Deviation of not more Sec. 3.2
than +/- 0.5% are allowed.
NETA, ATS- 2009
The ratio of winding voltages of any two windings installed on the same
segment of magnetic core is nearly identical to the ratio of the number of
turns of the windings. This relationship is expressed mathematically as:
V1/V2=N1/N2 SAES-P-121
B20
V1 = open-circuit voltage of the high voltage winding Sec. 3.2
V2 = open circuit voltage of the low voltage winding
N1 = number of turns in the high-voltage winding
N2 = number of turns in the low-voltage winding
Power Rating
a) Transformer data appears on an identification nameplate fastened
SAES-P-121
B21 directly onto the transformer.
Sec. 3.2
b) Transformers are primarily rated in kilovolt amperes (kVA).
NETA, ATS- Sec.7.2.2.1.1
The standardized rules of the industry state that the high-voltage leads
brought outside the case are to be marked H1, H2, etc. and the low-
SAES-P-121
B24 voltage leads X1, X2, etc.
Sec. 3.2
NETA, ATS- 2009
Page 4 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Dielectric test levels shall be in accordance with the distribution levels. SAES-P-121
B37
NETA, ATS- Sec.7.2.2.2.10.1 Sec. 3.2
The test is made by first disconnecting the core ground strap, which is
normally connected to a pad on the underside of the cover near the
SAES-P-121
B39 manhole or handhole. The megohmmeter is then connected between
Sec. 3.2
the core ground strap and the tank ground.
NETA, ATS- Sec.7.2.2.2.8
Page 5 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Megger the core to ground with a 250 volt megger by removing the
intentional core ground and meggering between the ground shunt and SAES-P-121
B41
the transformer case. Sec. 3.2
NETA, ATS- Sec.7.2.2.1.12
The oil in all oil-filled equipment rated 69 kV and below shall be tested
SAES-P-121
B42 and shall meet the values shown as below:
Sec. 3.2
NETA, ATS- Sec.7.2.2.2.10
Oil samples from the transformer shall be obtained and tested for the
following:
a) Dielectric breakdown voltage
b) Neutralization number SAES-P-121
B43
c) Specific gravity Sec. 3.2
d) Color
e) Water content
NETA, ATS- Sec.7.2.2.2.10
C. TEST RESULTS
MEGGER TEST
EQUIPMENT
IDENTIFICATION
Temperature (deg. C)
EQUIPMENT
DELTA CONNECTION WYE CONNECTION
IDENTIFICATION
H1 to H2 H1 to H0
Megger Tester H2 to H3 H2 to H0
Brand: ______________
H3 to H1 H3 to H0
S/N: ______________
X1 to X2 X1 to X0
Calib. Date:___________ X2 to X3 X2 to X0
X3 to X1 X3 to X0
Page 6 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
3
S/N: ______________
4
Calib. Date:___________
5
D. CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Pro Forma Contract), February 2008
2. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract)
3. NETA Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems, 2009
4. SAES-P-121 Transformers and Reactors 30 October 2012
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose
listing states that the equipment, material, or services either meets appropriate designated standards or has been tested and found
suitable for a specified purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified
organization concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by
manufacturer
whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner.
Page 7 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Name, Initials and Date: Name, Initials and Date:
MR. AJMAL ALI MR N HATTAN
QC Supervisor Proponent and Others
Quality Record Approved: MR. HAROLD CEINCIA T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED