Project: Sekolah Menengah Kebangsaan Gambang, Kuantan, Pahang Darul Makmur
Project: Sekolah Menengah Kebangsaan Gambang, Kuantan, Pahang Darul Makmur
Project: Sekolah Menengah Kebangsaan Gambang, Kuantan, Pahang Darul Makmur
Meyerhof's Formulae
Borehole No : BH-1
0 SILT 1.7 250 0.000 0 0.0 0.00 0.00 0.00 0.00 0.00
1.00 SILT 1.7 250 1.100 4 2.0 3.74 3.74 96.21 99.95 39.98
2.00 SILT 1.7 250 1.100 6 5.0 9.35 13.09 144.32 157.40 62.96
3.00 SILT 1.7 250 1.100 13 9.5 17.76 30.85 312.69 343.53 137.41
4.00 SILT 1.7 250 1.100 14 13.5 25.24 56.08 336.74 392.82 157.13
5.00 SILT 1.7 250 1.100 35 24.5 45.80 101.89 841.85 943.74 377.49
6.00 SAND 2.0 400 1.100 9 22.0 48.39 150.27 346.36 496.63 198.65
7.50 SAND 2.0 400 1.650 12 10.5 34.64 184.91 461.81 646.73 258.69
9.00 SAND 2.0 400 1.650 13 12.5 41.24 226.15 500.30 726.45 290.58
10.50 SAND 2.0 400 1.650 13 13.0 42.89 269.04 500.30 769.34 307.74
12.00 SILT 1.7 250 1.650 20 16.5 46.27 315.31 481.06 796.37 318.55
13.50 SILT 1.7 250 1.650 17 18.5 51.88 367.19 408.90 776.09 310.44
15.00 SILT 1.7 250 1.650 50 33.5 93.94 461.13 1202.64 1663.77 665.51
16.50 SILT 1.7 250 1.650 50 50.0 140.21 601.34 1202.64 1803.98 721.59
18.00 SILT 1.7 250 1.650 50 50.0 140.21 741.56 1202.64 1944.20 777.68
PROJECT : GOMBAK SQUARE DEVELOPMENT
JOB NO : 24281
CLIENT : DATA KINETICS SDN BHD
Meyerhof's Formulae
Borehole No : BH-4
0 SILT 1.7 250 0.000 0 0.0 0.00 0.00 0.00 0.00 0.00
1.00 SILT 1.7 250 1.100 4 2.0 3.74 3.74 96.21 99.95 39.98
2.00 SILT 1.7 250 1.100 4 4.0 7.48 11.22 96.21 107.43 42.97
3.00 SILT 1.7 250 1.100 30 17.0 31.78 43.00 721.58 764.58 305.83
4.00 SILT 1.7 250 1.100 10 20.0 37.39 80.39 240.53 320.92 128.37
5.00 SILT 1.7 250 1.100 11 10.5 19.63 100.02 264.58 364.60 145.84
6.00 SILT 1.7 250 1.100 11 11.0 20.56 120.58 264.58 385.16 154.07
7.50 SILT 1.7 250 1.650 13 12.0 33.65 154.23 312.69 466.92 186.77
9.00 SILT 1.7 250 1.650 9 11.0 30.85 185.08 216.48 401.55 160.62
10.50 SILT 1.7 250 1.650 10 9.5 26.64 211.72 240.53 452.25 180.90
12.00 SILT 1.7 250 1.650 18 14.0 39.26 250.98 432.95 683.93 273.57
13.50 SILT 1.7 250 1.650 21 19.5 54.68 305.66 505.11 810.77 324.31
15.00 SILT 1.7 250 1.650 50 35.5 99.55 405.21 1202.64 1607.85 643.14
16.50 SILT 1.7 250 1.650 50 50.0 140.21 545.42 1202.64 1748.06 699.23
18.00 SILT 1.7 250 1.650 50 50.0 140.21 685.64 1202.64 1888.28 755.31
PROJECT : SEKOLAH MENENGAH KEBANGSAAN GAMBANG, KUANTAN, PAHANG DARUL MAKMUR
PILE SIZE : 350 mm Spun Pile = 0.35 m based on ICP high strength concrete spun pile,
recommended maximum structural axial working
Factor of Safety(F.S) , skin friction : 2.5 load for 300 mm dia, is 850 kN
end bearing : 2.5
Meyerhof's Formulae
Borehole No : BH-3
0 SILT 1.7 250 0.000 0 0.0 0.00 0.00 0.00 0.00 0.00
1.00 SILT 1.7 250 1.100 4 2.0 3.74 3.74 96.21 99.95 39.98
2.00 SILT 1.7 250 1.100 6 5.0 9.35 13.09 144.32 157.40 62.96
3.00 SILT 1.7 250 1.100 30 18.0 33.65 46.74 721.58 768.32 307.33
4.00 SILT 1.7 250 1.100 5 17.5 32.72 79.45 120.26 199.72 79.89
5.00 SILT 1.7 250 1.100 10 7.5 14.02 93.47 240.53 334.00 133.60
6.00 SILT 1.7 250 1.100 12 11.0 20.56 114.04 288.63 402.67 161.07
7.50 SILT 1.7 250 1.650 11 11.5 32.25 146.29 264.58 410.87 164.35
9.00 SILT 1.7 250 1.650 10 10.5 29.44 175.73 240.53 416.26 166.50
10.50 SILT 1.7 250 1.650 11 10.5 29.44 205.18 264.58 469.76 187.90
12.00 SILT 1.7 250 1.650 13 12.0 33.65 238.83 312.69 551.51 220.61
13.50 SILT 1.7 250 1.650 14 13.5 37.86 276.68 336.74 613.42 245.37
15.00 SILT 1.7 250 1.650 16 15.0 42.06 318.75 384.85 703.59 281.44
16.50 SILT 1.7 250 1.650 50 33.0 92.54 411.29 1202.64 1613.93 645.57
18.00 SILT 1.7 250 1.650 50 50.0 140.21 551.50 1202.64 1754.14 701.66