Technical Information Letter: Load Coupling Nut Event
Technical Information Letter: Load Coupling Nut Event
Technical Information Letter: Load Coupling Nut Event
TIL 1298-1
GE ENERGY SERVICES
PRODUCT SERVICE
23 March 2001
APPLICABLE TO
Selected Gas Turbines and Steam Turbines with
Riverhawk Coupling hardware shipped prior to
November 2000.
PURPOSE RECOMMENDATIONS
Notify users of a potential personnel safety issue Users are requested to contact their local GE
resulting from liberation of coupling nut locking tab Energy Services representative for approved testing
during machine operation, and to recommend short- / inspection procedures.
term corrective actions
The affected parts are the cylindrical and hexagonal
BACKGROUND / DISCUSSION nuts for the coupling. GE part numbers
During a recent inspection at a customer site, a load 356A3962P003, 356A3954P001, 358A7395P003,
coupling nut-locking device was found to be 358A7395P005, 358A7395P009, 358A7395P010,
liberated. An RCA has determined that there is a 358A7202P002, 358A7202PP018, 358A7202P004,
potential for crack initiation at the locking device and 358A7202P019
groove (See Figure 1). This potential is greatest
during early operational life of the component.
MAINTENANCE
Sites currently in installation must perform NDT If the components are found to have experienced
inspections of these components to determine if crack initiation, your local GE representative should
crack initiation has occurred. Units currently be contacted for replacement parts.
operating should inspect the affected parts at the
next opportunity. Figure 1 shows a hexagonal nut
with a section of the locking device liberated.