Type of Transformer Testing: Tests Done at Factory
Type of Transformer Testing: Tests Done at Factory
Type of Transformer Testing: Tests Done at Factory
1.
2.
3.
Central phase
AN
BN
CN
230 V
180 V
50 V
115 V
230 V
115 V
50 V
180 V
230 V
11.
12.
First disconnect all the line and neutral terminals of the transformer.
Megger leads to be connected to LV and HV bushing studs to measure
insulation resistance IR value in between the LV and HV windings.
13.
Megger leads to be connected to HV bushing studs and transformer tank
earth point to measure insulation resistance IR value in between the HV
windings and earth.
14.
Megger leads to be connected to LV bushing studs and transformer tank
earth point to measure insulation resistance IR value in between the LV
windings and earth.
NB : It is unnecessary to perform insulation resistance test of transformer per
phase wise in three phase transformer. IR values are taken between the windings
collectively as because all the windings on HV side are internally connected
together to form either star or delta and also all the windings on LV side are
internally connected together to form either star or delta.
Measurements are to be taken as follows:
For auto transformer: HV-IV to LV, HV-IV to E, LV to E. For two winding
transformer: HV to LV, HV to E, LV to E. Three winding transformer: HV to IV, HV
to LV, IV to LV, HV to E, IV to E, LV to E.
Oil temperature should be noted at the time of insulation resistance test of
transformer. Since the IR value of transformer insulating oil may vary with
temperature. IR values to be recorded at intervals of 15 seconds, 1 minute and 10
minutes.
With the duration of application of voltage, IR value increases. The increase in IR is
an indication of dryness of insulation.
Absorption coefficient = 1 minute value/ 15 secs. value.
Polarization index = 10 minutes value / 1 minute value.
is observed that whether any failure of insulation occurs or not during the test. Second
one is induced voltage test of Transformer where, three phase voltage, twice of rated
secondary voltage is applied to the secondary winding for 60 second by keeping the
primary of the transformer open circuited. The frequency of the applied voltage
should be double of power frequency too. Here also if no failure of insulation, the test
is successful. In addition to dielectric tests of transformer there are other type test for
checking insulation of transformer, such as lightning impulse test, switching impulse
test and partial discharge test.
Induced Voltage Test of Transformer
The induced voltage test of transformer is intended to check the inter turn and line end
insulation as well as main insulation to earth and between windings15.
Keep the primary winding of transformer open circuited.
16.
Apply three phase voltage to the secondary winding. The applied voltage
should be twice of rated voltage of secondary winding in magnitude and
frequency.
17.
The duration of the test shall be 60 second.
18.
The test shall start with a voltage lower than 1/3 the full test voltage, and
it shall be quickly increased up to desired value.
The test is successful if no break down occurs at full test voltage during test.