Abutment Spring and Pier Design Seismic
Abutment Spring and Pier Design Seismic
Abutment Spring and Pier Design Seismic
PROJECT :
LOCATION No. 27 SOIL SPRING AT ABUTMENT A & B
NAME OF BRIDGE BRIDGE 27 ABUTMENT A
BOREHOLE No. 1 BOREHOLE ELEVATION = 0.00 m.
CALCULATION OF SOIL SPRINGS FOR ABUTMENTS :
Check if Backwall will break:
f'c = 21 MPa fvc = 0.67 Mpa
vc = 0.17 *√ fc' MPa Vc = 1849.20 kN(Shear Cap of Conc.)
f= 0.85 for shear Bearing friction resistance force Bf: m= 0.40
t bkwll = 300 mm Bf = m*Fy = 327.74 kN
from Staad Analysis: (No Release of Fx)
@ jt # 1
Fx = 1428.27 kN (LOAD # 2)
Fy = 819.35 kN (LOAD # 1)
Vc = 1849.20 > Fx = 1428.27 kN
Conclusion:
Since Vc is less than Fx so backwall will break!
A. Basic Data :
Backwall Height from top of coping : 2.500 m
Backwall Length : 9.200 m
Wingwall Height (@ Backwall) : 4.300 m
Wingwall Height (@ End) : 4.300 m
Wingwall Length (Inside) : 3.000 m
Number of Piles : 2
Ks_ Soil : [47000] 47,000.00 kN/m^3 Longitudinal
Ks_ Soil: [102000] 102,000.00 kN/m/m Transverse
Ks_Pile : = 3EI/L 3
= 15,000.00 kN/m/pile Long'l and Transv.
B. Calculations :
1.1 LONGITUDINAL :
x
D= 1800
Effective Area :
Aeff = 6.43 m²
Vzs = 33.04 kN
Mxs = 131.65 kN.m
Modified Design Forces = 1.0 (DL + B + E + EQM)
Response Modification Factor
R = 3 --> for single column
= 5 --> for double/multiple column
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Vx = 1578.71 KN
Vz = 936.79 KN
Vu = sqrt[(Vx)² + (Vz)²]
Pu = 2486.88 ± 4398.97
Pu min = -1912.09 KN
Pu max = 6885.85 KN
Mx = 2036.07 kN.m
Mz = 1005.05 kN.m
Vx = 650.32 KN
Vz = 2567.92 KN
Vu = sqrt[(Vx)² + (Vz)²]
fc' = 21 MPa
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Case 1 : (1.00 Longi. + 0.30 Trans.) + DL+SF Case 2 : (0.30 Longi. + 1.00 Trans.) +DL+SF
EQM EQM
Pu min = 1020.19 KN Pu min = -1912.09 KN
Pu max = 3953.57 KN Pu max = 6885.85 KN
d Mu = 2538.58 kN.m (Elastic Mo.) d Mu = 2270.62 kN.m (Elastic Moment)
Vu = 1835.73 kN (Elastic Shear) Vu = 2648.99 kN (Elastic Shear)
Center of Mass
1.30 Mn
h
l a
Vl Vr
1.30 Mn
PDl - Dr PDl + Dr
Input Data :
a = 5.50 m
l = 6.00 m PDll = 2486.88 Kn
h = 8.73 m PDlr = 2486.88 Kn
Mnl = 11080.73 Kn-m Result from PCA COL (Dead load @ Left Column)
Mnr = 11080.73 Kn-m Result from PCA COL (Dead load @ Right Column)
Mpl = 14404.95 Kn-m
Mpr = 14404.95 Kn-m
Procedure:
Step No.1 ; Mp = 1.30 Mn
Step No.2 ; Vl=Vr = Sum 1.30 Mn/ l
Step No.3 ; Dr =((Vl+Vr)*h - Sum 1.30Mn)/a
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Note: OK
Summary:
Axial Forces :
Elastic = 2486.88 ± 1466.69 kN Load case 1
Pmax = 3953.57 kN
Pmin = 1020.19 kN
Elastic = 2486.88 ± 4398.97 kN Load case 2
Pmax = 6885.85 kN
Pmin = -1912.09 kN
Plastic = 2486.88 ± 8479.23 kN
Pmax = 10966.11 kN
Pmin = -5992.35 kN
Shear Forces:
Elastic = 2648.99 kN Load Case 2
Plastic = 5220.83 kN
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Try Ø = 16 @ 100 mm
