Automated MPD Riser System: Expedites Installation On Offshore Rigs With An Integrated, Compact, and Smart Design
Automated MPD Riser System: Expedites Installation On Offshore Rigs With An Integrated, Compact, and Smart Design
Automated MPD Riser System: Expedites Installation On Offshore Rigs With An Integrated, Compact, and Smart Design
Applications
• Managed pressure drilling (MPD)
• Managed pressure cementing
• Pressurized mud-cap drilling
• Underbalanced drilling
• Horizontal and vertical offshore wells
Features and Benefits
• Connection hub integrates subsea control umbilical and flowlines into
one easy-to-connect component.
• Robotic arm attaches the connection hub to the hands-free flow spool
in less than 20 minutes. By eliminating the need for manual work in the
moonpool area, the arm enhances safety and accelerates rig-up and
rig-down time by 80%.
• Robotic arm compensates up to 20° to align with the riser, which
enables installation in harsh conditions. Then the arm retracts to its
initial position for safe riser running.
• Smart rotating control device (RCD) technology enables predictive
maintenance and early leak detection.
• Annular isolation device (AID) enables openhole shut-off and offers
multiple pressure equalization options.
• Hands-free flow-spool sensors monitor annular pressure and
temperature.
• Subsea surveillance system enables visual confirmation of successful
connection hub installation. The system also enables permanent
monitoring of components during MPD operations, which reduces the
need for underwater inspection using a remotely operated vehicle
(ROV).
• Single control umbilical provides high-performance fiber-optic cables
for fast and reliable data transmission.
• Compact riser design integrates smart RCD, hands-free flow spool, AID,
and all required crossovers, with no need for further assembly at the
offshore rigsite.
• Reduced length, width, and weight reduces logistical complexities,
associated costs, and installation time. The Weatherford automated MPD riser system uses
a robotic arm that enables installation in less than
• Streamlined body facilitates shipping to the rigsite, rig handling, and 20 minutes for 80% faster rig up and down time.
deploying through the rotary table.
• Dual-certified and approved design—according to ABS CDS* and
DNV GL OS-E101**— meets the majority of deepwater rig standards.
The MPD riser system also features a robotic arm that connects the
control umbilical and flowlines in a single operation. With this level of
automation, the system provides safe, reliable, and efficient operations
every time. In regard to efficiency, installing the connection hub to the
riser takes less than 20 minutes for 80% faster rig up and down time.
The compact riser system arrives at the rigsite ready for deployment.
The operator initiates installation from a control system in the
moonpool. A line of sight is required to install the connection hub. The connection hub enables installing the single
control umbilical and flowlines in the hands-free flow
Specifications spool all at once.
Riser System
Length 25.7 ft (7.8 m)
Length with crossovers <48 ft (14.6 m)
Maximum OD 57 in. (1,448 mm)
Weight 65,000 lb (29,484 kg)
Weight with crossovers 88,000 lb (39,916 kg)
Bleed line connection Integral
Mud line return connections 2
Control line umbilical connections 1
Moonpool connections 1 remote pull-in
Field serviceable packer Yes
AID
Length 6.83 ft (2.1 m)
Maximum OD 57.0 in. (1.4 m)
Assembly weight 25,000 lb (11,340 kg)
Maximum tension rating 4,000,000 lbf (1,814,369 kgf)
Minimum throughbore ID 18.75 in. (476 mm)
Top flange Modified API flange
API 6A Type 6BX
Bottom flange
18.75 in., 10,000 psi (68.9 MPa)
Static pressure rating 2,000 psi (13.8 MPa)
Minimum hydraulic operating pressure 1,850 psi (12.8 MPa)
Temperature range 40 to 150°F (4 to 66°C)*
Complete seal off Yes
Third party certification ABS and DNV GL
Design codes API Spec 6A, 16A, 16F, 16C, NACE
Field serviceable Yes
The AID seals to complete shut-off with or without
Auxiliary line integral flow path Yes drillpipe in the riser.
Sensor ports 2
*Verification testing performed per API 16A 4th edition, PR1.
Connection Hub
Length 54 in. (1,400 mm)
Width 44 in. (1,100 mm)
Height 59 in. (1,500 mm)
Assembly weight 3,000 lb (1,361 kg)
Maximum working pressure, hydraulic 3,000 psi (20.7 MPa)
Maximum working pressure, flowlines 2,000 psi (13.8 MPa)
Four 3/4 in. (19 mm)
Hydraulic connections Four 1/2 in. (12.7 mm)
Twelve 1/2 in. (12.7 mm)
Flowline connections Two 5-1/8 in. (130 mm)
Four hydra electric socket
Electrical connections
connectors
Umbilical
Nominal OD 5.93 in. (151 mm)
Hydraulic lines quantity, 1/2 in. 4
Hydraulic lines quantity, 1/4 in. 16
Hydraulic lines quantity, 1 in. 3
Twisted pairs quantity 24
Fiber-optic data cable 2
Reeler Assembly
Length 196 in. (4,969 mm)
Width 103 in. (2,619 mm)
Height 160 in. (4,054 mm)
Weight 1,543 lb (700 kg)
Transport weight 24,250 lb (11,000 kg) The reeler works in conjunction with a hydraulic sheave to
deploy the umbilical.
Capacity 500 ft (152 m)
Pull force 2,450 lb (1,152 kg)