Saudi Aramco Inspection Checklist: Post Weld Heat Treatment (PWHT) For On-Plot Piping SAIC-W-2004 15-Dec-09 Weld
Saudi Aramco Inspection Checklist: Post Weld Heat Treatment (PWHT) For On-Plot Piping SAIC-W-2004 15-Dec-09 Weld
Saudi Aramco Inspection Checklist: Post Weld Heat Treatment (PWHT) For On-Plot Piping SAIC-W-2004 15-Dec-09 Weld
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Company has approved the Project Specification for Welding and the
PWHT Specification (all details, notes, reqmts) that are based on ASME
Code & Saudi Aramco Stds within workscope. SAES-L-310,
PWHT Specifications by Line Class are Section 7
A1
reviewed & approved by SA, this includes Owner's Authorized Inspector Last
(PID). Follow checklist & the applicable SATIPs. Requirements are Bullet
clear. See
Attachment 1 for PWHT requirements & general note 1.
Page 1 of 19
Table shall include the following info. for each joint or component:
a) location
b) drawing number
c) diameter
d) wall thickness
SAES-W-011,
A5 e) material
Para. 13.2
f) heating rate
g) cooling rate
h) soak temperature
i) soak time
Verify that code and SA requirements have been met.
Page 2 of 19
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08
Post Weld Heat Treatment (PWHT) for On-Plot Piping SAIC-W-2004 15-Dec-09 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Carbon & low alloy steel butt welds requiring PWHT for Process
Conditions & Services are as listed in Attachment 1.
A) All caustic soda (NaOH) solutions, incl. conditions
where caustic carryover may occur (e.g. downstream of caustic injection
points).
B) All monoethanolamine (MEA) solutions (all temperatures).
C) All diglycol amine (DGA) solutions above 138°C design temp.
D) Rich amino diisoprop (ADIP) solutions above 90°C design temp.
SAES-W-011,
A6 E) All lean ADIP solutions above 60°C design temperature.
Para. 13.3
F) Boiler Deaerator serv (ambient temp vacuum deaerator = exempt)
G) Hydrogen service for P-No. 3, 4, and 5A/B/C base materials.
H) All diethanolamine (DEA) solutions.
These reqmts also apply to external welds to attach non-
pressure
containing component to piping (e.g., reinforcement pad or sleeve
attached to the pipe) and to seal welds. Seal welds on threaded valves
may be exempt if PWHT will damage valve internals.
The PWHT heating and cooling rates > 316°C shall not exceed 222°C/hr SAES-W-011,
A8
÷ weld thickness in inches, but in no case > 222°C/hr. Para. 13.4
All temperatures within the heated zone for furnace or localized PWHT SAES-W-011,
A12
shall exceed the specified minimum holding temperature. Para. 13.10
The actual temperature range for the soak period, as recorded by TC's, SAES-W-011,
A13
shall not have a spread of more than 40°C. Para. 13.10
PWHT shall be carried out using one or more of the following types:
a) Permanent or semi-permanent furnaces (gas/oil/electric heaters) SAES-W-011,
A15
b) Electrical resistance heaters. Para. 13.12
c) Induction heaters.
B Thermocouple Requirements
Additional TCs are required if multiple heat control zones are used, in SAES-W-011,
B2
which a control zone is not monitored by any of the primary T/Cs. Para. 13.13
All charts shall be marked with the date and sufficient information to SAES-W-011,
B4
uniquely identify the joint/component being heat treated. Para. 13.14
Page 3 of 19
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08
Post Weld Heat Treatment (PWHT) for On-Plot Piping SAIC-W-2004 15-Dec-09 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-W-011,
Calibration frequency may be extended to 6* months with PID approval
Para. 13.15 &
B7 if documented calibration checks for recorder demonstrate acceptable
Sch Q,
accuracy for a suitable period. *Sch Q M&TE limit.
