PR 1947 Electrical Safety Rules PDF
PR 1947 Electrical Safety Rules PDF
PR 1947 Electrical Safety Rules PDF
Electrical Infrastructure
User Note:
The requirements of this document are mandatory. Non-compliance shall only be authorised by
the Document Owner or his Delegate through STEP-OUT approval.
A controlled copy of the current version of this document is on PDO's EDMS. Before making
reference to this document, it is the user's responsibility to ensure that any hard copy, or
electronic copy, is current. For assistance, contact the Document Custodian or the Document
Controller.
i Document Authorisation
Authorised For Issue: Oct. 2010
ii Revision History
The following is a brief summary of the 4 most recent revisions to this document. Details of all
revisions prior to these are held on file by the issuing department.
TABLE OF CONTENTS
i Document Authorisation.......................................................................................... 3
ii Revision History...................................................................................................... 4
iii. RELATED BUSINESS PROCESS..........................................................................4
iv. RELATED CORPORATE MANAGEMENT FRAME WORK (CMF) DOCUMENTS 4
1 Introduction............................................................................................................. 7
2 Glossary.................................................................................................................. 8
Electrical Definitions.......................................................................................................................... 8
2.2 OTHER DEFINITIONS........................................................................................................... 14
2.3.................................................................................................................................................... 15
PDO AREAS.................................................................................................................................... 15
2.4 ABBREVIATIONS................................................................................................................... 15
Page 4 PR-1947 Electrical Safety Rules Printed
06/10/2010
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version 9.0
Petroleum Development Oman LLC
Effective:-Oct 10
1 Introduction
These Electrical Safety Rules are intended for the use of such employees of PDO and its
contractors who may be concerned with the operation of, or work on, PDO HIGH VOLTAGE
and associated LOW VOLTAGE electrical systems. The Rules are additional to the generally
applicable safety requirements of the Company, specifically the Permit-to-Work System (PR-
1172) as operated by the Company, together with the PDO HSE Manual.
The application of these Rules is mandatory.
The authority for revision of these Rules rests with the Corporate Functional Discipline Head
Electrical.
All copies of these Rules shall be issued in accordance with PR-1948, ESOP 1.
The Rules shall not apply to three & single phase LOW VOLTAGE APPARATUS inside
workshops, laboratories, commercial, domestic and similar buildings or to portable electric
tools, all of which are not considered to be part of PDO's electrical systems which come within
the scope of these Rules.
The Rules shall not be applied to batteries for all purposes, instrument or telecommunication
circuits operating at up to 110 volts DC and AC, nor to radio frequency, or low energy high
voltages as found in cathode ray tubes, radar, air-conditioning systems/plants and cathodic
protection systems.
However the principles of the safe working methods contained in subsection 5.4 of these Rules
shall be followed, where practicable, when working on any LOW VOLTAGE circuits within the
PDO concessions.
The ESRs forbid unauthorised staff to execute any electrical operational activity
It is however acceptable that:-
1. Unauthorised contractor staff carry out job-related-tasks, for which no electrical
authorisation is required, whilst under the direct supervision of authorised staff.
2. Contractor's equipment is used to execute the job.
Such equipment shall comply with the appropriate PDO HSE regulations.
2 Glossary
Electrical Definitions
For the purpose of these Electrical Safety Rules, the following definitions shall apply and where
used shall be printed in capital letters. The definitions have been grouped into categories
dealing with specific aspects of electrical safety
DANGER
A risk of bodily injury or loss of life or health from shock, burn, asphyxiation or other causes.
DEAD
At or about zero potential and disconnected from any LIVE system.
LIVE
Electrically charged.
SAFETY DISTANCE
The distance from the nearest LIVE HIGH VOLTAGE exposed conductor or from an insulator
supporting a HIGH VOLTAGE conductor which shall be maintained to avoid DANGER.
SWITCHING
The operation of circuit breakers, isolators, disconnectors, fuses or other methods of making
or breaking an electrical circuit and/or the application and removal of CIRCUIT MAIN
EARTHS and LV EARTHS.
WORKING PARTY
The persons under the direct supervision of a COMPETENT ELECTRICAL PERSON or an
AUTHORISED ELECTRICAL PERSON.
CAUTION NOTICE
A notice in an APPROVED form attached to electrical APPARATUS or its controls conveying
a warning against interference with such APPARATUS. These notices shall be attached to all
points of ISOLATION from which APPARATUS can be made LIVE.
CERTIFICATE OF APPOINTMENT
A form of identification issued by the CFDH-E to appoint PDO (and non-PDO) staff to a level of
electrical authorisation. (see Appendix G)
DANGER NOTICE
A notice in an APPROVED form reading 'DANGER' with any additional wording calling
attention to the DANGER of approaching or interfering with such LIVE APPARATUS.
EARTHED NOTICE
A notice in an APPROVED form reading 'EARTHED' that shall be used to identify APPARATUS
that has been used to apply a CIRCUIT MAIN EARTH to a circuit
EXCAVATION CERTIFICATE
A form of declaration endorsed by all relevant service departments and issued under the
Permit-to-Work system to ensure that all underground services and power cables are identified
and safe methods of excavation are followed.
