Saic A 2003
Saic A 2003
Saic A 2003
00 30-Apr-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Test Package Preparation
(Content, Format & Database) SAIC-A-2003 3-Jul-18 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
NOTES: 1) SAEP-1160 Section 8 details Minimum Test Package Requirements for Projects (Plant Piping, Pipelines, Equipment). Usage of
SAEP-1160 is mandatory when referenced by Sch Q for contracts with December 2005 cut-off dates and later.
2) Pressure Test Packages are (an integral part of) Test Procedures (See SAES-A-004 definition). Both Contract Sch Q & SAEP-1160 require a
Pressure Testing Procedure, along with other procedures & a Test Package for effective/safe pressure testing work control.
3) Submit a single multiple document package as follows (30 days before the start of work per Sch Q) for Company approval:
a) Three mandatory Pressure Test Procedures (as applicable) can be combined into one (Hydrotest, Pneumatic Test, Bubble
Leak Test). b) Sample Test package with applicable QC records, Forms (per Attachment 1 of the Checklist and as listed
below). c) A Re-instatement Procedure and Checklist (Utilize SAIC-A-2006 & SATR-A-2011 or QC
forms meeting SATR minimum content). d) Pressure Test System Matrix (Modified Piping Design Line Index) per
checklist as listed below. e) Pressure Test Package Database - Sample Status
Report (per checklist as listed below).
4) Sample Test Package System ID & Status Report (Database). This is mandatory on large projects. Procedures shall detail Organizational Control
responsibilities for test packages & have provisions for "lost packages" & other system controls for test packages from package design through system
completion (MCC) and the QC certification process including turnover of records.
5) Pressure Test Matrix is a modified line list showing all systems and proposed pressure test design for SA approval. Reduce review time significantly
& improve efficiency by performing a close review of Pressure Test Matrix & associated system information early on in major projects. "Critical Path" to
MCC is nearly always Test Package Completion. Delays are often due to inefficiency, poor organization and planning, a lack of dedicated manpower
solely for Pressure Test Package development, coordination, clearance, & inadequate test planning based on a system approach.
6) Test Package Format (Organization of Sections) shall be in the most efficient manner possible to eliminate package size and yet contain all
applicable/important test information and documents needed for safe and correct system pressure testing. Copies of any procedures (Pressure Test,
Leak Test, Reinstatement) shall only be provided with test packages on review for initial approval by Company. Procedure copies (Pressure Testing,
GI-2.102, etc) shall be kept at test sites (test manifolds) with associated Safe Work Permits. Combining QC forms is encouraged. SATR use is required
or alternatively, QC test reports shall contain SATR elements. Increase efficiency & eliminate waste.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Test Package Database & Format (Minimum Requirements)
A
ONTRACTOR
PLANT NO.
TRAVEL TIME
MCO USE ONLY
WORK PERMIT REQUIRED?
quipment). Usage of
EP-1160 require a
Organizational Control
e design through system
RE-INSP DATE
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
For each pressure test, the Contractor shall submit a Pressure Test
Package to Saudi Aramco containing the following:
• Reference the “Approved” Pressure Test Procedure
• Pressure Test Diagram which shall include the limits of piping (including
test manifold) and equipment included in each pressure test, high points
(vents), low points (drains), locations of pressure gauges, test pressures,
test temperature, test fluid and position of in-line valve.
• Relief valve capacity, testing, and installation
• Pressure gages and recorders calibration records
• COMPANY Safety Instruction Sheet (for critical piping and pressure
vessels) and Pressure Test Report Form
• Copies of P&ID and isometric drawings of the piping system to be
pressure tested
• Weld map and Weld Summary Sheet for the system to be pressure
tested, containing Line Information, Weld Joints, Welder, WPS used, NDT SAEP-1160,
A5 Results. Specific contents shall be agreed upon by PID. Section 8
• Pre-pressure test check List
• Re-instatement procedure and Check List
• Flange Joint and Gasket Verification inspection and bolt torquing reports
for permanent installations of flange joints.
• Identification of pressure testing SPC from contractor
• Lay-up method to be applied
• Verification of chemical dosing calculations when applicable
• Test manifold hydro test verification
• Internal cleaning requirements and method of cleaning
• Punch list (Remaining works)
• Certificate of test medium/water
Detailed Weld Map (Isos for Plant Piping, pipelines use isos or sketch with SAEP-1160,
C2
detailed notes and legend as approved by Company) Section 8
SAEP-1160,
C6 Flange Joint Assembly Inspection Report (SATR-L-2001).
Section 8
SAEP-1160,
C7 Internal Cleanliness / Flushing Report (SATR-A-2008)
Section 8
SAEP-1160,
C8 Verification of System Readiness for Testing (SAIC-A-2004)
Section 8
SAEP-1160,
C9 Pressure Test Report Form (SATR-A-2001)
Section 8
SAEP-1160,
C11 Reinstatement Procedure QC form & Instructions.
Section 8
E System Lay-up
SAEP-1160,
E1 System Lay-Up Certificate Form (SATR-A-2009)
Section 8
REMARKS:
REFERENCE DOCUMENTS:
1. SAEP-1160 - Tracking and Reporting of Welding, NDT and Pressure Testing for Capital Projects. (2 August 2016)
ONTRACTOR
RE-INSP DATE
Work Verified
Work Verified
Test Pack
Preparation Engineering Contractor QC
Pre-Test
Punch (NOTE: Use form SATR-A-2007)
Construction Contractor QC
Listing
Clear 'A'
Items Construction Contractor QC
S. Aramco
Pre-Test
Punch
SAPMT PID Proponent
Listing (By Request)
Clear
S. Aramco
Construction Contractor QC SAPMT PID
'A' Items
Flushing &
Cleanliness Construction Contractor QC SAPMT PID Proponent
(By
Request)
Pressure
Testing Construction Contractor QC SAPMT PID Proponent
Reinstate
System
S. Aramco
Final Insp for
MCC SAPMT PID Proponent
nt)
Proponent
(By
Request)
Proponent