Modular Plant Unit Project: TAIF-NK HRCC Sulphur Production Unit
Modular Plant Unit Project: TAIF-NK HRCC Sulphur Production Unit
Modular Plant Unit Project: TAIF-NK HRCC Sulphur Production Unit
SRU 2A
DESCRIPTION LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
SRU-2A-G1 21.000 5.330 6.500 727.55 1 SKID 52.16 3 JULY 2015
SRU-2A-G2 15.650 6.000 3.740 351.19 1 SKID 18.59 3 JULY 2015
SRU-2A-1st-1 21.000 5.330 3.240 362.65 1 SKID 22.16 3 JULY 2015
SRU-2A-1st-2 15.650 6.000 6.000 563.40 1 SKID 57.45 3 JULY 2015
SRU-2A-2nd-1 21.000 5.330 6.200 693.97 1 SKID 69.31 3 JULY 2015
SRU-2A-2nd-2 15.650 6.000 3.740 351.19 1 SKID 53.12 3 JULY 2015
3,049.94 6 272.79
SRU 1B
DESCRIPTION LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
SRU-1B-G1 30.490 7.500 6.500 1,486.39 1 SKID 45.28 3 JULY 2015
SRU-1B-1st 30.490 7.500 6.500 1,486.39 1 SKID 45.28 3 JULY 2015
2,972.78 2 90.56
SRU 2B
DESCRIPTION LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
SRU-2B-G1 30.490 7.500 6.500 1,486.39 1 SKID 45.28 3 JULY 2015
SRU-2B-1st 30.490 7.500 6.500 1,486.39 1 SKID 45.28 3 JULY 2015
2,972.78 2 90.56
ARU
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
ARU-G1 15.800 7.000 6.500 718.90 1 SKID 27.41 3 JULY 2015
ARU-G2 15.800 7.000 6.500 718.90 1 SKID 48.55 3 JULY 2015
ARU-G3 16.825 5.250 6.500 574.15 1 SKID 22.20 3 JULY 2015
ARU-G4 16.825 5.000 6.500 546.81 1 SKID 16.66 3 JULY 2015
ARU-G5 16.825 5.650 6.500 617.90 1 SKID 39.04 3 JULY 2015
ARU-1st-1 15.800 6.274 6.500 644.34 1 SKID 19.63 3 JULY 2015
ARU-1st-2 15.800 6.000 6.500 616.20 1 SKID 22.27 3 JULY 2015
ARU-1st-3 15.800 6.300 6.500 647.01 1 SKID 42.52 3 JULY 2015
ARU-1st-4 15.800 6.000 6.500 616.20 1 SKID 59.74 3 JULY 2015
ARU-1st-5 15.800 6.239 6.500 640.75 1 SKID 22.39 3 JULY 2015
ARU-2nd-1 15.848 6.574 6.500 677.20 1 SKID 20.63 3 JULY 2015
ARU-2nd-2 15.848 6.000 6.500 618.07 1 SKID 105.83 3 JULY 2015
7,636.43 12 446.86
UTILITIES A
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
3
meter (m) meter (m) meter (m) m pcs metric ton (MT)
UTL-A-1 14.800 7.007 6.500 674.07 1 SKID 21.58 3 JULY 2015
UTL-A-2 14.800 7.450 6.500 716.69 1 SKID 24.37 3 JULY 2015
UTL-A-3 14.800 7.450 6.500 716.69 1 SKID 21.83 3 JULY 2015
UTL-A-4 14.800 7.000 6.500 673.40 1 SKID 20.51 3 JULY 2015
UTL-A-5 14.800 7.000 6.500 673.40 1 SKID 20.51 3 JULY 2015
UTL-A-6 14.800 7.000 6.500 673.40 1 SKID 20.51 3 JULY 2015
UTL-A-7 14.800 7.000 6.500 673.40 1 SKID 20.51 3 JULY 2015
UTL-A-8 14.800 7.007 6.500 674.07 1 SKID 20.53 3 JULY 2015
4,801.05 8 149.84
UTILITIES B
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
UTL-B-G1 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
UTL-B-G2 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
UTL-B-G3 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
UTL-B-G4 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
UTL-B-1st-1 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
UTL-B-1st-2 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