LIMITATION-OF-ACCESS (LOA)
A form issued and canceled by an AUTHORISED ELECTRICAL PERSON to a COMPETENT
ELECTRICAL PERSON defining the limits and nature of work which will be carried out in the
vicinity of LIVE APPARATUS. A LIMITATION-OF-ACCESS shall be issued when an
ELECTRICAL PERMIT-TO-WORK or SANCTION-FOR-TEST is not applicable and when
verbal instructions are not considered sufficient. (see Appendix D).
A LIMITATION-OF-ACCESS shall also be issued to a person in charge of work on LIVE HIGH
VOLTAGE conductors or insulators supporting LIVE HIGH VOLTAGE conductors when LIVE
LINE WORKING or LIVE LINE WASHING procedures are to be used.
SANCTION-FOR-TEST (SFT)
A form of declaration signed and issued by a SENIOR AUTHORISED ELECTRICAL PERSON
to an AUTHORISED ELECTRICAL PERSON in charge of testing HIGH VOLTAGE
APPARATUS for the purpose of making known to such person exactly what APPARATUS is to
be tested and the condition under which testing is to be performed. (see Appendix C).
SWITCHING PROGRAMME
An APPROVED schedule which lists in sequence the SWITCHING operations necessary to
achieve a defined purpose on the system.
This schedule may include ISOLATION and EARTHING of HIGH VOLTAGE APPARATUS to
make it safe prior to the issue of an ELECTRICAL PERMIT-TO-WORK or SANCTION-FOR-
TEST.
WORK PERMIT
(The class A or B Permit-to-Work)
A form of declaration signed and issued by the custodian of equipment or plant to the person in
charge (Permit Holder) of a working party, giving clearance to work on the specified equipment
or plant, detailing restrictions and precautions required to carry out the specified work safely.
The permit shall state which other certificates or permits are required prior to starting work (eg.
, ELECTRICAL PERMIT-TO-WORK).
KEY SAFE
An APPROVED device for the secure retention of all SAFETY PADLOCK keys used to lock
means of ISOLATION, EARTHING or other safety devices in accordance with these Rules.
LV EARTH
An earth of an APPROVED design that may be used on LOW VOLTAGE APPARATUS when it
is worked on under an ELECTRICAL PERMIT-TO-WORK.
SAFETY PADLOCKS
Locks of an APPROVED type with a unique key, that shall be used to lock switches, etc, at
points of ISOLATION where the APPARATUS being worked on could be made LIVE in error.
Only one key shall be supplied for each lock.
2.1.4 Persons
Refer to ESOP-3 (PR-1948) for procedures on selection, training, assessment and
appointment of Electrical Persons and Appointed Persons.
Qarn Alam (Q), including Saih Nihayda, Saih Rawl, Barik, Musallim,
Mabrouk
2.4 ABBREVIATIONS
AE Additional Earth
AP Appointed Person
AEP Authorised Electrical Person
CEP Competent Electrical Person
CESP Competent Electrical Switching Person
CFDH-E Corporate Functional Discipline Head Electrical
CME Circuit Main Earth
CofA Certificate of Appointment
CP Control Person
ELV Extra Low Voltage
EMC Engineering Maintenance Contract
EPC Engineer, Procure & Construct contract
ESB Electrical Safety Bulletin
ESOP Electrical Safety Operational Procedure
ESP Electrical Sumessible Pump
ESR Electrical Safety Rules
HV High Voltage
IEC International Electrical Committee
LLW Live Line Work
LL Washing Live Line Washing
LV Low Voltage
PDO Petroleum Development Oman LLC
SAEP Senior Authorised Electrical Person
SAP Systems, Applications and Products
SOP Switchgear Operating Procedures
SRD Safety Reference Document
OETC Oman Electricity Transmission Company SAOG
OPWP Oman Power and Water Procurement Company SAOG
Page 15 PR-1947 Electrical Safety Rules Printed
06/10/2010
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version 9.0
Petroleum Development Oman LLC
Effective:-Oct 10
3. General Requirements
3.1 DUTY
It is the duty of all persons, including contractors and sub-contractors employed by PDO, who
work on the electrical systems within PDO areas, to make themselves thoroughly conversant
with and to conduct their work in accordance with all Rules governing the operation or work
they have to undertake on such systems.
Furthermore, it is the duty of these persons to use any means or appliance provided by PDO
for securing safety and also not willfully to do anything likely to endanger themselves or others.
Contravention of these Rules shall constitute misconduct. Any person (whether PDO or non-
PDO staff) who contravenes these Rules shall be liable to dismissal or be otherwise dealt with
in accordance with Personnel Disciplinary procedures.
3.2 OBJECTIONS
Any person objecting on operational or safety grounds to any instructions given to him
regarding the operation of HV or LV APPARATUS or work on electrical equipment shall make
these objections clearly known to the person issuing them.
This person shall then have the matter investigated and if necessary referred to a higher
authority for a decision before proceeding.
4.1 GENERAL
The authorisation of staff to SAEP, AEP, CESP, CEP, CP and AP operating and working under
the scope of these Rules shall follow the definitions given in Rule 2.1.4.
4.2 APPOINTMENT
The method of training, assessing and subsequent appointing of such PERSONS is detailed in
ESOP 3.
5.1 ACCESS
5.2.1 General
5.2.1.1 No HV SWITCHING shall be carried out without the agreement of the CP responsible for that
section of the electrical system.