M&TE
Only Type K (Chromel-Alumel) or Type J (iron-Constantan) TCs are
permitted. All extension, compensating, and jumper cables in the SAES-W-011,
B8
measurement or control circuits shall be the specified TC wire or Para. 13.16.1
matching extension wire, i.e., KX or JX, as appropriate.
In addition, the PWHT chart should be marked, prior to PWHT, with SAES-W-011,
C3
identification number of the weld(s). Matches Database Weld ID Para. 13.17
REMARKS:
Page 4 of 19
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08
Post Weld Heat Treatment (PWHT) for On-Plot Piping SAIC-W-2004 15-Dec-09 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
NOTES: 1. Code exemptions for PWHT for P-No. 4 & P-No. 5 materials are not allowed at Saudi Aramco. PWHT all P-No. 4 & P-No. 5 mat'l
welds & pressure boundary attachments when Sour Service exists or nominal chrome content is above 1.5%. (SAES-W-011, Para. 13.8)
2. Condition of PWHT Insulation blankets shall be monitored for deterioration & burn damage. Deteriorated blankets and those without wire
mesh coverings release Ceramic fibers into the immediate work area and are a serious health hazard (Safety & Quality Concern).
3. Heat damage & oxidation shall not be visible after PWHT operations.
ATTACHMENTS:
Attachment 1 - Requirements for Heat Treatment (ASME B31.3, Table 331.1.1) & SAES-W-011
Attachment 2 - SAEP-1160 DATABASE, PROCESS CONTROL TRACKING (By Weld)
Attachment 3 - SATR-W-2004 - SAMPLE PWHT TABLE (PROCESS CONTROL TRACKING BY WELD)
REFERENCE DOCUMENTS: 1. SAES-W-011, Welding Requirements for On-Plot Piping, (30 March 2005)
2. ASME B31.3, Process Piping (Latest Edition)
Page 5 of 19
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Post Weld Heat Treatment (PWHT) for On-Plot Piping SAIC-W-2004 15-Dec-09 WELD-
Attachment 1 - Requirements for Heat Treatment (ASME B31.3, Table 331.1.1) & SAES-W-011, Section 13
Attachment 2 - Requirements for Heat Treatment (ASME B31.3, Table 331.1.1) & SAES-W-011
Attachment 2 - Requirements for Heat Treatment (ASME B31.3, Table 331.1.1) & SAES-W-011
Attachment 2 - Requirements for Heat Treatment (ASME B31.3, Table 331.1.1) & SAES-W-011
Attachment 2 - Requirements for Heat Treatment (ASME B31.3, Table 331.1.1) & SAES-W-011
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Post Weld Heat Treatment (PWHT) for On-Plot Piping SAIC-W-2004 15-Dec-09 WELD-
Attachment 3 - SATR-W-2004 R3- SAMPLE PWHT TABLE (PROCESS CONTROL TRACKING BY WELD)
Instructions for PWHT Table (Line List) Use: 1. Perform Heat Treatment in conjunction with SAIC-W-2012 and
SAIC-W-2014 for Brinnell Hardness Testing and the applicable NDE SATIP & Project NDE Specification.
2. Localized PWHT = 100% Brinnell Hardness Testing. Furnace Batch PWHT = 10% Brinnell Hardness Testing.
3. PWHT Crew & QC Responsible utilize this Work Sheet to perform field work under close supervison/Witness.
4. Results are entered into the SAEP-1160 Database for Welds on Projects. Verify Weld ID numbers carefully.
5. Such Databases are not needed when 500 welds or less are in the Project Work Scope (SAEP-1160 Reqmt).
6. PWHT shall be performed per approved Project Welding & PWHT Specification including all notes.
7. Those responsible for work and data entry have been approved by Saudi Aramco to perform work on IK Projects.
8. Rework shall require a new Weld ID Number (suffix added = R 1, etc) per SAEp-1160 Requirements.