Boc - Verification Report
Boc - Verification Report
Boc - Verification Report
Dear Sirs,
- PV Engineering agreed with the verification results and had updated the impacted
sections of the FS update (i.e Narrative and Economics, no impact on Technical
section). Consequently, tariff in Rev.01 was not materially affected in comparison
with Rev.00.
In conclusion, the verification of CAPEX by third party decreased CAPEX by 1.6 Million
USD after VAT, which is not a significant change and did not materially affect tariff
calculation. Therefore, SWPOC provide the verification results above for information and
kindly request that Foreign Partners approve the Feasibility Study Rev.01 so SWPOC can
proceed with next steps forward.
Yours sincerely,
Do Khang Ninh
General Director
Cc :
2
- Record, Commercial, Tech.
Attachment:
- Verification of CAPEX report
- Updated Feasibility Study Rev. 01