Page 19 PR-1947 Electrical Safety Rules Printed
06/10/2010
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version 9.0
Petroleum Development Oman LLC
Effective:-Oct 10
5.2.1.2 In normal circumstances all HV SWITCHING shall be carried out only after a written
APPROVED SWITCHING PROGRAMME has been agreed.
SWITCHING PROGRAMMES need not normally be prepared for SWITCHING on HV motor
circuits unless required by the CP.
5.2.1.3 When the CP gives agreement for HV SWITCHING to be carried out he shall, if practicable,
communicate directly with the person who is to carry out the SWITCHING.
SWITCHING to the CP's instructions, or with his consent, shall be carried out without undue
delay.
All HV SWITCHING shall be reported to the CP as soon as possible after each operation or
at an agreed stage of a SWITCHING PROGRAMME.
5.2.1.4 The remote opening and closing of HV circuit breakers may be carried out by
unaccompanied suitably authorised operators.
All other HV SWITCHING shall be carried out by an AEP who shall be accompanied during
the SWITCHING operations. (See also Rule 5.5.2.2 when applying CIRCUIT MAIN
EARTHS).
5.2.1.5 When operating pole mounted switchgear by mechanical means from ground level, the
operator shall wear rubber gloves of an APPROVED type and an APPROVED safety helmet.
5.2.1.6 Making LIVE or DEAD by signal or prearranged understanding after an agreed time interval
is forbidden.
5.2.1.7 When switchgear or any other HV APPARATUS shows any sign of distress, its condition shall
be reported immediately to the CP and it shall be examined before a decision is made about
further operation.
The keys for the SAFETY PADLOCKS shall be placed in a KEY SAFE or another
APPROVED security method shall be used.
(c) Connected to EARTH at all points of disconnection from HV supplies to such
APPARATUS or between such points and the points of work or testing.
(d) Screened where necessary to prevent DANGER and DANGER NOTICES attached.
(e) Released for work by the issue of an ELECTRICAL PERMIT-TO-WORK to a CEP
who shall be accompanied by another CEP during the progress of the work.
or
(f) Released for testing by the issue of a SANCTION-FOR-TEST to an AEP who shall
be accompanied by another AEP or CEP during the progress of the testing.
If an HV testing supply is to be used then Rule 5.7.2 shall also apply.
and
(g) The person receiving the ELECTRICAL PERMIT-TO-WORK or SANCTION-FOR-
TEST is made fully aware of the nature and extent of the work or testing to be done.
It is the duty of the person issuing the ELECTRICAL PERMIT-TO-WORK or
SANCTION-FOR-TEST to ensure that these provisions are complied with.
Any work on LIVE HV conductors or insulators shall be carried out under the LIVE
LINE WORKING Rules in Section 8.0 or LIVE LINE WASHING Rules in Section 9.0.
(d) Proved DEAD with an APPROVED voltage testing device suitable for the rated
voltage of the circuit. The voltage testing device shall be checked before and after
use to check it is working correctly.
(e) EARTHED, where necessary, by an AEP, with LV EARTHS that have been applied in
accordance with Rule 5.5.3 to ISOLATED LV conductors.
(f) Released for work to the CEP when the above precautions are complete.
and
(g) The CEP who is to be in charge of the work, is made fully aware of the nature and
extent of the work to be done, and understands the precautions that he and his
WORKING PARTY shall take to avoid DANGER from LIVE APPARATUS.
NOTE: If the APPARATUS at the point of ISOLATION is not provided with suitable means of
locking or if SAFETY PADLOCKS cannot be applied, and the circuit cannot be
ISOLATED by the withdrawal of fuses or links, then other suitable precautions shall
be taken to avoid DANGER to person whilst working on the circuit.
5.4.2 An ELECTRICAL PERMIT-TO-WORK shall be issued to the CEP in charge of the work on LV
APPARATUS and conductors when it has been necessary to apply a CIRCUIT MAIN EARTH to
the ISOLATED HV windings of the transformer feeding the LV windings and connections
(including incoming switchboard units) or when an LV EARTH is applied to the LV switchboard
busbars.
When such an ELECTRICAL PERMIT-TO-WORK is issued to a CEP, he shall be accompanied
by another CEP during the progress of the work.
5.4.3 Notwithstanding the requirements of Rule 5.4.1, essential testing or adjustments may be made
with LV APPARATUS LIVE, provided that safe methods are used and APPROVED equipment
or instruments required for testing are properly insulated for the rated voltage of the circuit.
If it is necessary for safety reasons, the CEP carrying out testing or adjustments shall wear
APPROVED electrical rubber gloves.
If the testing or adjustments of LV APPARATUS requires covers to be removed so that LIVE
terminals, windings or connections are exposed, then suitable precautions shall be taken to
prevent persons coming into accidental contact or interfering with that APPARATUS.
The CEP in charge of the testing or adjustments shall be accompanied during the progress of
the testing or adjustments.
5.5 EARTHING
5.5.1 General
No HV EARTHING switch shall be operated or CIRCUIT MAIN EARTH connected or removed
except with the agreement of the CP.
