Saudi Aramco Typical Inspection Plan
Saudi Aramco Typical Inspection Plan
Saudi Aramco Typical Inspection Plan
00 31-May-18
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE: Civil & Mechanical
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
2.1 Structural Steel Shapes and Plates SAIC-M-2003 SAIC-M-2003 H W SA shall be notified for the first batch of deliveries.
2.2 Bolts, Nuts and Washers SAIC-M-2021 SAIC-M-2021 H W SA shall be notified for the first batch of deliveries.
2.3 Fabricated Steel Structures SAIC-M-2004 SAIC-M-2004 H W SA shall be notified for the first batch of deliveries.
3.0 INSTALLATION
Repair/Correction of Errors of See SAIC-M-2012 for welding related repairs & any
3.5 SAIC-M-2008 SAIC-M-2008 I W
Structural Alignment (No welding) Required NDE resulting (Correction of errors)
Pre-Installation Procedure Verification
Testing of Turn-of-Nut Method
3.6 SATR-M-2002 SATR-M-2002 H H
ASTM A325 or ASTM A490
Bolts
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE: Civil & Mechanical
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
3.15 Painting/Coating and touch up See Remarks See Remarks Refer to applicable SATIP-H series
4.0 PRE-COMMISSIONING
GENERAL NOTES
NOTICE (SAEP-1160- July 10,2011 , Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or continual basis, e.g., fit-up, in-
process, and final inspection. Applicable weld numbers must be entered in Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-
tap welding, and temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. Structural steel Repairs (by Welding) are a special activity. 9.2.3 NDT
subcontractors must complete NDT Checklists on a daily basis per above but not as an IR with the exception of the start of NDT activities. Follow NDE Process Control procedure.
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
3 Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, inspection or test shall be performed as scheduled if QA/QC org rep is not present.
4 Hold: QA/QC org shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE: Civil & Mechanical
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
###
###