UTL-B-1st-3 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
UTL-B-1st-4 28.450 7.400 6.500 1,368.45 1 SKID 41.68 3 JULY 2015
10,947.56 8 291.79
Page 1
TGTU-A
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
3
meter (m) meter (m) meter (m) m pcs metric ton (MT)
TGTU A-1st-1 9.200 5.101 6.500 305.04 1 SKID 11.39 3 JULY 2015
TGTU A-1st-2 9.200 5.101 6.500 305.04 1 SKID 9.29 3 JULY 2015
TGTU A-1st-3 15.000 7.400 6.500 721.50 1 SKID 48.11 3 JULY 2015
TGTU A-1st-4 15.000 5.000 6.500 487.50 1 SKID 16.83 3 JULY 2015
TGTU A-1st-5 15.000 5.000 6.500 487.50 1 SKID 14.85 3 JULY 2015
TGTU A-1st-6 15.000 5.000 6.500 487.50 1 SKID 16.83 3 JULY 2015
TGTU A-2nd-1 10.200 7.158 6.500 474.58 1 SKID 28.89 3 JULY 2015
TGTU A-2nd-2 15.000 7.400 6.500 721.50 1 SKID 44.79 3 JULY 2015
TGTU A-2nd-3 15.000 6.250 6.500 609.38 1 SKID 18.56 3 JULY 2015
TGTU A-2nd-4 15.000 6.250 6.500 609.38 1 SKID 18.56 3 JULY 2015
TGTU A-3nd-1 10.200 7.158 6.500 474.58 1 SKID 12.05 3 JULY 2015
TGTU A-3nd-2 15.000 7.400 6.500 721.50 1 SKID 18.32 3 JULY 2015
TGTU A-4th 15.000 7.400 6.500 721.50 1 SKID 18.32 3 JULY 2015
7,126.48 13 276.79
TGTU-B
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
TGTU B-1st-1 9.200 5.101 6.500 305.04 1 SKID 11.39 3 JULY 2015
TGTU B-1st-2 9.200 5.101 6.500 305.04 1 SKID 9.29 3 JULY 2015
TGTU B-1st-3 15.000 7.400 6.500 721.50 1 SKID 48.11 3 JULY 2015
TGTU B-1st-4 15.000 5.000 6.500 487.50 1 SKID 16.83 3 JULY 2015
TGTU B-1st-5 15.000 5.000 6.500 487.50 1 SKID 14.85 3 JULY 2015
TGTU B-1st-6 15.000 5.000 6.500 487.50 1 SKID 16.83 3 JULY 2015
TGTU B-2nd-1 10.200 7.158 6.500 474.58 1 SKID 28.89 3 JULY 2015
TGTU B-2nd-2 15.000 7.400 6.500 721.50 1 SKID 44.79 3 JULY 2015
TGTU B-2nd-3 15.000 6.250 6.500 609.38 1 SKID 18.56 3 JULY 2015
TGTU B-2nd-4 15.000 6.250 6.500 609.38 1 SKID 18.56 3 JULY 2015
TGTU B-3nd-1 10.200 7.158 6.500 474.58 1 SKID 12.05 3 JULY 2015
TGTU B-3nd-2 15.000 7.400 6.500 721.50 1 SKID 18.32 3 JULY 2015
TGTU B-4th 15.000 7.400 6.500 721.50 1 SKID 18.32 3 JULY 2015
7,126.48 13 276.79
SWS
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
SWS-G1 15.900 7.000 6.500 723.45 1 SKID 22.04 3 JULY 2015
SWS-G2 15.900 6.500 6.500 671.78 1 SKID 28.93 3 JULY 2015
SWS-G3 15.900 5.372 6.500 555.20 1 SKID 21.81 3 JULY 2015
SWS-G4 15.900 6.000 6.500 620.10 1 SKID 22.95 3 JULY 2015
SWS-G5 12.400 6.000 6.500 483.60 1 SKID 20.53 3 JULY 2015
SWS-1st-1 15.900 7.000 6.500 723.45 1 SKID 28.83 3 JULY 2015
SWS-1st-2 23.813 5.574 6.500 862.77 1 SKID 26.28 3 JULY 2015
SWS-1st-3 23.813 5.000 6.500 773.92 1 SKID 23.57 3 JULY 2015
SWS-1st-4 23.813 5.274 6.500 816.33 1 SKID 24.87 3 JULY 2015
SWS-2nd 15.728 6.450 6.500 659.40 1 SKID 42.91 3 JULY 2015
6,889.99 10 262.73
LOOSE STRUCTURE
PIPERACK 1
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
MODULE 1 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 2 12.42 7.78 4.00 386.51 1 MODULE 8.22 28 FEBRUARY 2015