(a) A circuit breaker be used to make the EARTH connection. The circuit breaker shall
normally have its trip feature made inoperative before closing to EARTH, unless this
is not practicable, when it shall be done afterwards. After closing, the circuit breaker
shall be locked in the EARTH position. An EARTHED NOTICE shall be attached on
the circuit breaker when it is in the EARTH position.
or
(b) Applying APPROVED portable EARTHING leads by an insulating pole or other
APPROVED equipment to all phase conductors.
If this method of using portable EARTHING leads is to be used, the following
sequence of procedures shall be carried.out:-
(i) Check that the circuit to be EARTHED is ISOLATED.
(ii) Ensure that each phase of the circuit is DEAD (only an HV testing device
suitable for the rated voltage of the circuit shall be used).
The APPROVED voltage testing device shall be checked before and after
use to check it is functioning correctly.
(iii) Examine the portable EARTHING leads prior to use to ensure that they are
in good condition.
(iv) Connect the portable EARTHING leads to the EARTH system before
securing them to the phase conductors. Care must be taken to ensure that
good contact is made.
(v) EARTH and short circuit all phases even if work is to be carried out on one
phase only.
and
(vi) When removing portable EARTHING leads disconnect them from the phase
conductors first and the EARTH system last.
5.5.3.3 The portable EARTHING devices shall then be applied in a similar manner to the sequence
of procedures specified in Rule 5.5.2.1b(i), (iii) (iv), (v) and (vi).
DIAGRAM 1
30cm
30cm
7.1.2 General
The procedures called for in Rule 5.1.3 and Rule 5.1.4 shall apply for all work on overhead
lines.
7.1.4 Work on Poles Supporting The High Voltage Conductors of One Circuit
No CEP shall climb any such pole supporting LIVE conductors except under the direct
supervision of an AEP, who shall ensure that the person does not ascend to a position in
which it is possible for him to bring any part of his body or working tool within the SAFETY
DISTANCES specified in Rule 5.6.
Additionally when work is to be carried out within one meter distance outside the SAFETY
DISTANCES specified in Rule 5.6, the AEP shall issue a LIMITATION-OF-ACCESS to the
CEP.
A DANGER NOTICE shall also be attached to the pole at a distance from LIVE conductors
not less than those specified in Rule 5.6.
7.1.5 Work on Towers or Structures Supporting the High Voltage Conductors of Two Circuits
No person shall climb above the anti-climbing guards of such towers or structures supporting
the LIVE conductors of two circuits, unless he is first issued with a LIMITATION-OF-ACCESS,
stating the precautions he and his WORKING PARTY shall take to avoid DANGER.
An AEP shall personally ensure that DANGER NOTICES or APPROVED red flags are attached
to all sides of the tower or structure above which, persons climbing shall be instructed not to
pass. These DANGER NOTICES or APPROVED red flags shall be attached at a distance from
the lowest LIVE conductor so that persons working on the steelwork beneath them cannot bring
any part of their bodies or working tools within the SAFETY DISTANCES specified in Rule 5.6.
The AEP shall from the ground directly supervise all such persons climbing or working on the
towers or structures.
7.1.6 Work on Single or Double Circuit High Voltage Overhead Lines with All Conductors
Dead
7.1.6.1 For work on HV conductors the AEP in addition to the procedures called for in Rule 5.3 shall:-
(a) Identify the line to be worked on in an APPROVED manner at the point of work.
(b) Where practicable ensure that the line is DEAD by checking with an APPROVED
voltage testing device.
(c) If from the point of work the conductors can be seen to be EARTHED, dispense the
check with an APPROVED voltage testing device.
(d) Issue the CEP holding the ELECTRICAL PERMIT-TO-WORK with portable
EARTHING leads that shall be used as ADDITIONAL EARTHS.
7.1.6.2 For work on HV conductors the CEP holding the ELECTRICAL PERMIT-TO-WORK shall:-
(a) Before the commencement of work apply ADDITIONAL EARTHS at or as
near as practicable to the point of work. These portable EARTHING leads
shall be used to bond together all conductors and be connected to EARTH.
An APPROVED label reading 'A.E.' shall be attached to the portable
EARTHING leads.
(b) Remove and re-apply these ADDITIONAL EARTHS at different points of
work on the line, but only if they are kept between the CIRCUIT MAIN
EARTH positions.
(c) Dispense with the use of ADDITIONAL EARTHS if CIRCUIT MAIN EARTHS
have been applied in the immediate vicinity at each side of the point of work.
(d) If the WORKING PARTY leaves the line at any time, check when they come
back, that they have returned to the same line and that all EARTHS adjacent
to the point of work, are still in position before allowing work to start again.
(e) Check that all members of the WORKING PARTY are off the line before
removing all the ADDITIONAL EARTHS.
(f) Sign the 'Clearance Section' of the ELECTRICAL PERMIT-TO-WORK.
arms of the tower or structure, between the two circuits, drawing attention to the
DANGERS of approaching the LIVE circuit.
(f) Ensure that these APPROVED red flags are attached so that all members of the
WORKING PARTY are aware that no part of their bodies or working tools shall go
beyond them and come within the SAFETY DISTANCES specified in Rule 5.6.
(g) Remain on the ground, adjacent to the tower or structure, watching whilst members
of the WORKING PARTY are working above the anti-climbing guards. Be prepared
to warn them if they approach the LIVE circuit, and are in DANGER of bringing any
part of their bodies or working tools, within the SAFETY DISTANCES specified in
Rule 5.6.
