National Housing Program – wave 03

Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020

Project Name: Developmental Housing Program of MOH wave 3


Date: 11/02/2020
Project Observations and Recommendations

Item Location Observation Note Recommendation

Office or Sitting Capacity in the


Laydown area for HSE Personnel  Provide one Office

 No office or sitting capacity in


Laydown area for HSE Manager and
its team.
 No Place to maintain HSE documents
and Safety items.
 It is one office for all office staff with
1. few chairs where all staff has to sit.
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020

Welfare Facilities  We have to provide all basic


 No Rest shelter welfare facilities at site.
 No Drinking shelters
 No Smoking shelters
 No Toilets available at site
 No First Aid area
 No Safety signage

2
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020


Item Location Observation Note Recommendation

Personal Protective Equipment(PPEs)  We have to provide Basic PPEs at


site for all workers and the
 It is observed workers don’t have visitors.
basic PPE at site.
 No PPE availability at site store for
workers and visitors.
 Even most of the workers are
working without shoes.
3
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020


Item Location Observation Note Recommendation

Basic Electrical Safety  We have to provide plugs,


electrical panels, circuit breakers
 It is observed no plugs installed with with ELCB protection.
electrical cables.
 Naked wires without plugs are being
used at work place which may lead to
any big incident.
 No circuit breakers found with electrical
appliances at workplace.
4
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020


Item Location Observation Note Recommendation

Substandard Scaffolding and  We have to provide standard


platforms scaffolding and elevated
platforms.
 It is observed substandard scaffolding is
being used at site which is not even
erected properly.
 Blocks and empty are being used for
elevated platforms.

5
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020


Item Location Observation Note Recommendation

Homemade/ Substandard ladders  We have to provide Standard


Type A ladders.
 It is observed homemade/substandard
ladders are being used at site.

6
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020


Item Location Observation Note Recommendation

Designated Denailing Area  There should be one designated


area for denailing plywood with
 It is observed there is no designated warning signs and safety mesh.
denailing area at site, so many protruding
nails plywood accumulated at site
without any warning signs.

7
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020

Basic Other Safety Requirements:


I. HSE Documentation

As per basic safety requirements site safety induction should be done before executing site activities for all site staff but unfortunately there is
no record available at site regarding this manner.

II. Job related Trainings

No job related trainings have been conducted at site yet for site staff.

III. Tool Box Talk

There is no practice of daily Tool Box talk at site.

IV. Monthly colour code system

It is found there is no colour code system have been applied yet for all kind of equipment and tools.

V. Emergency Rescue System

In case of emergency no certified ER Team or any mean of access has been assigned yet.
National Housing Program – wave 03
Developmental Housing Program of MOH wave 3

HSE REPORT
Kabbani Architectural Concepts
Doc. N° F-eb -A01--021120

HSE OBSERVATIONS & RECOMMENDATIONS – YEAR 2020

Recommendations:
To meet all above mentioned basic HSE requirements it is compulsory to provide one designated HSE office with one PC ,printer and lamination
machine and other essential office utensils to create and maintain training material and safety signage. For emergency rescue we have to assign and
train competent persons from the site staff and assign of vehicle regarding this manner.