MODULE 3 10.48 7.76 5.18 421.26 1 MODULE 16.40 28 FEBRUARY 2015
MODULE 4 10.48 7.76 3.85 313.10 1 MODULE 8.90 28 FEBRUARY 2015
MODULE 5 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 6 12.42 7.78 4.00 386.51 1 MODULE 8.22 28 FEBRUARY 2015
MODULE 7 11.73 7.76 5.18 471.43 1 MODULE 19.71 28 FEBRUARY 2015
MODULE 8 11.73 7.76 3.85 350.39 1 MODULE 11.00 28 FEBRUARY 2015
MODULE 9 11.55 7.78 5.16 463.67 1 MODULE 22.20 28 FEBRUARY 2015
MODULE 10 11.55 7.78 4.00 359.44 1 MODULE 12.20 28 FEBRUARY 2015
MODULE 11 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 12 12.42 7.78 4.00 386.51 1 MODULE 8.22 28 FEBRUARY 2015
MODULE 13 6.73 7.76 5.18 270.44 1 MODULE 11.73 28 FEBRUARY 2015
MODULE 14 6.73 7.76 3.85 201.01 1 MODULE 6.40 28 FEBRUARY 2015
MODULE 15 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 16 12.42 7.78 4.00 386.51 1 MODULE 8.23 28 FEBRUARY 2015
MODULE 17 10.65 7.78 5.16 427.54 1 MODULE 19.11 28 FEBRUARY 2015
MODULE 18 10.65 7.78 4.00 331.43 1 MODULE 10.51 28 FEBRUARY 2015
MODULE 19 9.51 7.76 5.18 382.19 1 MODULE 15.90 28 FEBRUARY 2015
MODULE 20 9.51 7.76 3.85 284.06 1 MODULE 8.60 28 FEBRUARY 2015
MODULE 21 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 22 12.42 7.78 4.00 386.51 1 MODULE 8.22 28 FEBRUARY 2015
MODULE 23 11.73 7.76 5.18 471.43 1 MODULE 19.71 28 FEBRUARY 2015
MODULE 24 11.73 7.76 3.85 350.39 1 MODULE 10.70 28 FEBRUARY 2015
MODULE 25 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 26 12.42 7.78 4.00 386.51 1 MODULE 8.22 28 FEBRUARY 2015
MODULE 27 11.73 7.76 5.18 471.43 1 MODULE 19.70 28 FEBRUARY 2015
MODULE 28 11.73 7.76 3.85 350.39 1 MODULE 10.69 28 FEBRUARY 2015
MODULE 29 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 30 12.42 7.78 4.00 386.51 1 MODULE 8.22 28 FEBRUARY 2015
MODULE 31 11.05 7.76 5.18 444.09 1 MODULE 22.00 28 FEBRUARY 2015
MODULE 32 11.05 7.76 3.85 330.07 1 MODULE 12.00 28 FEBRUARY 2015
MODULE 33 12.42 7.78 5.16 498.60 1 MODULE 15.10 28 FEBRUARY 2015
MODULE 34 12.42 7.78 4.00 386.51 1 MODULE 8.23 28 FEBRUARY 2015
13,774.62 34 532.85
Page 2
PIPERACK 2
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
3
meter (m) meter (m) meter (m) m pcs metric ton (MT)
MODULE 1 12.120 6.230 1.040 78.53 1 MODULE 9.20 28 FEBRUARY 2015
MODULE 2 12.120 6.230 1.040 78.53 1 MODULE 9.50 28 FEBRUARY 2015
MODULE 3 12.120 6.230 1.040 78.53 1 MODULE 9.20 28 FEBRUARY 2015
MODULE 4 12.120 6.230 1.040 78.53 1 MODULE 9.20 28 FEBRUARY 2015
MODULE 5 12.120 6.230 1.040 78.53 1 MODULE 9.50 28 FEBRUARY 2015
MODULE 6 12.120 6.230 1.040 78.53 1 MODULE 9.20 28 FEBRUARY 2015
471.17 6 66.96
PIPERACK 3
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
MODULE 1 12.120 6.230 1.040 78.53 1 MODULE 9.20 28 FEBRUARY 2015
MODULE 2 12.120 6.230 1.040 78.53 1 MODULE 8.50 28 FEBRUARY 2015
MODULE 3 12.120 6.230 1.040 78.53 1 MODULE 8.50 28 FEBRUARY 2015
MODULE 4 12.120 6.230 1.040 78.53 1 MODULE 9.20 28 FEBRUARY 2015
314.11 4 42.48
PIPERACK 4
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