7.1.7.3 The CEP holding the ELECTRICAL PERMIT-TO-WORK shall:-
Ensure that until the work is finished and the rest of the WORKING PARTY have descended
to the ground, the conductors remain EARTHED at the point of work and the APPROVED red
and green flags and DANGER NOTICES are kept in position.
7.1.8 Work on the Common Earth Conductor of Double Circuit Overhead Lines
7.1.8.1 Before work commences on the overhead common EARTH conductor of a double circuit
overhead line, the AEP shall ensure that both circuits are made DEAD, and that the
procedures called for in Rule 5.3 and Rule 7.1.6 are applied for both circuits.
(a) Identify the area where work may be carried out safely and ensure that SAFETY
DISTANCES called for in Rule 5.6 are maintained by the WORKING PARTY and the
tools and equipment they are to use. If no ELECTRICAL PERMIT-TO-WORK or
SANCTION-FOR-TEST is issued for adjacent APPARATUS in the substation, then he
shall issue a LIMITATION-OF-ACCESS to the CEP in charge of the work, specifying
how the SAFETY DISTANCES from LIVE conductors shall be maintained during the
course of the work.
(b) If APPROVED barriers or ropes are necessary to define the safe area of work,
ensure that these are clearly visible and are not tied or supported by any structure
carrying LIVE APPARATUS or conductors. The safe area shall be identified by the
attaching of green flags inside the barriers or ropes and DANGER NOTICES
attached to adjoining LIVE APPARATUS.
(c) Ensure that ladders required for the work shall be of an APPROVED type and be
kept secure with a STANDARD ELECTRICAL PADLOCK when not in use.
When ladders are used to gain access to DEAD APPARATUS, subject to an
ELECTRICAL PERMIT-TO-WORK, these shall be locked in position with a
STANDARD ELECTRICAL PADLOCK or by any other APPROVED means such that
they cannot be removed unauthorised.
(d) Ensure that if ladders, scaffolding, cranes etc, are to be used, that the position that
they shall be placed and the route through the substation to that position shall first be
agreed. Scaffolding and cranes, etc., shall be connected to the substation EARTH
system as soon as they are in position for work to take place.
7.6.2 Precautions
For work on remotely or automatically controlled HV APPARATUS such as tap-change gear,
circuit breakers, disconnectors, etc., the AEP before work commences shall:-
(a) Ensure that all remote control and automatic features are made so that they cannot
be operated and, where practicable, secure with SAFETY PADLOCKS and CAUTION
NOTICES.
(b) Take such precautions to ensure that no work will be in progress on the tap-changer,
circuit breaker etc., when work is taking place on the controlling equipment
associated wiring or relays, except when it is undertaken by an AEP or CEP acting
under his direct supervision.
(b) ISOLATE the HV motor circuit and apply SAFETY PADLOCKS and CAUTION
NOTICE at the point of ISOLATION.
(c) EARTH the HV motor circuit at the point of ISOLATION through the circuit breaker or
by other APPROVED means, (ie. apply a CIRCUIT MAIN EARTH).
Attach an EARTHED NOTICE to the circuit breaker, if applicable.
(d) Issue an ELECTRICAL PERMIT-TO-WORK to the CEP at the point of work.
(e) Receive back the ELECTRICAL PERMIT-TO-WORK with the 'Clearance Section'
signed off by the CEP when the work is completed.
(f) Notwithstanding the requirements of Rule 5.5.1 and Rule 6.3, remove the CIRCUIT
MAIN EARTH and apply a 'megger' test to the HV motor circuit, to satisfy routine
maintenance requirements.
(g) Cancel the ELECTRICAL PERMIT-TO-WORK, remove SAFETY PADLOCKS,
CAUTION NOTICES, any DANGER and EARTHED NOTICES and restore the circuit
breaker to the service position.
7.8.2 If the design of the LV system or switchboard connections are such that complete ISOLATION
of the incoming switchgear unit to be worked on requires the ISOLATION of the HV winding of
an HV/LV transformer then, in addition to the opening of LV switchgear units, the following
procedure shall be carried out by the AEP:-
(a) All such LV switchgear units shall be opened and, where practicable, a SAFETY
PADLOCK applied.
CAUTION NOTICES shall be attached to such switchgear units.
(b) DANGER NOTICES shall be attached to LIVE APPARATUS adjacent to the point of
work.
(c) The HV/LV transformer shall be switched out, ISOLATED and a CAUTION NOTICE
attached at the point of ISOLATION.
(d) A CIRCUIT MAIN EARTH shall be applied to the HV winding of the transformer.
(e) An ELECTRICAL PERMIT-TO-WORK shall be issued at the point of work to the
person in charge of the work.
(f) Any LV EARTH applied on the DEAD switchboard shall be in accordance with Rule
5.5.3 and its application shall be recorded in the 'Other Precautions Section' of the
ELECTRICAL PERMIT-TO-WORK.
7.8.3 If work on LV switchboards does not require ISOLATION and EARTHING of HV APPARATUS
then if LV EARTHS are applied on the LV APPARATUS their application shall be recorded in
the Other Precautions Section' of the ELECTRICAL PERMIT-TO-WORK issued for the work.
(b) Apply APPROVED capacitor EARTHING devices to the common connection of each
group of capacitors.