Av = [ (vu - vc ) x b x S ] / fy
= 297.26 mm²
Av / 2 = 148.63 mm²
Use : 16 mm Dia. Bars Ab = 201.06 mm²
@ 100 mm Pitch @ Outside Region
----> For outside Column End Region
4. Column at End Region
Dimension of Column @ End Region
- Max Cross-Section = 1800 mm
- 1/6 Clear Height = 1000 mm
- 450 mm (18 inches) = 450 mm
Note:
Use 1800 mm From Top and Bottom of Column
[GIVEN DATA]
Unit Wt. of Soil , gc = 19.00 KN/m³ Pile Length = 16.00 m
Unit Wt. of Conc. gc = 24.00 KN/m³ Diameterof Col.= 1.80 m
Total Height of Column (H) = 6.00 m Length of Coping = 9.12 m
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
D1
Vp
h= 2.00 Mp
B = 7.60
b = ( kH D / 4 E I )^¼ m-1
1. Horizontal subgrade reaction coefficient , kH
N = 14 ( 1/ b = 4.80 m , Is it OK?)
a = 1 (Ordinary Time)
2 (During Earthquake)
E0 = 28 N * 98067 = 38442 k Pa
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
2. Ordinary Time
BH = [ ( 4 Ep I D³ ) / ( ( 1 / 0.3 )¼ * a ^(4/29)
= 2.592 m
Check for BH :
BH = ( D/ b )½ = 2.592 m ... OK
1/b = 4.799 m
1
l - h+
b
h - Length of pile above ground. (m)
Where:
V M + ½. l . H . ( h + 1/ b )
Pni = + * Xi
n n K2²
S ( Xi² ) + . ( K4 - )
Kv K1
H
Ph =
n Mt
1
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Mt = { M - S ( Pni . Xi )}
n
n K 2
H + * M
Kv . S ( Xi² + nK 4 )
dx =
(n K1)²
n K1 -
Kv S ( Xi² + nk4 )
PH b. Lmh Mmh
Mmh = * [(1+2 b ( h + ho )]² + 1 * e ¯
2 b Lmh
where:
1 1 1
Lmh = tan¯ *
b (1 + 2 b . h )
V (tf) 1171.99
H (tf) 374.26
M (tfm) 2972.14
b) Constant :
K1 = 29288 tf/m
K2=K3 = 59094 tf/rad , tf/m
K4 = 238464 tm/m
KV = 186222 tf/m
b = 0.25 m-1
h = 0.00 m
c) Arrangement of Piles :
ROW 1 2 3 4 5 6 7 TOTAL
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Xi
Xi²
No.
D. Results of Analysis :
a) Reaction and Displacement :
CASE-1 CASE-2 CASE-3 CASE-4
qd 20
10
0
5
7.5
EQUIVALENT EMBEDDED DEPTH IN BEARING LAYER
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
PILE DIAMETER
FIG. 2 (qd/N) vs. EMBEDDED DEPTH RATIO
When embedded depth into bearing layer, ld = 0.50 m
ld/D = 0.4
qd/N = 11.43 from Fig. 2
qd = 11.43 x 40
457.14 t/m²
ULTIMATE SHAFT RESISTANCE
Borehole No. 1
Depth Soil Classification li Ñ fi li . fi
(m) (m) (SPT) (kPa)
0.0 - 0.00
0.0 - 0.00 Silty Sands 0 0 0 0
4.0 - 4.00 Silty Sands 0 14 28 0
4.0 - 4.50 Silty Sands 0.5 14 28 14
4.5 - 6.00 Silty Sands 1.5 16 32 48
6.0 - 7.50 Silty Sands 1.5 18 36 54
7.5 - 9.00 Silty Sands 1.5 20 40 60
9.0 - 10.50 Silty Sands 1.5 23 46 69
10.5 - 12.00 Silty Sands 1.5 31 62 93
12.0 - 13.50 Silty Sands 1.5 60 120 100
13.5 - 15.00 CORING 1.5 100 200 200
15.0 - 16.50 CORING 1.5 100 200 200
16.5 - 18.00 CORING 1.5 100 200 200
18.0 - 19.50 CORING 1.5 100 200 200
-
S li fi = 1238
Qs = u S ( li . fi ) = 5445.02 kN
Qt = qd . A = 6903.48 kN
Ru = Qs + Qt = 12348.499 kN = 1258.77 Ton
Ru = 1258.77 Ton
Ultimate Capacity = 1258.77 #VALUE! #VALUE! #VALUE!