MODULE 1 12.120 6.230 0.900 67.96 1 MODULE 8.60 28 FEBRUARY 2015
MODULE 2 12.120 6.230 0.900 67.96 1 MODULE 8.70 28 FEBRUARY 2015
MODULE 3 12.120 6.230 0.900 67.96 1 MODULE 8.10 28 FEBRUARY 2015
MODULE 4 12.120 6.230 0.900 67.96 1 MODULE 8.30 28 FEBRUARY 2015
MODULE 5 12.120 6.230 0.900 67.96 1 MODULE 9.10 28 FEBRUARY 2015
MODULE 6 12.120 6.230 0.900 67.96 1 MODULE 10.10 28 FEBRUARY 2015
407.74 6 63.48
PIPERACK 5
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
3
meter (m) meter (m) meter (m) m pcs metric ton (MT)
MODULE 1 12.120 4.236 3.060 157.10 1 MODULE 5.00 28 FEBRUARY 2015
MODULE 2 8.000 5.230 1.460 61.09 1 MODULE 4.00 28 FEBRUARY 2015
MODULE 3 8.000 5.130 1.460 59.92 1 MODULE 4.00 28 FEBRUARY 2015
MODULE 4 12.120 4.230 3.060 156.88 1 MODULE 5.00 28 FEBRUARY 2015
MODULE 5 7.000 6.230 0.760 33.14 1 MODULE 4.90 28 FEBRUARY 2015
MODULE 6 12.120 6.230 6.560 495.33 1 MODULE 12.30 28 FEBRUARY 2015
MODULE 7 12.120 6.230 6.560 495.33 1 MODULE 12.20 28 FEBRUARY 2015
MODULE 8 12.120 6.230 6.560 495.33 1 MODULE 11.70 28 FEBRUARY 2015
MODULE 9 11.130 6.230 6.560 454.87 1 MODULE 12.00 28 FEBRUARY 2015
2,408.99 9 85.32
SHIP LOOSE
LENGTH WIDTH HEIGHT VOLUME QTY TYPE WEIGHT DELIVERY DATE FROM KPS
meter (m) meter (m) meter (m) m3 pcs metric ton (MT)
SWS Blowdown Pump H-424 3.000 1.000 1.000 3.000 1 CONTAINER 1.15 3 JULY 2015
Amine Sump Pump H-414 4.000 1.000 1.000 4.000 1 CONTAINER 1.44 3 JULY 2015
Condensate Transfer Pumps H-461 A/B 2.500 1.000 0.850 4.250 2 CONTAINER 3.53 3 JULY 2015
HP Boiler FW Pumps H-462 A/B/C TBC 3 JULY 2015
LP Boiler FW Pumps H-463 A/B/C 2.500 1.000 0.800 6.000 3 CONTAINER 4.72 3 JULY 2015
Slope Oil Pump H-466 3.000 1.000 1.000 3.000 1 CONTAINER 1.09 3 JULY 2015
Sulfer Seal legs ME-431/441 8.500 0.700 1.000 11.900 2 CONTAINER 2.78 3 JULY 2015
Sulfer Seal legs (Filter) ME-431/441 1.500 1.200 0.600 2.160 2 CONTAINER 0.49 3 JULY 2015
Sulfer Seal legs (Lock Pot) ME-431/441 1.225 0.660 1.000 1.617 2 CONTAINER 0.46 3 JULY 2015
Sulfer Seal legs ME-432/442 8.500 0.700 1.000 11.900 2 CONTAINER 2.78 3 JULY 2015
Sulfer Seal legs (Filter) ME-432/442 1.500 1.200 0.600 2.160 2 CONTAINER 0.53 3 JULY 2015
Sulfer Seal legs (Lock Pot) ME-432/442 1.225 0.660 1.000 1.617 2 CONTAINER 0.63 3 JULY 2015
Sulfer Seal legs ME-433/443 8.500 0.700 1.000 11.900 2 CONTAINER 4.35 3 JULY 2015
Sulfer Seal legs (Filter) ME-433/443 1.500 1.200 0.600 2.160 2 CONTAINER 0.49 3 JULY 2015
Sulfer Seal legs (Lock Pot) ME-433/443 1.225 0.660 1.000 1.617 2 CONTAINER 0.63 3 JULY 2015
Sulfer Seal legs ME-434/444 8.500 0.700 1.000 11.900 2 CONTAINER 2.37 3 JULY 2015
Sulfer Seal legs (Filter) ME-434/444 1.500 1.200 0.600 2.160 2 CONTAINER 0.47 3 JULY 2015
Sulfer Seal legs (Lock Pot) ME-434/444 1.225 0.660 1.000 1.617 2 CONTAINER 0.49 3 JULY 2015
40FT. CONTAINER VAN 12.000 2.500 2.200 1,320 20 582.00 3 JULY 2015
STEEL CRADLES 12.000 3.000 2.400 1,728 20 608.00 3 JULY 2015
3,130.96 72 1,218.39
Page 3