(c) Issue ADDITIONAL EARTHS to the CEP holding the ELECTRICAL PERMIT-TO-
WORK and instruct him to apply these to the capacitor units at the point of work.
7.10.2Additional Precautions
The person in charge of work or testing in hazardous areas shall ensure that:-
(a) Before removing any covers of certified APPARATUS the incoming connections,
including the neutral, are made DEAD and have been ISOLATED at a unit outside
the hazardous area.
(b) No SWITCHING, testing or other operations are carried out on certified
APPARATUS, whilst its covers are removed and the electrical connections are
exposed to the atmosphere.
unless
(c) Suitable gas testing equipment is first used to check that no flammable gases, that
could create a hazard, are present at the point of work or testing.
8.1 GENERAL
8.1.1 To date no PDO personnel have been trained, authorised or equipped to carry out LIVE LINE
WORKING procedures on HV conductors on the PDO electrical systems.
8.1.2 Contractors selected to carry out such LIVE LINE WORKING procedures in PDO shall have
proven LIVE LINE WORKING procedures, adequately trained and experienced staff and the
necessary well maintained LIVE LINE tools and equipment to carry out such work. (See ESOP
22 for guidance).
8.1.3 The AEP before initiating LIVE LINE WORK shall ensure that the Contractor's Supervisor has
the written procedures, the necessary evidence and certificates on site to satisfy him that the
requirements of Rule 8.1.2 are met. (See ESOP 22 for guidance).
8.1.4 The LIVE LINE WORKING and the safety of the team shall be the responsibility of the
Contractor's Supervisor, who shall ensure that the procedure is carried out correctly and is
present throughout the procedure to ensure that it is in accordance with the Rules in this
Section 8.0.
to stop the work if he considers the Contractors are not working safely. (See ESOP 22 for
guidance).
The AEP shall remain on site throughout any LIVE LINE WORKING that takes place in
substations or on double circuit overhead lines. (See ESOP 22 for guidance).
8.3.5 No LIVE LINE WORKING shall commence in unfavourable conditions, such as rain, fog or
high winds.
8.3.6 If weather or other unforeseen conditions make it necessary to suspend LIVE LINE WORKING,
then the circuit conductors and the equipment shall be left in a safe condition and the CP
informed.
8.3.7 Before work commences, all conductors and associated pole top, line and tower fittings,
steelwork and insulators shall be thoroughly examined at the point of work, through binoculars
if necessary, so as to minimise the possibility of failure of these parts during LIVE LINE WORK.
This examination shall extend to include adjacent spans and supports on both sides of the
point of work.
Before any pole is climbed it shall be sounded. No pole badly impaired by decay or damage
shall be climbed until the Contractor's Supervisor is satisfied that he has made it safe for
climbing, alternatively access to the top of the pole shall be by suitable means independent of
the pole.
8.3.8 Before displacing conductors adequate precautions shall be taken to avoid DANGER and to
ensure the safety of third persons, Safe clearances shall also be maintained between the line
and other APPARATUS and objects.
8.3.9 No vehicle or person other than members of the LIVE LINE WORKING team shall be allowed
in the near vicinity of the point of work while the work is in progress without the consent of the
Contractor's Supervisor in charge of the LIVE LINE WORK. Temporary markers may be
erected to ensure this requirement is met.
8.3.10 No person shall climb, move or work in such a position to bring any part of his body, clothing
or any working tool, other than LIVE LINE WORKING tools or equipment, within the distances
as indicated in Table 3 below. This distance shall be marked on the structure.
8.3.11 The Contractor's Supervisor shall be responsible for ensuring all personnel of the LIVE LINE
WORKING team wear the protective clothing and equipment necessary for this work.
8.3.12 The AEP shall inform the CP when the LIVE LIN
9.1 GENERAL
9.1.1. To date no PDO personnel have been trained, authorised or equipped to carry out LIVE LINE
WASHING on HV insulators on PDO electrical systems.
9.1.2 Contractors selected to carry out such LIVE LINE WASHING shall have proven LIVE LINE
WASHING procedures, adequately trained and experienced staff and all the necessary well
maintained equipment to carry out such work. (See ESOP 22 for guidance).
9.1.3 The AEP before initiating LIVE LINE WASHING shall ensure that the Contractor's Supervisor
has the necessary evidence and certificates on site to satisfy him that the requirements of Rule
9.1.2 are met. (See ESOP 22 for guidance).
9.1.4 The LIVE LINE WASHING and the safety of the team shall be the responsibility of the
Contractor's Supervisor, who shall ensure that the work is carried out correctly and is present
all the time the washing is taking place in accordance with the Rules in this Section 9.0.
The safety clearance necessary shall be agreed between the Contractor's Supervisor and the
AEP depending on the Contractor's methods, equipment and experience.
9.3.5 The LIVE LINE WASHING shall not commence in unfavourable conditions such as high winds
as this would affect the direction of the water jets.
9.3.6 Only one phase insulator shall be washed by the same jet.
9.3.7 No other LIVE conductor at a lesser distance than the one being washed shall be sprayed in
error.
9.3.8 LIVE LINE WASHING shall stop in the event of a local lightning risk.
9.3.9 The Contractor's supervisor shall be responsible for ensuring that the LIVE LINE WASHING
operator wears any protective clothing necessary for this work.
