Professional Documents
Culture Documents
HSE Report
HSE Report
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
2
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
5
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
6
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
7
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
As per basic safety requirements site safety induction should be done before executing site activities for all site staff but unfortunately there is
no record available at site regarding this manner.
No job related trainings have been conducted at site yet for site staff.
It is found there is no colour code system have been applied yet for all kind of equipment and tools.
In case of emergency no certified ER Team or any mean of access has been assigned yet.
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3
HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120
Recommendations:
To meet all above mentioned basic HSE requirements it is compulsory to provide one designated HSE office with one PC ,printer and lamination
machine and other essential office utensils to create and maintain training material and safety signage. For emergency rescue we have to assign and