ISES CP Report 4
ISES CP Report 4
ISES CP Report 4
Title:
PhPC / Fugro SAE / MCS Oil
of
Final Report
REVISION STATUS
CONTENTS
EXECUTIVE SUMMARY...........................................................................................................................................6
1 INTRODUCTION..........................................................................................................................................7
1.1 Location Surveyed...........................................................................................................................7
2 PRESENTATION OF RESULTS..................................................................................................................8
2.1 TAURT NORTH 20” GAS PIPELINE...............................................................................................8
2.1.1 Location Surveyed................................................................................................................8
2.1.2 Anode Details.......................................................................................................................8
2.1.3 Contact Measurement Table................................................................................................8
2.1.4 Discussion............................................................................................................................9
2.1.5 CP Anomaly Highlights.........................................................................................................9
2.1.6 Conclusions..........................................................................................................................9
2.1.7 Recommendations...............................................................................................................9
2.1.8 Pipeline Charts...................................................................................................................10
3 CALIBRATION LOGS................................................................................................................................12
Page 5 of 12
EXECUTIVE SUMMARY
The CP survey of the Taurt North 20" Gas Pipeline was part of the PhPC/Fugro SAE Subsea Pipeline, Umbilical
and Structure Inspection 2014 campaign.
The survey was conducted from the vessel MV Fugro Navigator utilising the Seaeye Panther XT935.
The following offshore pipeline was surveyed to assess the condition of their cathodic protection (CP) system:
Summary of the Results for the Cathodic Protection Survey of Taurt South 20” Gas Pipeline
KP Length
Contact Anode
Pipeline ID Inspected (Km) CP Anomaly
Potential (mV) Wastage (%)
From To
Taurt North 20”
2.010 0.000 -1028 to -1039 0%-25% None
Gas
The pipeline Taurt North 20" Gas Pipeline was found to be cathodically protected against external corrosion
and the potential measurements recorded were within acceptable levels as described in the Recommended
Practice DNV-RP-B401, October 2010 (Amended April 2011) Standard *.
Section 5.4.2 “For a correctly designed galvanic anode CP system, the protection potential will for the main part of
the design life be in the range - 0.90 to - 1.05 (V). Towards the end of the service life, the potential increases rapidly
towards - 0.80 (V), and eventually to even less negative values, referred to as ‘underprotection’.
The term ‘over-protection’ is only applicable to protection potentials more negative than - 1.15 (V). Such potentials
will not apply for CP by galvanic anodes based on Al or Zn.” *
This document contains the CP survey report compiled from the data obtained during the Cathodic Protection
Monitoring Survey of the Taurt North 20” Gas Pipeline.
ISIS Technical Services Sdn Bhd was subcontracted by MCS Oil on behalf of PhPC and Fugro SAE to
provide cathodic protection survey equipment and services.
The readings obtained during the survey (but not limited to) include continuous potential and field gradient
measurement, both steel contact measurement on flanges and pipeline anodes.
The readings were obtained using the ISIS digital CPDAS (Cathodic Protection Data Acquisition System).
Contact Cathodic Potential (CP) & field gradient measurements were taken using a twin half cell CP probe.
The information was logged and processed using the computerised CPDAS (Cathodic Protection Data
Acquisition System) developed by ISIS.
The survey was performed in accordance with the guidelines as described in DNV RP B401 "Cathodic
Protection Design".
All calibrations were performed to DNV RP B403 "Monitoring of Cathodic Protection Systems” recommended
practice.
2 PRESENTATION OF RESULTS
*KP positions & events recorded are based upon raw data received from on-line navigation system.
Net
Length Dia. (I/D) Thickness Year of
Material Type Weight
(cm) (cm) (cm) Installation
(kg)
N/A Bracelet N/A N/A N/A N/A N/A
CP FG Depletion
KP Description
(mV) (uV/cm) (%)
1.998 Anode contact -1039 -37 25
1.993 Anode contact -1038 -67 25
1.882 Anode contact -1028 -116 25
1.690 Anode contact -1036 -107 <25
1.511 Anode contact -1036 -98 25
0.949 Anode contact -1039 -61 25
0.398 Anode contact -1038 -46 <25
0.207 Anode contact -1038 -34 <25
0.018 Anode contact -1038 -40 <25
0.006 Anode contact -1036 -21 <25
Note* Full anode details were unavailable at the time of writing this report and it was therefore not possible to
calculate anode current output and remaining life of the CP system.
Page 8 of 12
2.1.4 Discussion
As can be seen in the contact table in Section 2.1.3, the potential contact values obtained on this surveyed
pipeline were between -1028mV & -1039mV. These values would indicate that the level of cathodic protection is
within the accepted limits as specified in the DNV RP B401 Cathodic Protection Design.
Visually, the wastage estimate for the anodes observed during the survey were considered to be in the 0%-
25% (slight wastage) classification. It should be stressed that visual estimation of anode wastage can be
inaccurate and can often lead to misinterpretation regarding the level of wastage due to oxide coating and silt
or mud on the anode surface obscuring the observers view.
Anode field gradient activity was found to be increasing approaching the Taurt North Production Manifold
structure. This would suggest that there is a possible current drain from the pipeline to this structure. However,
the pipeline is well protected and the level of current drain observed should be monitored in upcoming regular
inspection programmes.
Nevertheless, the potential and field gradient activity observed during the survey would indicate that the
pipeline is protected against external corrosion.
2.1.6 Conclusions
Based on the results from the survey, the following conclusions can be drawn:
The surveyed pipeline was protected against external corrosion with potentials that were within the
limits as specified in DNV RP B401 Cathodic Protection Design.
Estimated depletions for all the surveyed anodes were considered to be less than 25%.
No CP anomalies were observed or detected.
2.1.7 Recommendations
Although the cathodic protection system for Taurt North 20" Gas Pipeline was found to be in good condition
and providing adequate protection against external corrosion, the pipeline should continue to be surveyed as
part of a regular planned inspection programme to ensure that the condition of the cathodic protection system
remains satisfactory.
Page 9 of 12