The AEP shall inform the CP when the LIVE LINE WASHING is complete.
10.1 GENERAL
10.1.1For use in certain situations, or at specific locations, there is sometimes the need of a person
who can carry out tasks that would normally be done by ELECTRICAL PERSONS as a small
part of their operational duties.
Entering a substation, which has no exposed HV conductors, to read meters or inspect
equipment, does not necessarily require the electrical experience of a person who has CEP
status.
10.1.2 The role of an AP is generally defined in Rule 2.1.4.8.
10.3 APPOINTMENT
Applications for personnel to become AP shall be dealt with in accordance with ESOP 3.
2.5.5.1(c) LADDERS -
1. ISSUE
TO……………………………………………………………………………………………
The following APPARATUS has been made safe in accordance with the PDO ELECTRICAL SAFETY RULES for the work
detailed on this ELECTRICAL PERMIT-TO-WORK to proceed:-
APPARATUS:…………………………………………………………………………………………………………………………
TREAT ALL OTHER APPARATUS AS LIVE
WORK TO BE COMPLETED:……………………………………………………………………
…………………………………………………………………………………………………………
POINTS AT WHICH THE APPARATUS HAS BEEN ISOLATED AND WHERE CAUTION NOTICES HAVE BEEN POSTED:
………………………………………………………………………………………………………………………………………...
.
DANGER NOTICES POSTED AT:……………………………………………………………………………………………….
CIRCUIT MAIN EARTHS APPLIED AT:………………………………………………………………………………………..
………………………………………………………………………………………………………...............................................
SET NUMBER OF ADDITIONAL EARTHS ISSUED:………………………………………….. ……………………………
KEY SAFES/SAFETY PADLOCK NOS: ……………………………………………………………………………………..
OTHER PRECAUTIONS:…………………………………………………………………………………………………………
SIGNED………………………………………………. TIME………………….. DATE………………………..
*SENIOR AUTHORISED/AUTHORISED ELECTRICAL PERSON
ISSUED WITH THE AGREEMENT OF………………………………………………………. (CONTROL PERSON)
2. RECEIPT
I accept responsibility for carrying out the work on the APPARATUS detailed on this ELECTRICAL PERMIT-TO-
WORK and no attempt will be made by me or persons under my charge to work on any other APPARATUS.
SIGNED………………………………………… TIME…………………………… DATE……………………………..
3. CLEARANCE
All persons under my charge have now been withdrawn and warned that it is no longer safe to work on the APPARATUS
detailed on this ELECTRICAL PERMIT-TO-WORK.
ALL ADDITIONAL EARTHS have been removed.
The Work is *COMPLETE/INCOMPLETE
SIGNED……………………………………. TIME…………………………… DATE…………………………………
COMPETENT ELECTRICAL PERSON
4 CANCELLATION
This ELECTRICAL PERMIT-TO-WORK is cancelled.
SIGNED……………………………………. TIME……………………………. DATE………………………………
*SENIOR AUTHORISED/AUTHORISED ELECTRICAL PERSON
CANCELLATION NOTIFIED TO …………………………………………………………………………………………….(CONTROL PERSON)
1. ISSUE
TO…………………………………………………………………………………………………………………….
The following APPARATUS has been made safe in accordance with the PDO ELECTRICAL SAFETY RULES for the
testing detailed on this SANCTION FOR TEST to proceed:-
APPARATUS:……………………………………………………………………………………………………………………
TESTING TO BE CARRIED OUT
…………………………………………………………………………………………………..
…………………………………
POINTS AT WHICH THE APPARATUS IS ISOLATED AND CAUTION NOTICES POSTED: …………………………..
……………………………………………………………………………………………………………………………………
DANGER NOTICES POSTED AT:…………………………………………………………………………………………
1. ISSUE
TO………………………………………………………………………………………………………………………
Permission is given to carry out the work described below which is in the vicinity of LIVE conductor:-
WORK LOCATION:………………………………………………………………………………………………….
WORK TO BE DONE:………………………………………………………………………………………………
NO OTHER WORK SHALL BE CARRIED OUT
LIVE APPARATUS:………………………………………………………………………………………………….
SPECIAL PRECAUTION TAKEN:……………………………………………………………………………………
PRECAUTIONS THAT MUST BE TAKEN WHEN WORK IS CARRIED OUT:………………………………….
…………………………………………………………………………………………………………………………….
SAFETY PRECAUTIONS FOR WORK ON LOW VOLTAGE APPARATUS:……………………………………….
……………………………………………………………………………………………………………………………….
2. RECEIPT
accept responsibility for carrying out the work in accordance with this LIMITATION-OF-ACCESS and no other
work will be done by me or the persons under my charge.
SIGNED…………………………….. TIME…………………………. DATE………………………………..
4 CANCELLATION
This LIMITATION OF ACCESS is now cancelled.
SIGNED……………………………… TIME……………………………….. DATE……………………………
No.
Petroleum Development Oman LLC
ELECTRICAL ISOLATION/DE-ISOLATION CERTIFICATE
EQUIPMENT FUNCTION:
……………………………………………………………………………………………..
SIGNED…………………………………REFERENCE INDICATOR…………………….. DATE………………….
CUSTODIAN
DATE………………….