12587.6642 kN #VALUE! kN
Note : For sand/gravel layer, corrected n - value is 0.60 n -obtained
For cobbles/gravel layer, corrected n-value is computed using
the min. last 2 blow n-obtained multiply by 2
b.) Ultimate Uplift Capacity, Pu
Pu = Qs + Wp
Wp = Weight of Pile
= 45.36 ton/Pile
Qs = 555.05 ton/Pile
h = 2.00
1 3
1.70 2.10 2.10 1.70
B = 7.60 m
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Mu = #VALUE! kN . m/m
fc'= 21 MPa
fy= 414 MPa
Top d = #VALUE! - 94 = #VALUE! mm
ø= 0.90
Check forCracking Moment of Section
Mcr = 1888.27 kN-m
1.2 Mcr = 2265.93 kN-m > #VALUE! kN-m
1.33 x As Req'd = #VALUE! kN-m
Mu Use Mu = #VALUE! kN-m
Rn =
øbd²
= #VALUE!
m = 0.85 . fc'
fy
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
= 0.0431
r = m - m² - 2mRn
fy
= #VALUE!
Substi:
As = r bd
= #VALUE! mm²
Try Ø 28 Ab = 615.7536 mm²
s = Ab*1000/As
s = #VALUE! mm say 150 mm
h = 2.00 wc1
1 3
1.70 2.10 2.10 1.70
B = 7.60
@ Transverse Direction:
2.55 5.50 2.55
h= 2.00 m
Ml Mr
Wf
Pt. "o"
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
SUMMARY OF FORCES
Load Forces (kN) L.A Moment @ Pt. "o"
Fz Fy (m) R.M O.M
Ws 2656.6 5.30 14079.8
Wf 3866.9 5.30 20494.5
0.5wtg of Ctr pile 453.6 0.47 211.7
Pl -5992.4 8.05 48238.4
Vl 3051.9 2.00 6103.8
Ml - 8741.4
Pr 10966.1 2.55 27963.6
Vr 5251.2 2.00 10502.4
Mr - 15753.6
TOTAL 8303.1 11950.8 - 62749.6 89339.6
Note: Reference Axis- Global Axis
0.10Ø = 0.18
1.83
1. x = RM - OM
Fy
= -2.22 m
e = L/2 - x
= 7.52 m
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
V (tf) 1218.23
H (tf) 846.39
M (tfm) 9167.12
2. Constant :
K1 = 29288 tf/m
K2=K3 = 59094 tf/rad , tf/m
K4 = 238464 tm/m
KV = 186222 tf/m
b = 0.25 m-1
h = 0.00 m
3. Arrangement of Piles :
ROW 1 2 3 4 5 6 7 TOTAL
ROW 8 9
Xi
Xi² #VALUE!
No.
D. Results of Analysis :
1. Reaction and Displacement :
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
h = 2.00 Wc1
Wc1 Wf 0
3.30 3.30
2.00 3.30 3.30 3.30 2.00
A L = 10.60 B
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Mu = #VALUE! kN . m/m
fc' = 21 MPa
fy = 414 MPa
Bott. d = 2000 - 214 = 1786 mm
ø = 0.9
Check for Cracking Moment of Section
Mcr = 1888.27 kN-m
1.2 Mcr = 2265.93 kN-m #VALUE! #VALUE! kN-m
Use #VALUE! kN-m
Rn = Mu/øbd²
= #VALUE!
m = 0.85 . fc'
fy
= 0.043
r = m - m² - 2mRn
fy
= #VALUE!
As = r bd
As = #VALUE! mm²
Try Ø 32 Ab = 804.25 mm²
s = Ab*1000/As
s = #VALUE! mm say 150 mm
Thus, provide Ø 32 mm @ 150 mm for bottom bars.
h = 2.00 Wf
Wc1
PN1
2.00 3.30 3.30 3.30 2.00
A W = 10.60 B
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
FORCES (kN)
Pile Reaction, PN1 = #VALUE!
Wt. of Soil, Ws1 = -280.30
Wt. of Ftg., Wc1 = -323.22
Vu "d" = #VALUE! kN
Vud per meter Strip = #VALUE! kN
Vu = #VALUE! kN Allow. Vc = 0.166 fc' b d where:
Vn = Vu/ø d = 1786 mm
= #VALUE! kN #VALUE! 1358.62 kN b = 1000 mm
#VALUE! ø = 0.85
Data:
////\\\\///\\\ PN3 = #VALUE! Kn n= 3
2.20 L = 10.60 m
Ø= 0.9
fy = 276 Mpa
2.00
PN3
Determine area of reinforcement:
As = VL/Ø fy
Where:
VL= Weight of footing , soil and uplift force of piles
= #VALUE! Kn
Substi:
As = #VALUE! mm²
Compute for number of Bars: =
Ab, Area Ø 16 201.06 mm²
No. of J Bars = As/Ab
= #VALUE! Pcs. Say #VALUE! Pcs.
2. Transverse Direction:
1.83
///\\\///\ Data:
2.20 PN9 = #VALUE! Kn n= 0
PN8 = #VALUE! Kn n= 0
B = 10.60 m
2.00
PN8 PN9
Determine area of reinforcement:
As = VL/Øfy
Where:
VL = Weight of footing , soil and uplift force of piles
= #VALUE! Kn
Substi:
As = #VALUE! mm²
Compute for number of Bars: =
Ab, Area Ø 16 201.06 mm²
No. of J Bars = As/Ab
= #VALUE! Pcs. Say #VALUE!
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
1.80 Ml Mr
Vl Pl Vr
Pr
Fig 5: Coping Dimension
Note: Coping shall be Design to resist Plastic Moment of Col. Mnl = 11080.73 Kn-m
Due To Earthquake Motion @ Top of Coping. Mnr = 11080.73 Kn-m
Reduction Factor R, = 1
Step Mp= 1.30Mn Column Shear Forces Dr Col. Axial Forces %
Left Right Left Right Total Left Right
1 14404.95 14404.95 2486.88 2486.88
2 4801.65 4801.65 9603.30
3 7380.23 15283.16 10010.13 -7523.3 12497.01
4 2460.08 5094.39 7554.46
5 9155.77 15753.56 7874.50 -5387.6 10361.38 -21.33
6 3051.92 5251.19 8303.11
7 8654.86 -6168.0 11141.74 9.91
Note: OK
SUMMARY OF FORCES
@LEFT @ Right
Ml=Mp = 9155.77 kN.M Mr=Mp = 15753.56 kN.M
Vl = 3051.92 kN Vr = 5251.19 kN
Pl = -6168.0 kN Pr = 11141.74 kN
Governed Loads:
Mu = 15753.56 kN.M
Vu = 11141.74 kN
460781370.xls
Checked
Bridge Name : Filename 02/20/20
DESIGN OF PIER 1, COLUMNS, COPING PILE CAP AND BORED PILE CAPACITY
Thus, Provide 20- Ø 32 Two Layer Bars for Top & Bot. Bars
Vs = Av fy d/s
Vs = 11584.18 kN
øVu = 12500.58 kN > 11141.74 kN
Therefore, Safe !