00EK
3 Months:
00EKT50-GH001 No PM 3M 1. Visual inspection of equipments for any phisical crack, broken or abnormal conditions.
2. Check if any condensate mark.
3. Check and confirm cable gland is tighten and no water ingress.
4. Check any error indication on HMI or PLC. Fix it as required.
00EKT51/52-GH001 No PM 3M 5. Chek any equipment is burnt or fault status as per eqipment manual
6. Check and remove any unnecessary components inside.
7. Check wiring drawing to be available inside cabinets.
8. Clean cabinets by vacumn cleanner.
11/12/13 EKY02-GH001 No PM 3M 9. Check power supply inlet within range of expection.
MBA/MBD
3 Months:
11/12/13 MBA10 No PM 3M and minor outage
1. Visual inspection of transmiters, conditioner and JBs phisical crack, broken or abnormal
conditions.
2. Check & confirm Junction box is tighten closed and no any condensate mark. .
3. Check the cable gland at equipments are firm and no water ingress.
4. Clean equipments.
5. Re-calibrate transmiters if calibration certificate is expired or observe any abnormal
reading value in DCS.
3 Months:
1. Visual inspection of transmiters, conditioner and JBs phisical crack, broken or abnormal
conditions.
11/12/13 MBA11 No PM 3M and minor outage 2. Check & confirm Junction box is tighten closed and no any condensate mark. .
3. Check the cable gland at equipments are firm and no water ingress.
11/12/13 MBD12 No PM 3M and minor outage 4. Clean equipments.
5. Re-calibrate transmiters if calibration certificate is expired or observe any abnormal
11/12/13 MBA22 No PM 3M and minor outage reading value in DCS.
MBA4
3 Months:
1. Visual inspection of transmiters, conditioner and JBs phisical crack, broken or abnormal
conditions.
2. Check & confirm Junction box is tighten closed and no any condensate mark. .
11/12/13 MBA41AA501/502 3. Check the cable gland at equipments are firm and no water ingress.
No PM 3M
11/12/13 MBA42AA501 4. Clean equipments.
5. Re-calibrate equipments if calibration certificate is expired or observe any abnormal
reading value in DCS.
6. Functional test (open/close) valves and confirm all working fine. Correc it if any abnormal
condition.
MBA4
MBV / MBK
3 Months:
MBX PM is available 3M
MBL
11/12/13 MBL PM is available 3M
11/12/13 MBA PM is available 3M
11/12/13 MBA20AA001 No PM 3M
MBR No PM 3M
MBA18 No PM 3M
2. Semi-Anual:
1. Check the heating of the sampling probes and check if parts become loose, like bolts of
the connecting flange or the lock screw of the ceramic probe filter at the backside tighten
where necessary. Check if heated tube is correctly fixed to the probe.
2. Replace the converter cartridge of the NO2/NO.converters in NOx analyzer
3. Anual:
1. Check the silicon tubes of the condensate pumps (in the gas cooler). If they are leaky
replace the tubes.
Semi-annual:
- Inspection the list of items as per O&M Manual.
Annual:
Contents of the maintenance:
- Checking the batteries
- Checking each detector for proper functioning
- Replacing system components, e.g. detectors, if necessary, if they are no longer within the
operational range specified by the manufacturer or a specified running time has been
exceeded.
- Checking the control panel for the proper functioning of alarm, error and control functions,
- Checking adjustments and installation and repeat if necessary,
- Carry out a walk-through to check all cable connections and devices for safety, damage
and sufficient protection
- Functional test of fire alarm control panel
Annual:
- Measure manually with a portable digital multimeter/ clamp amp meter system voltage and
current output.
- Measure pipeline On/Off potentials using existing reference electrodes (with portable
voltmeter).
- Measure potential differences between permanently installed reference electrodes and a
portable reference electrode. The difference shall not be more than +/- 30mV, local soil
variations may extend the limits and shall be determined case by case.
- Compare the values with values in the logbook.
- Adjust rectifier current output so pipeline off potentials are between -850 mV and -1150
mV vs Cu/CuSO4.
PM is available 3M
- Visual inspection: Exposed heating cable and pipe insulation should be checked to make
sure that no physical damage has occured. Fix it if any damage.
- Record should be filled out during maintenance of each circuit in your system.
- Function testing of electrical protection and temperature control systems. Correct if any
damage.
Semi-Annual:
- Visual inspection: Exposed heating cable and pipe insulation should be checked to make
sure that no physical damage has occured. Fix if any damage.
- Meggering test:
+ Insulation resistance from the main supply panel
+ Test is performed between L/N together and PE.
- Function testing of electrical protection and temperature control systems