5 I CONFIRM THAT THE DE-ISOLATION REQUESTED IN SECTION 4 HAS BEEN COMPLETED AND
CAUTION NOTICES & SAFETY PADLOCKS REMOVED.
EQUIPMENT FUNCTION:
…………………………………………………………………………………………………
SIGNED………………………………………REFERENCE INDICATOR………………………DATE…………..
CUSTODIAN
SIGNED……………………………………...REFERENCE INDICATOR…………….DATE……………………..
CUSTODIAN REPRESENTATIVE IN SITE
5 I CONFIRM THAT THE DE-ISOLATION REQUESTED IN SECTION 4 HAS BEEN COMPLETED AND
CAUTION NOTICES & SAFETY PADLOCKS REMOVED.
SIGNED………………………………………REFERENCE INDICATOR…………….DATE……………………..
*COMPETENT/AUTHORISED ELECTRICAL PERSON
Page 50 PR-1947 Electrical Safety Rules Printed 03/08/2010
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version 9.0
Petroleum Development Oman LLC
Effective:Oct,2010
*Delete as applicable
APPENDIX E3 – ELECTRICAL IMMOBILISATION / MOBILISATION CERTIFICATE
No.
Petroleum Development Oman LLC
ELECTRICAL IMMOBILISATION / MOBILISATION CERTIFICATE
APPOINTED PERSON
APPOINTED PERSON
4 Permission given to APPOINTED PERSON to return the equipment described in section 1 to normal service.
SIGNED……………………………..REFERENCE INDICATOR………………………….….DATE……………..
OPERATION STAFF
5 I confirm that the de-isolation requested in section 4 has been completed and CAUTION NOTICES and
SAFETY PADLOCKS removed.
SIGNED……………………………..REFERENCE INDICATOR……………………………...DATE……………..
APPOINTED PERSON
White Operation Staff
Blue Appointed staff
1.0 The Working and Access Clearances given in the following Tables of this Appendix are derived from the
SAFETY DISTANCES 'X' (Table 1) specified in Rule 5.6.1 with the addition of 'Application Factors' suitable for
the particular activity to be undertaken in the vicinity of exposed LIVE HIGH VOLTAGE conductors.
2.0 Appendix F1 specifies the Working and Access Clearances for work on overhead line poles when work is to be
undertaken with the conductors LIVE.
(See Rule 2.3.6.4(a) and Rule 2.5.1.4).
3.0 Appendix F2 specifies the Working and Access Clearances for work in substations containing exposed LIVE
HIGH VOLTAGE conductors.
(See Rule 2.3.6.4(a) and Rule 2.5.5.1).
4.0 Appendix F3 specifies the Working and Access Clearances that Contractors should be using when carrying out
HIGH VOLTAGE LIVE LINE WORK on PDO wood pole overhead lines. (See Rule 2.6.3[x]).
IMPORTANT NOTE
This Appendix has been produced and added to these Rules to give AUTHORISED ELECTRICAL PERSONS
operational guidance, when they are issuing ELECTRICAL SAFETY DOCUMENTS, in the types of situations
covered in appendices F1, F2 and F3.
The Working and Access Clearance figures given should be used as a minimum requirement, and should be
increased if practicable in all such situations.
The importance of the AUTHORISED ELECTRICAL PERSONS understanding the intention of Rule 2.3.6, and
in particular Rule 2.3.6.4, is essential when using the Clearances given in this Appendix F.
APPENDIX F1
X* X*
A B
0.3m 2.1m
WORKING
PLATFORM
LIMIT
LEVEL
MARKER
kV A(m) kV A(m)
33 1.1 33 2.9
66 1.3 66 3.1
132 1.7 132 3.5
APPENDIX F2
X*
B
2.1m
LIVE LIVE
PLATFORM
LEVEL LIMIT
(within workzone)
C C
1.5m 1.5m
X* X*
DEFINED WORKZONE
ELEVATION
NEAREST EXPOSED
LIVE HV CONDUCTOR
SAFETY DISTANCE = X*
APPLICATION FACTOR (VERT.) = 2.1m
APPLICATION FACTOR (HORZ.) = 1.5m C
B = X* + 2.1m & C = X* + 1.5m
PERMISSIBLE
kV B(m) C(m)
LIMITS OF
33 2.9 2.3 C C
WORKZONE
66 3.1 2.5
132 3.5 2.9
PLAN
NOTE: for * see Rule 5.6.1
APPENDIX F3
X* X*
A B
0.3m 2.1m
WORKING
kV A(m) PLATFORM kV B(m)
LIMIT
33 1.1 LEVEL 33 2.9
MARKER
66 1.3 66 3.1
132 1.7 132 3.5
X* HORZ. LIMIT
0.3m
A
B
SAFETY DISTANCE = X*
APPLICATION FACTOR (HORZ.) = 0.3m VERT. LIMIT
kV A(m) B(m)
33 1.1 2.9
66 1.3 3.1
132 1.7 3.5 NOTE: for * see Rule 5.6.1
PR USER-COMMENT FORM
PR User-Comment Form
If you find something that is incorrect, ambiguous or could be better in a PR, write your
comments and suggestions on this form. Send the form to the Document Control Section (DCS).
They make a record of your comment and send the form to the correct CFDH. The form has
spaces for your personal details. This lets DCS or the CFDH ask you about your comments and
Comments:
Suggestions:
Comments: